Z+ G+ G+ G+ : STR & Dwawing

The document provides instructions for creating engineering drawings and estimates. It lists several elements that should be shown in the drawings, such as a wooden platform design, isolated material component details, and a base and rate design. It also notes specifications that should be provided for a conveyor. For the estimates, it recommends adjusting the earthwork calculation, adding reinforcement details to the footing design, and increasing the reinforcement percentage. Electrical work details and calculations should also be added instead of lump sums.

Uploaded by

rahul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views1 page

Z+ G+ G+ G+ : STR & Dwawing

The document provides instructions for creating engineering drawings and estimates. It lists several elements that should be shown in the drawings, such as a wooden platform design, isolated material component details, and a base and rate design. It also notes specifications that should be provided for a conveyor. For the estimates, it recommends adjusting the earthwork calculation, adding reinforcement details to the footing design, and increasing the reinforcement percentage. Electrical work details and calculations should also be added instead of lump sums.

Uploaded by

rahul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Str & Dwawing.

 Acceblign for z+=g+=g+= g+=door is not shown.


 Show design wooden platform
 Show detail design of isolatted, Mat combined noothing and show mimioniment lotail.
 Show design of Base & Rate, Botton place
 Provide specification for conveyor.
 Snow Detail section of built up I-Beam.
 stirmp detial for follmn is not snow.
Estimate part.
 Earthwork in Nearation is taken for omeg tea 0.6m which is insulticient.
 In RCE for footing taperk part is not considenred.
 Reiniorcoment work is taken eniy 0.8% of RCE volume which is insufficient
 Add rate analysis of each and every item used in abstract of cost.
 Add detial of item used in eletical work and calculated amount of electrical work instead of usding it