QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE XI
CONTRACT CONTRACT NO.GTC/488G/2012 ADDENDUM-S14
EQUIPMENT POWER TRANSFORMER-| | DOCREF | PHIL-8G-10-25-006 [REV [A
D
SITE LOCATION 6611 KV AL KHALDIYAH sis |PATE __loulos| 2016.
PAGENO | of 2
SITE ACCEPTANCE TEST FORMS FOR 66/11kV 40MVA POWER TRANSFORMER
5. Vector Group Test
(Applicable Standard - LEC 60076-1:2011- Clause 11.3)
Test Set Up
es
Test procedure
* Do the connections as shown in the fig
* Select the normal tap
* Isolate primary/secondary/neutral earth.
* Short R-r, Apply 3 phase 415V to R-Y-B HV side of the terminals.
‘* Measure the voltages given below table,
+ From the measured voltages check the following conditions
Condition to check for Dyn
B-b=B-y
Y-y< Yo
Y-y [Tuo | Bb una] Bm [asp
‘Compare the Values for the Following Combinations
1. Bb=By
2.Y-y< Yor
3. Y-y