Gantt Chart

This document provides a timeline chart that outlines a 14 week project plan. It includes 5 chapters that will be developed over the 14 week period, with Chapter 1 taking 3 weeks, Chapter 2 taking 3 weeks, Chapter 3 taking 2 weeks, Chapter 4 taking 4 weeks, and Chapter 5 taking 2 weeks. The total time planned for the project is 14 weeks.

Uploaded by

Hamza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

Gantt Chart

This document provides a timeline chart that outlines a 14 week project plan. It includes 5 chapters that will be developed over the 14 week period, with Chapter 1 taking 3 weeks, Chapter 2 taking 3 weeks, Chapter 3 taking 2 weeks, Chapter 4 taking 4 weeks, and Chapter 5 taking 2 weeks. The total time planned for the project is 14 weeks.

Uploaded by

Hamza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

1.

2 WORK PLAN
The following is a time line chart that illustrates the project plan:

Table 1. 1 Time line chart

Activity Duration (14 weeks)

Development phase 0-3 4-7 8-12 13-14 Duration(weeks)

weeks weeks weeks weeks

Chapter 1 3

Chapter 2 3

Chapter 3 2

Chapter 4 4

Chapter 5 2

Total time(weeks) 14