100% found this document useful (1 vote)
159 views2 pages

1.3. Contents of The M&E Module

This document outlines the contents and structure of an M&E (monitoring and evaluation) module. The module contains 8 main sessions that cover: an introduction and objectives; an overview of project M&E; the role of M&E in project cycle management; developing an M&E system and framework; integrating M&E and database management; approaches to M&E planning and implementation; creating M&E reports; and concluding with a post-test evaluation.

Uploaded by

Sam ONi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
159 views2 pages

1.3. Contents of The M&E Module

This document outlines the contents and structure of an M&E (monitoring and evaluation) module. The module contains 8 main sessions that cover: an introduction and objectives; an overview of project M&E; the role of M&E in project cycle management; developing an M&E system and framework; integrating M&E and database management; approaches to M&E planning and implementation; creating M&E reports; and concluding with a post-test evaluation.

Uploaded by

Sam ONi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

1 There are many ways to self-introduction or warm up during this first stage of the session including pairing participants to

interview each other about name, family status and expectations right away.
1.3. Contents of the M&E module
There are 8 main sessions included in this module:
1) General Introduction
Self-introduction
Objectives of the modules
6|Page
Contents of the module
Pre-test of the module

2) Overview of M&E module


What is project PME?
Why is PI important in PME?
How to ensure obtaining effective PME?
Recommended tools and/or techniques to be used in PME

3) M&E in Project Cycle Management (PCM)


Definitions
Why M&E important in PCM?
The differences between Monitoring & Evaluation

4) M&E System and Framework,


Elements of a good M&E system
Tasks in Monitoring and Evaluation (tasks for monitoring and tasks for evaluation)
Steps in Monitoring and Evaluation (steps for monitoring and steps for evaluation)
Key Criterion for Monitoring and Evaluation
Planning and steps for Project Monitoring and Evaluation

5) M&E and Database Management System (DMS),


What is DMS?
Why DMS is important in Project Cycle Management
How to do it? and suggested tools

6) M&E Approach
Utilizing Logical Framework Approach
Understanding about Indicators
M& Planning and Implementing or launching

7) M&E Report and


What is M&E report?
Why is it important to have M&E report?
Process of reporting and dissemination
Characteristic of good M&E reporting

8) Post-Test and Evaluation


Post test and wrap up the session

You might also like