This document outlines the details of lift upgrading works for various HDB blocks, including location, number of storeys, working load limit, and number of lifts. It is divided into two cases. Case 1 provides these details for 9 locations (A to I) with multiple blocks listed under each location. Case 2 then provides updated details for the same locations and blocks.

Uploaded by

KTMO
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views93 pages

Working Load (14!03!09)

This document outlines the details of lift upgrading works for various HDB blocks, including location, number of storeys, working load limit, and number of lifts. It is divided into two cases. Case 1 provides these details for 9 locations (A to I) with multiple blocks listed under each location. Case 2 then provides updated details for the same locations and blocks.

Uploaded by

KTMO
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 93

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

NO OF
LOCATION & BLOCK NOS STOREY NO WORKING LOAD
LIFTS

(A) TAMPINES STREET 41

C1 C2

401 12 402 140 1

402 4 203 117 2

403 12 402 140 2

404 4 203 117 3

405 12 402 140 2

406 12 402 140 3

407 12 402 140 2

(B) TAMPINES STREET 41 & 42

C1 C2

418 12 402 140 2

419 12 402 140 2

420 12 402 140 1

421 12 402 140 1

422 4 203 117 2

423 12 402 140 1

424 12 402 140 1

447 4 203 117 2

(C) TAMPINES STREET 81

C1 C2

821 4 203 117 2

822 4 203 117 2

824 4 203 117 3

825 4 203 117 2


SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

NO OF
LOCATION & BLOCK NOS STOREY NO WORKING LOAD
LIFTS

826 4 203 117 3

827 4 203 117 2

828 4 203 117 3

829 4 203 117 2

(D) TAMPINES STREET 21

C1 C2

258 4 203 117 3

259 11 377 137 3

259 4 203 117 1

260 11 377 137 3

261 10 352 134 4

262 10 352 134 4

(E) TAMPINES STREET 83/AVE 5

C1 C2

858A 4 203 117 1

858B 4 203 117 1

859 13 427 143 1

859A 13 427 143 1

860A 4 203 117 1

860B 4 203 117 1

861 13 427 143 1

861A 13 427 143 1

(F) EVERTON PARK BLK 7

C1 C2
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

NO OF
LOCATION & BLOCK NOS STOREY NO WORKING LOAD
LIFTS

7 12 402 140 2

(G) MARINE CRESCENT BLK 30-35

C1 C2

30 18 543 155 3

31 18 543 155 3

32 18 543 155 3

33 18 543 155 3

34 10 348 133 3

35 10 348 133 3

(H) UBI AVENUE 1

C1 C2

301&302 4 203 117 9

304 4 203 117 5

305 4 203 117 3

311 12 402 140 1

312 4 203 117 1

313 12 402 140 1

314 11 377 137 2

315 11 377 137 2

316 12 402 140 1

317 4 203 117 1

318 12 402 140 1

(I) TELOK BLANGAH CRESCENT

C1 C2
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

NO OF
LOCATION & BLOCK NOS STOREY NO WORKING LOAD
LIFTS

13 14 446 144 3

15 16 495 150 3

16 14 446 144 3

18 14 446 144 3

20 16 495 150 3

21 14 446 144 3

23 14 446 144 3

24 14 446 144 3
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

NO OF
LOCATION & BLOCK NOS STOREY NO WORKING LOAD
LIFTS

(A) TAMPINES STREET 41

C1 C2

401 12 516 140 1

402 4 243 117 2

403 12 516 140 2

404 4 243 117 3

405 12 516 140 2

406 12 516 140 3

407 12 516 140 2

(B) TAMPINES STREET 41 & 42

C1 C2

418 12 516 140 2

419 12 516 140 2

420 12 516 140 1

421 12 516 140 1

422 4 243 117 2

423 12 516 140 1

424 12 516 140 1

447 4 243 117 2

(C) TAMPINES STREET 81

C1 C2

821 4 243 117 2

822 4 243 117 2

824 4 243 117 3

825 4 243 117 2


SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

NO OF
LOCATION & BLOCK NOS STOREY NO WORKING LOAD
LIFTS

826 4 243 117 3

827 4 243 117 2

828 4 243 117 3

829 4 243 117 2

(D) TAMPINES STREET 21

C1 C2

258 4 243 117 3

259 11 482 137 3

259 4 243 117 1

260 11 482 137 3

261 10 448 134 4

262 10 448 134 4

(E) TAMPINES STREET 83/AVE 5

C1 C2

858A 4 243 117 1

858B 4 243 117 1

859 13 550 143 1

859A 13 550 143 1

860A 4 243 117 1

860B 4 243 117 1

861 13 550 143 1

861A 13 550 143 1

(F) EVERTON PARK BLK 7

C1 C2
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

NO OF
LOCATION & BLOCK NOS STOREY NO WORKING LOAD
LIFTS

7 12 516 140 2

(G) MARINE CRESCENT BLK 30-35

C1 C2

30 18 715 155 3

31 18 715 155 3

32 18 715 155 3

33 18 715 155 3

34 10 442 132 3

35 10 442 132 3

(H) UBI AVENUE 1

C1 C2

301&302 4 243 117 9

304 4 243 117 5

305 4 243 117 3

311 12 516 140 1

312 4 243 117 1

313 12 516 140 1

314 11 482 137 2

315 11 482 137 2

316 12 516 140 1

317 4 243 117 1

318 12 516 140 1

(I) TELOK BLANGAH CRESCENT

C1 C2
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

NO OF
LOCATION & BLOCK NOS STOREY NO WORKING LOAD
LIFTS

13 14 578 144 3

15 16 647 150 3

16 14 578 144 3

18 14 578 144 3

20 16 647 150 3

21 14 578 144 3

23 14 578 144 3

24 14 578 144 3
COL LOADING Case 1 (1.5m cantilever)
Column C1 18TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.59 7.61 KN

slab sw+fin 4.94 1.5 1.175 8.71 KN

LL 3 1.5 1.175 5.29 KN

23.60 KN

For 12 storey, 23.60 x 17 = 401.12 KN 401.12

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 1.5 1.175 8.28 KN

LL 4 1.5 1.175 7.05 KN

beam sw 24 0.08 2.775 5.33 KN

54.89 KN 54.89

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26

Total col ht 45.655


col sw 0.3 45.655 13.70 KN 13.70

TOTAL LOAD 543.39

COL LOADING Case 1 (1.5m cantilever)


Column C1 16TH STORY
Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.59 7.61 KN

slab sw+fin 4.94 1.5 1.175 8.71 KN

LL 3 1.5 1.175 5.29 KN

23.60 KN

For 12 storey, 23.60 x 15 = 353.93 KN 353.93

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 1.5 1.175 8.28 KN

LL 4 1.5 1.175 7.05 KN

beam sw 24 0.08 2.775 5.33 KN

54.89 KN 54.89

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26

Total col ht 40.475


col sw 0.3 40.475 12.14 KN 12.14

TOTAL LOAD 494.64

COL LOADING Case 1 (1.5m cantilever)


Column C1 14TH STORY
Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.59 7.61 KN

slab sw+fin 4.94 1.5 1.175 8.71 KN

LL 3 1.5 1.175 5.29 KN

23.60 KN

For 12 storey, 23.60 x 13 = 306.74 KN 306.74

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 1.5 1.175 8.28 KN

LL 4 1.5 1.175 7.05 KN

beam sw 24 0.08 2.775 5.33 KN

54.89 KN 54.89

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26

Total col ht 35.295


col sw 0.3 35.295 10.59 KN 10.59

TOTAL LOAD 445.90

COL LOADING Case 1 (1.5m cantilever)


Column C1 10TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN


DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.59 7.61 KN

slab sw+fin 4.94 1.5 1.175 8.71 KN

LL 3 1.5 1.175 5.29 KN

23.60 KN

For 12 storey, 23.60 x 9 = 212.36 KN 212.36

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 1.5 1.175 8.28 KN

LL 4 1.5 1.175 7.05 KN

beam sw 24 0.08 2.775 5.33 KN

54.89 KN 54.89

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26

Total col ht 24.935


col sw 0.3 24.935 7.48 KN 7.48

TOTAL LOAD 348.41


col loading Case 1 (1.5m cantilever)
Column C2 18TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

1.99 KN

For 12 store 1.99 x 17 = 33.88 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 45.655


col sw 0.3 45.655 13.70 KN

TOTAL LOAD

col loading Case 1 (1.5m cantilever)


Column C2 16TH STORY
Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

1.99 KN

For 12 store 1.99 x 15 = 29.89 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 40.475


col sw 0.3 40.475 12.14 KN

TOTAL LOAD

col loading Case 1 (1.5m cantilever)


Column C2 14TH STORY
Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

1.99 KN

For 12 store 1.99 x 13 = 25.91 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 35.295


col sw 0.3 35.295 10.59 KN

TOTAL LOAD

col loading Case 1 (1.5m cantilever)


Column C2 10TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN


DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

1.99 KN

For 12 store 1.99 x 9 = 17.94 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 24.935


col sw 0.3 24.935 7.48 KN

TOTAL LOAD
35.42

33.88

34.23

38.26

13.70

155.48
35.42

29.89

34.23

38.26

12.14

149.95
35.42

25.91

34.23

38.26

10.59

144.41
35.42

17.94

34.23

38.26

7.48

133.33
col loading Case 2 (2.5m cantilever)
Column C1 18TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.59 7.61 KN

slab sw+fin 4.94 2.5 1.175 14.51 KN

LL 3 2.5 1.175 8.81 KN

32.92 KN

For 12 storey, 32.92 x 17 = 559.72 KN 559.72

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 2.5 1.175 13.81 KN

LL 4 2.5 1.175 11.75 KN

beam sw 24 0.08 3.7 7.10 KN

66.89 KN 66.89

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26

Total col ht 47.525


col sw 0.3 47.525 14.26 KN 14.26

TOTAL LOAD 714.55

col loading Case 2 (2.5m cantilever)


Column C1 16TH STORY
Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.59 7.61 KN

slab sw+fin 4.94 2.5 1.175 14.51 KN

LL 3 2.5 1.175 8.81 KN

32.92 KN

For 12 storey, 32.92 x 15 = 493.87 KN 493.87

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 2.5 1.175 13.81 KN

LL 4 2.5 1.175 11.75 KN

beam sw 24 0.08 3.7 7.10 KN

66.89 KN 66.89

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26

Total col ht 42.125


col sw 0.3 42.125 12.64 KN 12.64

TOTAL LOAD 647.08

col loading Case 2 (2.5m cantilever)


Column C1 14TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN


DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.59 7.61 KN

slab sw+fin 4.94 2.5 1.175 14.51 KN

LL 3 2.5 1.175 8.81 KN

32.92 KN

For 12 storey, 32.92 x 13 = 428.02 KN 428.02

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 2.5 1.175 13.81 KN

LL 4 2.5 1.175 11.75 KN

beam sw 24 0.08 3.7 7.10 KN

66.89 KN 66.89

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26

Total col ht 36.725


col sw 0.3 36.725 11.02 KN 11.02

TOTAL LOAD 579.61

col loading Case 2 (2.5m cantilever)


Column C1 10TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN


s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.59 7.61 KN

slab sw+fin 4.94 2.5 1.175 14.51 KN

LL 3 2.5 1.175 8.81 KN

32.92 KN

For 12 storey, 32.92 x 9 = 296.32 KN 296.32

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 2.5 1.175 13.81 KN

LL 4 2.5 1.175 11.75 KN

beam sw 24 0.08 3.7 7.10 KN

66.89 KN 66.89

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26

Total col ht 25.925


col sw 0.3 25.925 7.78 KN 7.78

TOTAL LOAD 444.67


col loading Case 1 (2.5m cantilever)
Column C2 18TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

1.99 KN

For 12 storey, 1.99 x 17 = 33.88 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 45.655


col sw 0.3 45.655 13.70 KN

TOTAL LOAD 155.48 KN

col loading Case 1 (2.5m cantilever)


Column C2 16TH STORY
Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

1.99 KN

For 12 storey, 1.99 x 15 = 29.89 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 40.475


col sw 0.3 40.475 12.14 KN

TOTAL LOAD 149.95

col loading Case 1 (2.5m cantilever)


Column C2 14TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN


DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

1.99 KN

For 12 storey, 1.99 x 13 = 25.91 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 35.295


col sw 0.3 35.295 10.59 KN

TOTAL LOAD 144.41

col loading Case 1 (2.5m cantilever)


Column C2 10TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN


s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.59 0.91 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

1.99 KN

For 12 storey, 1.99 x 9 = 17.94 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 24.935


col sw 0.3 24.935 7.48 KN

TOTAL LOAD 133.33


SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

COL LOADING Case 1 (1.25m cantilever)

Column C1 12TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN


35.42 KN 35.42 KN

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.7 7.93 KN

slab sw+fin 4.94 1.25 1.175 7.26 KN

LL 3 1.25 1.175 4.41 KN

21.62 KN

For 12 storey, 21.62 x 11 = 237.87 KN 237.87 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 1.25 1.175 6.90 KN

LL 4 1.25 1.175 5.88 KN

beam sw 24 0.08 2.775 5.33 KN

52.34 KN 52.34 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26 KN

Total col ht 31.325

col sw 0.3 31.325 9.40 KN 9.40 KN


TOTAL LOAD 373.29 KN

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

COL LOADING Case 1 (1.25m cantilever)

Column C1 11TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42 KN

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.7 7.93 KN

slab sw+fin 4.94 1.25 1.175 7.26 KN

LL 3 1.25 1.175 4.41 KN

21.62 KN

For 12 storey, 21.62 x 10 = 216.25 KN 216.25 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 1.25 1.175 6.90 KN

LL 4 1.25 1.175 5.88 KN

beam sw 24 0.08 2.775 5.33 KN

52.34 KN 52.34 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26 KN

Total col ht 28.625

col sw 0.3 28.625 8.59 KN 8.59 KN


TOTAL LOAD 350.85 KN

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

COL LOADING Case 1 (1.25m cantilever)

Column C1 4TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42 KN

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.7 7.93 KN

slab sw+fin 4.94 1.25 1.175 7.26 KN

LL 3 1.25 1.175 4.41 KN

21.62 KN

For 12 storey, 21.62 x 3 = 64.87 KN 64.87 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 1.25 1.175 6.90 KN

LL 4 1.25 1.175 5.88 KN

beam sw 24 0.08 2.775 5.33 KN

52.34 KN 52.34 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26 KN

Total col ht 9.725


col sw 0.3 9.725 2.92 KN 2.92 KN

TOTAL LOAD 193.81 KN


SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

col loading Case 1 (1.25 m cantilever)


Column C2 12TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

2.03 KN

For 12 store 2.03 x 11 = 22.35 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 31.325


col sw 0.3 31.325 9.40 KN

TOTAL LOAD
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

col loading Case 1 (1.25 m cantilever)


Column C2 11TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

2.03 KN

For 12 store 2.03 x 10 = 20.32 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 28.625


col sw 0.3 28.625 8.59 KN

TOTAL LOAD
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

col loading Case 1 (1.25 m cantilever)


Column C2 4TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

2.03 KN

For 12 store 2.03 x 3 = 6.10 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 9.725


col sw 0.3 9.725 2.92 KN

TOTAL LOAD
35.42 KN

22.35 KN

34.23 KN

38.26 KN

9.40 KN

139.65 KN
35.42 KN

20.32 KN

34.23 KN

38.26 KN

8.59 KN

136.81 KN
35.42 KN

6.10 KN

34.23 KN

38.26 KN

2.92 KN

116.92 KN
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)


Column C1 12TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.7 7.93 KN

slab sw+fin 4.94 2.5 1.175 14.51 KN

LL 3 2.5 1.175 8.81 KN

33.29 KN

For 12 storey, 33.29 x 11 = 366.15 KN 366.15

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 2.5 1.175 13.81 KN

LL 4 2.5 1.175 11.75 KN

beam sw 24 0.08 3.7 7.10 KN

66.89 KN 66.89

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26

Total col ht 31.325


col sw 0.3 31.325 9.40 KN 9.40
TOTAL LOAD 516.12

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)


Column C1 11TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.7 7.93 KN

slab sw+fin 4.94 2.5 1.175 14.51 KN

LL 3 2.5 1.175 8.81 KN

33.29 KN

For 12 storey, 33.29 x 10 = 332.87 KN 332.87

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 2.5 1.175 13.81 KN

LL 4 2.5 1.175 11.75 KN

beam sw 24 0.08 3.7 7.10 KN

66.89 KN 66.89

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26
Total col ht 28.625
col sw 0.3 28.625 8.59 KN 8.59

TOTAL LOAD 482.02

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)


Column C1 4TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.7 7.93 KN

slab sw+fin 4.94 2.5 1.175 14.51 KN

LL 3 2.5 1.175 8.81 KN

33.29 KN

For 12 storey, 33.29 x 3 = 99.86 KN 99.86

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 2.5 1.175 13.81 KN

LL 4 2.5 1.175 11.75 KN

beam sw 24 0.08 3.7 7.10 KN

66.89 KN 66.89
Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26

Total col ht 9.725


col sw 0.3 9.725 2.92 KN 2.92

TOTAL LOAD 243.35


SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)

Column C2 12TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

KN 35.42 KN

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.75 1 0.83 KN

2.15 KN

For 12 storey, 2.15 x 11 = 23.67 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

KN RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

KN Total col ht 31.325


col sw 0.3 31.325 9.40 KN

TOTAL LOAD

KN

KN
KN

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)

Column C2 11TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

KN 35.42 KN

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.75 1 0.83 KN

2.15 KN

For 12 storey, 2.15 x 10 = 21.52 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

KN RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

KN Total col ht 28.625


col sw 0.3 28.625 8.59 KN

TOTAL LOAD

KN
KN

KN

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)

Column C2 4TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

KN 35.42 KN

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.75 1 0.83 KN

2.15 KN

For 12 storey, 2.15 x 3 = 6.46 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

KN RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

KN Total col ht 9.725


col sw 0.3 9.725 2.92 KN
TOTAL LOAD

KN

KN

KN
35.42 KN

23.67 KN

34.23 KN

38.26 KN

9.40

140.97 KN
35.42 KN

21.52 KN

34.23 KN

38.26 KN

8.59

138.01 KN
35.42 KN

6.46 KN

34.23 KN

38.26 KN

2.92
117.28 KN
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

COL LOADING Case 1 (1.25m cantilever)

Column C1 12TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN


35.42 KN 35.42 KN

Typical cladding 0.3 1.175 2.9 1.02 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.9 8.52 KN

slab sw+fin 4.94 1.25 1.175 7.26 KN

LL 3 1.25 1.175 4.41 KN

22.28 KN

For 12 storey, 22.28 x 11 = 245.11 KN 245.11 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 1.25 1.175 6.90 KN

LL 4 1.25 1.175 5.88 KN

beam sw 24 0.08 2.775 5.33 KN

52.34 KN 52.34 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26 KN

Total col ht 33.525

col sw 0.3 33.525 10.06 KN 10.06 KN


TOTAL LOAD 381.18 KN
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

col loading Case 1 (1.25 m cantilever)


Column C2 12TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.9 1.02 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

2.10 KN

For 12 store 2.10 x 11 = 23.12 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 33.525


col sw 0.3 33.525 10.06 KN

TOTAL LOAD
35.42 KN

23.12 KN

34.23 KN

38.26 KN

10.06 KN

141.09 KN
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)


Column C1 12TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.9 1.02 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.9 8.52 KN

slab sw+fin 4.94 2.5 1.175 14.51 KN

LL 3 2.5 1.175 8.81 KN

33.94 KN

For 12 storey, 33.94 x 11 = 373.39 KN 373.39

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 2.5 1.175 13.81 KN

LL 4 2.5 1.175 11.75 KN

beam sw 24 0.08 3.7 7.10 KN

66.89 KN 66.89

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26

Total col ht 33.525


col sw 0.3 33.525 10.06 KN 10.06
TOTAL LOAD 524.02

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)


Column C1 11TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.7 7.93 KN

slab sw+fin 4.94 2.5 1.175 14.51 KN

LL 3 2.5 1.175 8.81 KN

33.29 KN

For 12 storey, 33.29 x 10 = 332.87 KN 332.87

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 2.5 1.175 13.81 KN

LL 4 2.5 1.175 11.75 KN

beam sw 24 0.08 3.7 7.10 KN

66.89 KN 66.89

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26
Total col ht 28.625
col sw 0.3 28.625 8.59 KN 8.59

TOTAL LOAD 482.02

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)


Column C1 4TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.7 7.93 KN

slab sw+fin 4.94 2.5 1.175 14.51 KN

LL 3 2.5 1.175 8.81 KN

33.29 KN

For 12 storey, 33.29 x 3 = 99.86 KN 99.86

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 2.5 1.175 13.81 KN

LL 4 2.5 1.175 11.75 KN

beam sw 24 0.08 3.7 7.10 KN

66.89 KN 66.89
Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26

Total col ht 9.725


col sw 0.3 9.725 2.92 KN 2.92

TOTAL LOAD 243.35


SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)

Column C2 12TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

KN 35.42 KN

Typical cladding 0.3 1.175 2.9 1.02 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.75 1 0.83 KN

2.22 KN

For 12 storey, 2.22 x 11 = 24.44 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

KN RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

KN Total col ht 33.525


col sw 0.3 33.525 10.06 KN

TOTAL LOAD

KN

KN
KN

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)

Column C2 11TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

KN 35.42 KN

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.75 1 0.83 KN

2.15 KN

For 12 storey, 2.15 x 10 = 21.52 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

KN RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

KN Total col ht 28.625


col sw 0.3 28.625 8.59 KN

TOTAL LOAD

KN
KN

KN

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)

Column C2 4TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

KN 35.42 KN

Typical cladding 0.3 1.175 2.7 0.95 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.75 1 0.83 KN

2.15 KN

For 12 storey, 2.15 x 3 = 6.46 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

KN RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

KN Total col ht 9.725


col sw 0.3 9.725 2.92 KN
TOTAL LOAD

KN

KN

KN
35.42 KN

24.44 KN

34.23 KN

38.26 KN

10.06

142.41 KN
35.42 KN

21.52 KN

34.23 KN

38.26 KN

8.59

138.01 KN
35.42 KN

6.46 KN

34.23 KN

38.26 KN

2.92
117.28 KN
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

COL LOADING Case 1 (1.25m cantilever)

Column C1 10TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN


35.42 KN 35.42 KN

Typical cladding 0.3 1.175 2.8 0.99 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.8 8.23 KN

slab sw+fin 4.94 1.25 1.175 7.26 KN

LL 3 1.25 1.175 4.41 KN

21.95 KN

For 12 storey, 21.95 x 9 = 197.58 KN 197.58 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 1.25 1.175 6.90 KN

LL 4 1.25 1.175 5.88 KN

beam sw 24 0.08 2.775 5.33 KN

52.34 KN 52.34 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26 KN

Total col ht 26.825

col sw 0.3 26.825 8.05 KN 8.05 KN


TOTAL LOAD 331.65 KN

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

COL LOADING Case 1 (1.25m cantilever)

Column C1 11TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42 KN

Typical cladding 0.3 1.175 2.8 0.99 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.8 8.23 KN

slab sw+fin 4.94 1.25 1.175 7.26 KN

LL 3 1.25 1.175 4.41 KN

21.95 KN

For 12 storey, 21.95 x 10 = 219.54 KN 219.54 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 1.25 1.175 6.90 KN

LL 4 1.25 1.175 5.88 KN

beam sw 24 0.08 2.775 5.33 KN

52.34 KN 52.34 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26 KN

Total col ht 29.625

col sw 0.3 29.625 8.89 KN 8.89 KN


TOTAL LOAD 354.44 KN

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

COL LOADING Case 1 (1.25m cantilever)

Column C1 4TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42 KN

Typical cladding 0.3 1.175 2.8 0.99 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.8 8.23 KN

slab sw+fin 4.94 1.25 1.175 7.26 KN

LL 3 1.25 1.175 4.41 KN

21.95 KN

For 12 storey, 21.95 x 3 = 65.86 KN 65.86 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 1.25 1.175 6.90 KN

LL 4 1.25 1.175 5.88 KN

beam sw 24 0.08 2.775 5.33 KN

52.34 KN 52.34 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26 KN

Total col ht 10.025


col sw 0.3 10.025 3.01 KN 3.01 KN

TOTAL LOAD 194.88 KN


SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

col loading Case 1 (1.25 m cantilever)


Column C2 10TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.8 0.99 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

2.07 KN

For 12 store 2.07 x 9 = 18.60 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 26.825


col sw 0.3 26.825 8.05 KN

TOTAL LOAD
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

col loading Case 1 (1.25 m cantilever)


Column C2 11TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.8 0.99 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

2.07 KN

For 12 store 2.07 x 10 = 20.67 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 29.625


col sw 0.3 29.625 8.89 KN

TOTAL LOAD
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 1

col loading Case 1 (1.25 m cantilever)


Column C2 4TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN

Typical cladding 0.3 1.175 2.8 0.99 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

2.07 KN

For 12 store 2.07 x 3 = 6.20 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

Total col ht 10.025


col sw 0.3 10.025 3.01 KN

TOTAL LOAD
35.42 KN

18.60 KN

34.23 KN

38.26 KN

8.05 KN

134.56 KN
35.42 KN

20.67 KN

34.23 KN

38.26 KN

8.89 KN

137.47 KN
35.42 KN

6.20 KN

34.23 KN

38.26 KN

3.01 KN

117.12 KN
SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)


Column C1 10TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.8 0.99 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.8 8.23 KN

slab sw+fin 4.94 2.5 1.175 14.51 KN

LL 3 2.5 1.175 8.81 KN

33.62 KN

For 12 storey, 33.62 x 9 = 302.54 KN 302.54

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 2.5 1.175 13.81 KN

LL 4 2.5 1.175 11.75 KN

beam sw 24 0.08 3.7 7.10 KN

66.89 KN 66.89

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26

Total col ht 26.825


col sw 0.3 26.825 8.05 KN 8.05
TOTAL LOAD 451.16

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)


Column C1 11TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.8 0.99 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.8 8.23 KN

slab sw+fin 4.94 2.5 1.175 14.51 KN

LL 3 2.5 1.175 8.81 KN

33.62 KN

For 12 storey, 33.62 x 10 = 336.16 KN 336.16

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 2.5 1.175 13.81 KN

LL 4 2.5 1.175 11.75 KN

beam sw 24 0.08 3.7 7.10 KN

66.89 KN 66.89

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26
Total col ht 29.625
col sw 0.3 29.625 8.89 KN 8.89

TOTAL LOAD 485.61

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)


Column C1 4TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

35.42 KN 35.42

Typical cladding 0.3 1.175 2.8 0.99 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.35 1 0.71 KN

light wt blk wall 2.5 1.175 2.8 8.23 KN

slab sw+fin 4.94 2.5 1.175 14.51 KN

LL 3 2.5 1.175 8.81 KN

33.62 KN

For 12 storey, 33.62 x 3 = 100.85 KN 100.85

1st storey cladding 0.3 1.175 1.625 0.57 KN

RC wall 6 2.55 2.2 33.66 KN

lobby slab sw+fin 4.7 2.5 1.175 13.81 KN

LL 4 2.5 1.175 11.75 KN

beam sw 24 0.08 3.7 7.10 KN

66.89 KN 66.89
Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN 38.26

Total col ht 10.025


col sw 0.3 10.025 3.01 KN 3.01

TOTAL LOAD 244.42


SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)

Column C2 10TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

KN 35.42 KN

Typical cladding 0.3 1.175 2.8 0.99 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.75 1 0.83 KN

2.19 KN

For 12 storey, 2.19 x 9 = 19.68 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

KN RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

KN Total col ht 26.825


col sw 0.3 26.825 8.05 KN

TOTAL LOAD

KN

KN
KN

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)

Column C2 11TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

KN 35.42 KN

Typical cladding 0.3 1.175 2.8 0.99 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.75 1 0.83 KN

2.19 KN

For 12 storey, 2.19 x 10 = 21.87 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

KN RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

KN Total col ht 29.625


col sw 0.3 29.625 8.89 KN

TOTAL LOAD

KN
KN

KN

SCE CONSULTANTS (PTE.) LTD.

JOB NO DB

PROJECT HDB LIFT UPGRADING

SUBTITLE CASE 2

col loading Case 2 (2.5m cantilever)

Column C2 4TH STORY

Roof lift wt 7.5 1.875 1.175 16.52 KN

DL 6.5 1.875 1.175 14.32 KN

LL 1.5 1.875 1.175 3.30 KN

s- beam sw 0.3 4.23 1 1.27 KN

KN 35.42 KN

Typical cladding 0.3 1.175 2.8 0.99 KN

canopy 0.5 1.5 0.5 0.38 KN

s-beam sw 0.3 2.75 1 0.83 KN

2.19 KN

For 12 storey, 2.19 x 3 = 6.56 KN

1st storey cladding 0.3 1.175 1.625 0.57 KN

KN RC wall 6 2.55 2.2 33.66 KN

34.23 KN

Lift pit slab sw+fin 8.4 1.275 1.275 13.66 KN

RC wall 4.8 2.55 2.01 24.60 KN

38.26 KN

KN Total col ht 10.025


col sw 0.3 10.025 3.01 KN
TOTAL LOAD

KN

KN

KN
35.42 KN

19.68 KN

34.23 KN

38.26 KN

8.05

135.64 KN
35.42 KN

21.87 KN

34.23 KN

38.26 KN

8.89

138.67 KN
35.42 KN

6.56 KN

34.23 KN

38.26 KN

3.01
117.48 KN

You might also like