0% found this document useful (0 votes)
395 views5 pages

Form Maintenance Edited

The document is a network maintenance form from the Development Center of Information System and Technology for Education Management. It contains details of a network issue such as the visual status of fiber optic, WLAN, UTP/STP connections and components. It also includes configuration details like router OS, IP addresses, firewall settings and link test results. The form is used to document the problem cause, actions taken, and equipment replacements if needed.

Uploaded by

raka rifaldi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
395 views5 pages

Form Maintenance Edited

The document is a network maintenance form from the Development Center of Information System and Technology for Education Management. It contains details of a network issue such as the visual status of fiber optic, WLAN, UTP/STP connections and components. It also includes configuration details like router OS, IP addresses, firewall settings and link test results. The form is used to document the problem cause, actions taken, and equipment replacements if needed.

Uploaded by

raka rifaldi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

Kampus Dipatiukur

Gd. Rektoran Baru Lt.1, phone. 022-2503271 ext. 126


Kampus Jatinangor
Development Center of Information System and Technology for Education Management Gd. Pusat Administrasi (BAU) Lt. 2, phone. 022-76927397
NETWORK MAINTENANCE FORM
No. WO :
Customer : Contact Person :
Location : Telephone :
Engineer : Engineer Time Arrival :

I. DETAIL DESCRIPTION AT TIME FAILURE

II. VISUAL STATUS / LED DISPLAY


Fiber Optic WLAN UTP/STP Hotspot
Connector : Connector : Connector : Connector :
Switch : Switch : Switch : PoE :
DSP : DSP : DSP :
Converter : Radio :
PoE :

NIC1 Router : NIC3 Router : Electrical Status : volt


NIC2 Router : NIC4 Router : Electrical Grounding : ohm

III. CONFIGURATION STATUS


Router OS : Routing : Signal Strenght :
IP Address : Firewall : TX/RX (AVG) :
IP Gateway : QoS :

IV. LINK TEST


Ping Test IP Address Losses Min (ms) Max (ms) Avg (ms)
Gateway (100x)
Yahoo (100x)
Bandwith Test URL : IIX : | kbps : http://www.sijiwae.net/speedtest/
International : | kbps : http://www.speakeasy.net/speedtest/
Intranet : | kbps : http://support.unpad.ac.id/BWMeter/
V. EQUIPMENT REPLACEMENT
EQUIPMENT Note OLD S/N Note NEW S/N Note REMARK

VI. PROBLEM SUMMARY


1. CAUSED OF FAILURE 2. ACTION TAKEN REMARK

Time Problem Solved :


Engineer Signature Customer Signature
Development Center of Information and System Technology for Education and Management
Jl.Dipati Ukur No. 35 Bandung Telpon.022-70820020

DCISTEM - INSTALLATION REPORT

Customer : Telephone :
Router Location : Date :
Contact Person : No. WO :

I. EQUIPMENT
Equipment Type Merk Serial Number Qty Remarks
Antenna
AP CPE
Router
Switch
Arrester
Electric Terminal
Stecker
Connector
Surge Arrester
POE & Adapter
Others
Equipment Type Merk Length Qty Remarks
UTP
STP
Fiber Optic
Jumper
Elcectric Cable
Patch Core
Others

II. CONNECTION STATUS Ready Pending Failure


System Identity : Connection to Gateway :
IP Address : Connection to DNS :
:
Wireless Mode : Signal Strenght (AVG) :
IP Address : TX/RX Rate (AVG) :
Radio Name : Frequency :

III. INSTALLATION SUMMARY

Form instalasi ini sekaligus berlaku sebagai SURAT TUGAS & BERITA ACARA INSTALASI yang digunakan sebagaimana mestinya

Engineer Signature Customer Signature

F-2 Installation Form


Development Center of Information and System Technology for Education and Management
Jl.Dipati Ukur No. 35 Bandung Telpon.022-70820020

F-2 Installation Form


PRE INSTALLATION CHECK LIST

Customer : Telephone :
Location : Date :
Engineer Time Arrival : Engineer :
Contact Person : No. WO :

Dcistem Service : Backbone : Lan : Hotspot : Other :

I. PLACE DESCRIPTION
Indoor Unit Location : Distance RO to Ring Backbone :
Outdoor Unit Location : Distance RO to ODU :
Visual LOS : Distance ODU to BTS :
Obstacle : Coordinate :
Bearing : :

II. AC POWER SOURCE


PLN Genset UPS
Volt Meter Reading : Line to Neutral : Volt
Ground to Line : Volt
Ground to Neutral : Volt

Earth Resistance : Lightning Arrester No Arrester

III. EQUIPMENT
CPU Eth Card Keyboard Monitor Switch
STP UTP RJ-45 AP CPE POE
Adapter Stecker Antenna Klem PVC
Fiber Optic Converter Patch Core Tower Jumper
AP Hotspot Box Mounting Arrester UPS
Electric Terminal Electric Cable Wiring Duct
Data Cable Approximately : Meters FO/STP/UTP
Electric Cable Approximately : Meters

IV. SURVEY SUMMARY

Form survey ini sekaligus berlaku sebagai SURAT TUGAS & BERITA ACARA SURVEY yang digunakan sebagaimana mestinya

Engineer Signature Customer Signature

You might also like