Reinforcement Calculation
Reinforcement Calculation
CAJILLA
ITEM - III STEEL REINFORCEMENT
LENGTH OF REINFORCING BARS FOR CHB IN METERS
(M) LENGTH OF (M) LENGTH OF vertical spacing
VERT. SPACING
VERTICAL SPACEING LAYER HORIZONTAL
(CM)
REIN./SQ.M. REIN./ SQ.M.
FOOTING MATTING
Enter Footing Length L (M) 1.50 M
Enter Footing Width W (M) 3.00 M
Enter # of Bars along L # 20.00 Pcs
Enter Number of Bars along W # 10.00 Pcs
L Enter Number of Footing # 2.00 Units
Enter Clear Cover Cc (M) 0.075 M
Note: Standard Clear Cover for footing =0.05m to 0.075m
# of Bars
per Side Net. Length along L 1.35 M
W Net. Length along W 2.85 M
# OF REIN. BARS USED: 20.00 LHS
#16 TIE WIRE USED: 3.10 Kgs
Clear
Cover
Tie Bars
LT = TOTAL LENGTH/PERIMETER
D1
H
Clear Cover
for columns
D2 = 0.40m
1 0.2
Use End Hook: 0.200 M
Total length of each bars should be more than or equal to: 4.20 M
Total Number of Vertical Bars @ 6M: 48.00 LHS
6 Circular Stirrups
Cut Length of each stirrups: 0.90 M
Number of Stirrups per Column: 28.50 M
Total Number of Bars required for stirrups @ 6M : 35.00 LHS
#16 TIE WIRE required: 7.80 Kgs
Spiral Stirrups
Cut Length of each stirrups: 0.70 M
Number of Stirrup Loops per Column: 28.50 M
Total Number of Bars required for stirrups @ 6M : 30.00 LHS
#16 TIE WIRE required: 7.80 Kgs
BEAM REINFORCEMENT (BEAM TO BEAM = LESS THAN 6.0 METERS) ONE BAY
Web Bars
Web Bars - - 12.00 mm
Note: put "0" zero if web bars not applicable
Bottom Bars 2 -
Bottom Bars 12.00 mm
L = Span
L/4
0.15L
Column
Width
TOP BARS
# of 6m Length Deformed Bars required as Continuous Bars 2.00 PCS
# of 6m Length Deformed Bars required as Non-Continuous Bars - PCS
WEB BARS
# of 6m Length Deformed Bars required as Web Bars - PCS
BOTTOM BARS
# of 6m Length Deformed Bars required as Continuous Bars 2.00 PCS
# of 6m Length Deformed Bars required as Non-Continuous Bars - PCS
Web Bars
Web Bars - - 10.00 mm
Note: put "0" zero if web bars not applicable
Bottom Bars 2 -
Bottom Bars 12.00 mm
0.15 L
0.15 L
Column
Width
TOP BARS
# of 6m Length Deformed Bars required as Continuous Bars 4.00 PCS
# of 6m Length Deformed Bars required as Non-Continuous Bars - PCS
WEB BARS
# of 6m Length Deformed Bars required as Web Bars - PCS
BAR SPACING IN CM. NUMBER OF STEEL BARS PER SQUARE METER TIES (KGS)
10.000 3.764 0.474
12.500 3.062 0.316
15.000 2.584 0.228
17.500 2.232 0.168
20.000 1.980 0.132
22.200 1.786 0.110
25.000 1.627 0.089
BAR SPACING IN CM. NUMBER OF STEEL BARS PER SQUARE METER TIES (KGS)
10.000 4.369 0.592
12.500 3.603 0.416
15.000 3.221 0.350
17.500 2.647 0.247
20.000 2.360 0.174
22.200 2.168 0.168
25.000 1.977 0.142
CONCRETE STAIRS
Enter Riser Height RH (M) 0.20 M
Enter Tread Run TR (M) 0.30 M
TR Enter Stair Width W (M) 1.00 M
W
Enter # of Steps N 10.00 Steps
RH Enter Stringer Thickness TS (M) 0.15 M
0.30 0.36 0.66
Enter Spacing (M)
0.30
Enter Spacing (M) Enter Steps Lateral Bar diameter (mm)
0.30 12
Enter Stringer Lateral Bar diameter (mm)
16 TS
Enter Spacing (M)
0.30
Enter Spacing (M) Enter Steps Lateral Bar diameter (mm)
0.30 12
Enter Stringer Horizontal Bar diameter (mm)
12
Number of 12 mm Lateral Bars required @ Steps PCS @ 6M 5.00 PCS
Number of 12 mm Horizontal Bars required @ Steps PCS @ 6M 5.00 PCS
Number of 16 mm Lateral Bars required @ Stringer PCS @ 6M 4.00 PCS
Number of 12 mm Horizontal Bars required @ Stringer PCS @ 6M 2.00 PCS
# OF #16 TIE WIRE USED KGS 1.00 KGS
NOTES: DOWELS FOR LATERAL BARS ARE ALREADY INCLUDED IN THE ESTIMATES
FOR STAIRS LANDINGS YOU MAY USE THE SLAB REINFORCEMENT CALCULATOR
CONCRETE CANAL
CANAL PCS
Enter # of Horizonal Barsfor Walling (2 sides) 4.00 PCS
FLOORING
BOTTOM PCS
Enter # of Horizonal Bars for flooring 3.00 PCS
WIDTH Enter U bar spacing (M) 0.60 M
7.5 0.5 1
CONCRETING Enter Concrete Mix Design (CLASS) A or B B 1:3:6
Canal Flooring Total Volume 7.50 cu.m. 56.25 28.13
Canal Top Stiffener Total Volume 1.00 cu.m. 9.00 1.00
# of Bags cement 66.00 BAGS
Volume of Sand 29.13 CU.M.
Volume of 3/4 Gravel 7.50 CU.M.
MASONRY
# of CHB used 550.00 PCS
AREA 120
MORTAR USING 4" CHB
# OF CEMENT BAGS 63.00 BAGS
VOL. OF SCREENED SAND CU.M. 5.30 CU.M.
MORTAR USING 6" CHB
# OF CEMENT BAGS 122.00 BAGS
VOL. OF SCREENED SAND CU.M. 10.20 CU.M.