E& I RFI Schedule: Jizan Refinery & Marine Terminal Project (Epc-Package 14)
E& I RFI Schedule: Jizan Refinery & Marine Terminal Project (Epc-Package 14)
E& I RFI Schedule: Jizan Refinery & Marine Terminal Project (Epc-Package 14)
Visual Inspecton of flame Detector Device Installaton at inside Sulfur stacker-Area as per highlighted on Attached Drawing. T36- SATIP-B-014-01
1 4-Jul-19 Instrument FA Device IN-CON-FA-5140 FA SAIC-B-6105 SSRB T36 VA-306113 1 3 H W 6-Jul-19 8:30 AM Ashfaque Rashid Farnando Audie
BE-9101B, T36-BE-9101C,T36-BE-9101F,T36-BE-9101G,T36-BE-9101J,T36-BE-9101,T36-BE-9101H, T36-BE-9101M, T36-BE-9101K (3.01)
Visual Inspecton Installaton of Horn & Beacon ( T36-XA-9101B, T36-AL-9101B, T36-XA-9101E, T36-AL-9101E, T36-XA-9101H, SATIP-B-014-01
2 4-Jul-19 Instrument Horn & Beacon IN-CON-FA-5141 FA T36-AL-9101H, T36-XA-9101K, T36-AL-9101K, T36-XA-9101N, T36-AL-9101N) For Fire Alarm Systems at outside Sulfur stacker- SAIC-B-6103 SSRB T36 VA-306113 1 3 H W 6-Jul-19 8:45 AM Ashfaque Rashid Farnando Audie
(2.03)
Area as per highlighted on Attached Drawing
Field Witness Inspecton of Field Calibraton and functonal Test, Motor Operated Vales T01-MOV-1017/T01-MOV-1024/T01-MOV-1043 SATIP-J-700-01 VE-374145
3 4-Jul-19 Instrument IN-CON-CB-5142 CB SATR-J-6701 Berth#1&2 T01 8,11,20 2 H W 6-Jul-19 9:00 AM Ashfaque Rashid Hasmi Sant
Calibratoin At Berth-01 upside platform (5.01) Data Sheet
Visual Inspecton for LV Cable Pulling for Lightng from: CKT # T95-095-SLP-001/N3 at Out Side Substaton Building . as per SATIP-P-104-01
4 4-Jul-19 Electrical LTG Cable EE-CON-LT-9485 LT SAIC-P-3207 TSB T95 VA-373687 1 4 H W 6-Jul-19 8:00 AM Khuram Ramil.D Glenn Imtaz Ali
attached and highlighted drwaing (3.1)
LTG Cable Visual Inspecton for LV Cable Glanding,Dressing,Identficaton for Lightng from: CKT # T95-095-SLP-001/N3 at Out Side SATIP-P-104-01
5 4-Jul-19 Electrical EE-CON-LT-9486 LT SAIC-P-3207 TSB T95 VA-373687 1 4 H W 6-Jul-19 8:15 AM Khuram Ramil.D Glenn Imtaz Ali
Glanding Substaton Building . as per attached and highlighted drwaing (3.6)
Visual Inspecton for LV Cable Contnuity and IR Test for Lightng from: CKT # T95-095-SLP-001/N3 at Out Side Substaton Building . SATIP-P-104-01
6 4-Jul-19 Electrical LTG Cable IR EE-CON-LT-9487 LT SATR-P-3203 TSB T95 VA-373687 1 4 H W 6-Jul-19 8:30 AM Khuram Ramil.D Glenn Imtaz Ali
as per attached and highlighted drwaing (4.1)
LTG Cable Visual Inspecton for LV Cable Terminaton and Torquinng Test for Lightng from: CKT # T95-095-SLP-001/N3 at Out Side Substaton SATIP-P-104-01
7 4-Jul-19 Electrical EE-CON-LT-9488 LT SATR-P-3205 TSB T95 VA-373687 1 4 H W 6-Jul-19 8:45 AM Khuram Ramil.D Glenn Imtaz Ali
Terminaton Building . as per attached and highlighted drwaing (4.2)
Visual Inspecton for Lightng Fixture Installaton for: CKT # T95-095-SLP-001/N3 at Out Side Substaton Building . as per attached SATIP-P-123-01
8 4-Jul-19 Electrical Lightng Fixture EE-CON-LT-9489 LT SAIC-P-3618 TSB T95 VA-373687 1 4 H W 6-Jul-19 9:00 AM Khuram Ramil.D Glenn Imtaz Ali
and highlighted drwaing (3.3)
Visual Inspecton of (1") PVC Coated GRS Conduit installaton for Lightng T36-095-EBLP-001/E5,E6,E9,E14 at Sulfure Stacker SATIP-P-104-05
9 4-Jul-19 Electrical Conduit EE-CON-CD-9490 CD SAIC-P-3323 SSRB T36 VA-306098 1 4 H W 6-Jul-19 9:15 AM Khuram Ramil.D Srinivasan Imtaz Ali
Reclaim Buildinng Center side . As per attached and highlighted drawing. (3.3)
Visual Inspecton of (1") PVC Coated GRS Conduit installaton for LCS of Motor T36-UM-0171 A at Sulfure Stacker Reclaim SATIP-P-104-05
10 4-Jul-19 Electrical Conduit EE-CON-CD-9491 CD SAIC-P-3323 SSRB T36 VA-306098 1 4 H W 6-Jul-19 9:30 AM Khuram Ramil.D Srinivasan Imtaz Ali
Buildinng Center side . As per attached and highlighted drawing. (3.3)
Visual Inspecton of (1") PVC Coated GRS Conduit installaton for Lightng T36-095-EBLP-001/E2 at Sulfure Stacker Reclaim SATIP-P-104-05
11 4-Jul-19 Electrical Conduit EE-CON-CD-9492 CD SAIC-P-3323 SSRB T36 VA-306098 1 4 H W 6-Jul-19 9:45 AM Khuram Ramil.D Srinivasan Imtaz Ali
Buildinng Center side . As per attached and highlighted drawing. (3.3)
12 4-Jul-19 Electrical Receptacle EE-CON-EI-9493 EI Visual inspecton of Welding Receptacle Installaton TAG # T04-095-WR-001,T04-095-WR-002,T04-095-WR-003,T36-095-WR-013 SATIP-P-104-12 SATR-P-3603 SSRB T36 VA-306098 1 4 H W 6-Jul-19 10:00 AM Khuram Ramil.D Srinivasan Imtaz Ali
at Berth 4 Area. As per attached highlighted dwg. (3.4)
13 4-Jul-19 Electrical Lightng Fixture EE-CON-LT-9494 LT Visual Inspecton installaton of (FL-1A 36W x 2) Ceiling Mounted type Lightng Fixture 10 pcs for the CKT # T02-095-BLP-001/N19 SATIP-P-123-01 SAIC-P-3618 Berth#2 T02 VA-373703 1 3 H W 6-Jul-19 8:00 AM Kashif Muthu Glenn Audie
Hvac Equipment Room at Berth 2 Area. as per attached and highlighted drwaing. (3.3)
14 4-Jul-19 Electrical Lightng Fixture EE-CON-LT-9495 LT Visual Inspecton installaton of (FL-1A 36W x 2) Ceiling Mounted type Lightng Fixture for the CKT # T02-095-BLP-001/N6,N7 Rack SATIP-P-123-01 SAIC-P-3618 Berth#2 T02 VA-373703 1 3 H W 6-Jul-19 8:15 AM Kashif Muthu Glenn Audie
room and Electrical room at Berth 2 Area. as per attached and highlighted drwaing. (3.3)
15 4-Jul-19 Electrical Wire Pulling EE-CON-LT-9496 LT Visual Inspecton for Bulding wire Pulling for LIGHTING(Type FL-2A) from: CKT # T02-095-BLP-001/N19 at Hvac Room Berth # 2 SATIP-P-104-01 SAIC-P-3208 Berth#2 T02 VA-373703 1 3 H W 6-Jul-19 8:30 AM Kashif Muthu Glenn Audie
Area . as per attached and highlighted drwaing (3.2)
Visual Inspecton for Building wire Glanding/dressing and Identficaton installaton From: CKT # T02-095-BLP-001/N6,N10 at rack SATIP-P-104-01
16 4-Jul-19 Electrical Wire Glanding EE-CON-LT-9497 LT SAIC-P-3208 Berth#2 T02 VA-373703 2,3 3 H W 6-Jul-19 8:45 AM Kashif Muthu Glenn Audie
rom, observaton,pantry janitor,rest room at Berth #2 Area . as per attached and highlighted drwaing. (3.7)
Witness of LV Cable/wire IR & Contnuity test from: CKT # T02-095-BLP-001/N6,N10 at rack rom, observaton,pantry janitor,rest SATIP-P-104-01
17 4-Jul-19 Electrical Wire IR Test EE-CON-LT-9498 LT SATR-P-3204 Berth#2 T02 VA-373703 2,3 3 H W 6-Jul-19 9:00 AM Kashif Muthu Glenn Audie
room at Berth #2 Area . as per attached and highlighted drwaing. (4.2)
Wire Witness of Building wire Terminaton torque test FROM: CKT # T02-095-BLP-001/N6,N10 at rack rom, observaton,pantry SATIP-P-104-01
18 4-Jul-19 Electrical EE-CON-LT-9499 LT SATR-P-3206 Berth#2 T02 VA-373703 2,3 3 H W 6-Jul-19 9:15 AM Kashif Muthu Glenn Audie
Terminaton janitor,rest room at Berth #2 Area . as per attached and highlighted drwaing. (4.4)
Visual Inspecton of LV Heat tracing system Self regulatng Cable pulling/Installaton, Tag#T95-095-PP(EHT)-052(ET-86-5,86-6) SATIP-HENC-ITP-P- SAIC-HIC-P-002
19 4-Jul-19 Electrical EHT SR Cable EE-CON-CA-9500 CA Berth#1&2 T02 VA-373741 1 0 H W 6-Jul-19 8:10 AM Arif Muthu Glenn Imtaz Ali
@Between berth 1 & 2 area .As per attached highlighted dwg. 001-01 (3.1)
EHT SR Cable Witness of LV Heat tracing system Self regulatng Cable Insulaton resistance and contnuity test,Tag#T95-095-PP(EHT)-052(ET-86- SATIP-HENC-ITP-P- SAIC-HIC-P-003
20 4-Jul-19 Electrical EE-CON-CA-9501 CA Berth#1&2 T02 VA-373741 1 0 H W 6-Jul-19 8:20 AM Arif Muthu Glenn Imtaz Ali
IR 5,86-6) @Between berth 1 & 2 area .As per attached highlighted dwg. 001-01 (4.1)
Visual Inspecton of LV Heat tracing system Self regulatng ( ZT)Electrical control module with Sensor/Thermostat SATIP-HENC-ITP-P- SAIC-HIC-P-002
21 4-Jul-19 Electrical EHT ZT EE-CON-CA-9502 CA Berth#1&2 T02 VA-373741 1 0 H W 6-Jul-19 8:30 AM Arif Muthu Glenn Imtaz Ali
Installaton,Tag#T95-095-PP(EHT)-052(ET-86-5,86-6) @Between berth 1 & 2 area.As per attached highlighted dwg. 001-01 (3.1)