100% found this document useful (2 votes)
659 views4 pages

Electrical, Instrumentation & Safety Check List

This document is a checklist for electrical, instrumentation, and safety inspections for the Khilala Gas Compression Package project. It provides 27 items to check for electrical equipment, 21 items for instrumentation, and 17 safety inspection items. The checklist will be used to ensure all electrical, instrumentation, and safety systems for the gas compression package are properly installed and functioning correctly according to project specifications.

Uploaded by

Hisham Elsayed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
659 views4 pages

Electrical, Instrumentation & Safety Check List

This document is a checklist for electrical, instrumentation, and safety inspections for the Khilala Gas Compression Package project. It provides 27 items to check for electrical equipment, 21 items for instrumentation, and 17 safety inspection items. The checklist will be used to ensure all electrical, instrumentation, and safety systems for the gas compression package are properly installed and functioning correctly according to project specifications.

Uploaded by

Hisham Elsayed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

KHILALA GAS COMPRESSION PACKAGE

Doc No : EMC-PRJ-CHK-002 Date : 03/07/2019


Doc Title : Electrical, Instrument and Safety Check List Rev : 0

OWNER DISOUQ PETROLEUM COMPANY


EPC CONTRACTOR EGYPTIAN MAINTENANCE COMPANY
PACKAGE SUPPLIER DEEP INTERNATIONAL DMCC
PROJECT KHILALA GAS COMPRESSION PACKAGE

Electrical, Instrument and Safety Check List

0 Issue For Review 03/07/2019 ASV AP AP

REV DESCRIPTION DATE PREPARED CHECKED APPROVED


KHILALA GAS COMPRESSION PACKAGE

Doc No : EMC-PRJ-CHK-002 Date : 03/07/2019


Doc Title : Electrical, Instrument and Safety Check List Rev : 0

1. ELECTRICAL EQUIPMENT’S CHECKLIST

Sr. No. Content Yes No N/A


1 Check Installation As Per P&Id And GA Drawing □ □ □
2 Witness tests when notified and record test data if □ □ □
desired
3 Make insulation test of all wiring using a me ohmmeter □ □ □
4 Check lighting circuits and intensities □ □ □
Make insulation tests of motor windings and of
5 alternator generator windings from phase to phase, and □ □ □
phase to ground using a me ohmmeter
6 Make grounding system tests to determine continuity of □ □ □
connections and value of resistance to ground
7 Check oil level of generator □ □ □
8 Check adjustments on all motor control and switchgear □ □ □
equipment
9 Check switchgear and motor control center relays for □ □ □
proper functioning
10 Has the Cable/Conduit been Pulled, Installed, and □ □ □
Terminated
11 Have Merger Tests Been Completed for The Cables □ □ □
12 Have Transformer Oil Levels Been Checked □ □ □
13 Have Protection Relays Been Set, Adjusted, and □ □ □
Recorded
14 Have Electrical Motors No-load tested and rotation □ □ □
verified
15 Have Electrical Motors Been Megger Tested □ □ □
16 Has the Field PLC Been Powered and Verified □ □ □
Operational
17 Has the Fire and Gas Detection Panel Been Powered □ □ □
and Verified Operational
18 Has the Flare Panel Been Powered and Verified □ □ □
Operational
19 Have Loop Checks Been Made □ □ □
20 Have End Devices Been Check with The Cause and □ □ □
Effect Chart to Verify Functionality
21 Check local inspector’s/authority approval □ □ □
22 Check phase sequence and polarity □ □ □
23 Check bearing, winding temperatures and vibration □ □ □
24 Check installation of emergency and instrument power □ □ □
systems
25 Check installation of electrical tracing system □ □ □
26 Check That It Cover All Parameter As Per QAP □ □ □
27 Check Identification Tags □ □ □
28 Check all report and certificates □ □ □
KHILALA GAS COMPRESSION PACKAGE

Doc No : EMC-PRJ-CHK-002 Date : 03/07/2019


Doc Title : Electrical, Instrument and Safety Check List Rev : 0

2. INSTRUMENT CHECKLIST
Sr.
Content Yes No N/A
No.
1 Check Installation As Per P&Id And GA Drawing □ □ □
2 Check Identification Tags □ □ □
3 Check all report and certificates □ □ □
check pointer travels and verify instrument capability to
4 measure, operate and stroke in the direction and □ □ □
manner required by the process application
5 check Field calibrate instruments with standard test □ □ □
equipment
6 check Fully pressurize and energize the transmitting □ □ □
and control signal system
7 check open process connections at primary sensors □ □ □
and final regulators and control
check Installation and connected all system
8 components and verify their conformance with □ □ □
specifications and design criteria for function and range
using dummy transmitted signals as needed
9 check all transmission and control □ □ □
10 Check control circuits in accordance of QAP □ □ □
11 Check all electrical signals and alarm wiring for □ □ □
continuity, correct sources of power and polarity
12 Check all electrical signals and alarm wiring for □ □ □
continuity, correct sources of power and polarity
13 Check thermocouples for proper joining of wires, proper □ □ □
polarity and continuity of receiving instruments
14 check inline components such as control valves, □ □ □
positive displacement meters, turbine meters, etc.
15 Check bores of orifice plates □ □ □
16 Check designation and function of each isolator and □ □ □
fuse in electric systems
17 Check operation of automatic transfer systems, reset □ □ □
mechanisms, etc.
18 Loop checks all instrumentation from field to control □ □ □
room.
19 Witness all loop checks □ □ □
Check all control valves, on/off valves, lubricate as
20 required □ □ □

21 Test and adjust all safety devices and seals where □ □ □


necessary use as per QAP
Check all safety devices e.g. pressure relief valves after
22 testing □ □ □
KHILALA GAS COMPRESSION PACKAGE

Doc No : EMC-PRJ-CHK-002 Date : 03/07/2019


Doc Title : Electrical, Instrument and Safety Check List Rev : 0

3. SAFETY INSPECTION CHECKLIST

Sr.
Content Yes No N/A
No.
1 Are all work place clean and in good condition □ □ □
Is all Installation in good/stable condition and properly
2 □ □ □
adjusted
3 Are all walking or working surfaces free of □ □ □
tipping/slipping hazards
Are emergency phone numbers and procedures posted □ □ □
4
at or near telephones
5 Are machine and belt guards in place and in good □ □ □
condition
6 All moving parts are covered □ □ □
7 Is pedestal machinery securely anchored to the floor? □ □ □
8 Is all piping appropriately identified as to □ □ □
contents/direction of flow
9 Are hot pipes and surfaces guarded against contact □ □ □
and clearly marked “HOT”
10 Are exit signs posted and properly illuminated to clearly □ □ □
indicate exits
11 Are electric hand tools properly grounded/insulated □ □ □
12 Is the area free of extension cords □ □ □
13 Are circuit breaker panels free of combustible materials □ □ □
Is emergency equipment (alarm pull boxes, eyewashes,
14 showers, etc.) accessible and not blocked by □ □ □
equipment
15 Is all emergency equipment in good condition □ □ □
Is good housekeeping practiced in work area (Is it free
16 of debris, combustibles, obstructions? Are aisles □ □ □
maintained?
17 Are ladders is good and safe to use □ □ □
18 Are no smoking regulations clearly posted □ □ □
19 Are all extinguishers in place and properly mounted □ □ □