Once the design has been completed, there are four basic methods for implementing
the MIS. They are as follow:
a. This method is also referred as” phasing in” the new system.
b. Small parts or subsystems are substituted for the old.
c. In the case of upgrading old systems, this may be a very desirable method.
4. Operate in parallel and cut over.
a. The new system is installed and operated in parallel with the current system
until it has been checked out, then only the current system is cut out.
b. This method is expensive because of personal and related costs.
c. Its big advantages are that the system is fairly well debugged when it becomes
the essential information system.
Plan the Implementation
There are three main phases in implementation that take place in series. They are as
follows:
1. Initial installation
Training of personnel and preparation of software may be in parallel with each other and
with other implementation activities.
The first step in the implementation procedure is to plan the implementation. Some analyst
includes the planning of the implementation with the design of the system, the planning and
the action to implement the plan should be bound closely together.
Planning is the first step of management, not the last. The MIS design and the urgent need
for the system at the time the design is completed will weigh heavily on the plan for
implementation.
IMPLEMENTATION TASKS:
Establish Relationships among tasks: For small projects, the order of performance may simply be
described in text form. A Gantt chart or network diagram makes visualization of the plan and
schedule much clearer.
UNIT – V – IMPLEMENTATION, EVALUATION & MAINTENANCE OF MIS 2014
For large projects, many concurrent and sequential activities are interrelated so that a network
diagram must be employed in any good plan.
Establish a Schedule: Schedule is prepared by having the system designer’s estimate the times
between the events in the program network. The critical path (longest time through the network)
can be calculated. After specifying the starting date, the end date is established.
Cost Schedule to Tasks and Time: The cost for completing each task required to complete is
established as part of the plan; then the rate of expenditures should be budgeted.
Reporting and control of the work in progress may be obtained by weekly meetings. The financial
personnel must make certain that report formats allow them to show cost and technical progress
relationship as well as cost and time.
For the installation of a new system to replace a current one may require a major revision of
facilities as well as completely new office, computer room etc.
The MIS project manager must prepare rough layouts and estimates of particular floor areas that
feel to be needed. The manager then prepares cost estimates.
Space planning must be done by the space to be occupied by people, the space occupied by
equipment and the movement of people and equipment in the work progress. A large investment in
good working conditions will repay its cost many times.
As the implementation tasks have been defined, management usually assigns a project manager to
guide the implementation.
The purpose of the MIS is to increase the amount and quality of their contributions, the system is
their system.
Top management must make the middle managers for their involvement in implementation, besides
these, systems specialists, computer programmer; top management should make sure that each
people who will operate the system should have active parts in the implementation.
After organizing the personnel for implementation the next task is to develop or prepare the
procedures for implementation. As the project leader has the network plan for proceeding with the
implementation, this leader calls the key people in the project to prepare more detailed procedures
for system installation.
Procedures for evaluating and selecting hardware must be spelled out. Procedures for phasing in
parts of the MIS or operating the MIS in parallel must be developed.
UNIT – V – IMPLEMENTATION, EVALUATION & MAINTENANCE OF MIS 2014
The major part of implementing the MIS is the testing of each segment of total system as it is
installed.
A program is developed keeping in mind to impress management and support. After developing the
program, it is necessary to train operating personnel in their new duties. They must have a thorough
understanding of what the new MIS is like and what it is supposed to do. They must learn how it will
operate. They are faced with many changes in their work and have to obtain acceptance of changes.
As there are various levels of personnel and these people will be working with only a small part of
the MIS, the seminars should be designed to provide them with an understanding of the complete
system.
As the software is developed internally or under contract, in both cases, the software development
must take in mind the nature of the hardware required.
As the system designers and programmers provide the flow diagrams and the block diagrams during
the detailed design state. Some modification may be required, as the implementation stage
progresses.
This acquisition is usually the limiting factor in getting am MIS implementation. These tasks should
be started during the design stage.
The decision is to be needed, whether to buy or lease the hardware. Capital expenditure analysis is
only one of many factors involved in this decision. Others are prestige, usage etc.
8. Generating files
In the implementation stage, the actual data must be obtained and recorded for the initial testing
and operation of the system. This requires format of the data, storage form and format and remarks
to indicate when the data have been stored.
The collection of data used in routine operations is often called the master file.
Responsibility for file maintenance for each file item should also be assigned. The development of
files or databases belongs to information system designers and storage and retrieval experts.
The translation of specifications for files into computer programs is a function of computer
specialists.
9. Designing forms
UNIT – V – IMPLEMENTATION, EVALUATION & MAINTENANCE OF MIS 2014
For controlling the marketing, a salesperson has to fill out the forms summarizing the day’s
activities. The form ensures the right information to be supplied for computer storage.
Forms are required not just for input and output but also for transmitting data at intermediate
stages.
As the total system is installed, tests should be performed with the test specifications and
procedure. A test during installation stage consists of component tests, subsystem tests and total
system acceptance tests.
Components may be equipment (that can be new or old), new software programs, new data
collection methods, work procedures, reporting formats. Difficulties that occur during component
tests may lead t design changes.
As more components are installed, subsystems may be tested. There is a difference between the
testing of component and the testing of a system.
System tests require verification of multiple inputs, complex logic systems, and timing aspects of
many parts.
Cutover is a point at which the new component replaces the old component to the new system
replaces the old system. This involves old forms, old files and old equipment being retried.
The debugging proves associated with the cutover to the new system may extend for several
months.
Documentation of the MIS means preparation of written descriptions of the scope, purpose,
information flow components, and operating procedures of the system.
After the MIS has been operating smoothly for a short period of time, an evaluation of each step in
the design and of the final system performance should be made.
Evaluation should not be delayed beyond the time when the system’s analysts have completed most
of the debugging. The longer the delay, the more difficult it will be for designer to remember
important details.
UNIT – V – IMPLEMENTATION, EVALUATION & MAINTENANCE OF MIS 2014
Control and maintenance of the system are the responsibilities of the line managers.
Control of the systems means the operation of the system as it was designed to operate.
Sometimes, well-intentioned people or operators may make unauthorized changes to improve the
system, changes that are not approved or documented.
Maintenance is closely related to control. Maintenance is that ongoing activity that keeps the MIS at
the highest levels of effectiveness and efficiency within cost constraints.
Maintenance is directed towards reducing errors due to design, reducing errors due to
environmental changes and improving the system’s scope and services.
Traditional MIS were manual processes handled by certain employees inside the
company.
Modern technology and business software has allowed companies to automate their
traditional MIS processes.
While automating the MIS can provide several obvious benefits, there are disadvantages to
automating or enhancing the company MIS like additional implementation costs,
employee training or new MIS-gathering tools and techniques may provide some difficult
situations.
Some of the pitfalls in MIS with brief description will be given as follows:
Cost of Technology Upgrades: Implementing a new MIS or new MIS procedures can prove
to be a difficult process for older computer mainframe systems or business software
applications.
Because modern technology can change rapidly in a short amount of time, companies must
maintain current hardware and software systems in their company.
Training Needs: Training managers and employees on a new MIS may be a process that
takes a lot of time and effort.
Companies may not be prepared to train their managers and employees on such a large
scale business system.
Additionally, older employees may take longer to train since they are usually less familiar
with current business technology.
The company size and number of departments needing the new MIS may also create
training difficulties for the company.
Companies may need to shut down operations during the training period, creating a
potential for lost profits.
MIS as Distraction: MIS processes may provide little benefit as a management tool if they
are allowed to get out of hand.
This may happen if companies spend more time designing, implementing, reviewing and
controlling the MIS.
It may also be a distraction when companies attempt to expand their current operations.
Misconceptions: Companies may not need a completely new MIS process or renovation.
Simple tweaks may be sufficient to ensure the current MIS operates smoothly.
Business software packages can quickly become overpriced when new hardware and
maintenance agreements are included.
This expense may be avoided if company management simply review their current MIS
processes and determine where any flaws or errors exist. Correcting these issues may
breathe new life into the current MIS.
Too Much Information: MIS processes are designed to gather and collect pertinent
information for business decisions.
Creating an MIS that collects too much information can lead to the management problem
known as the “paralysis of analysis.”
This management theory is based on the principles of so much information is gathered that
it leads to the inability of making a decision.
UNIT – V – IMPLEMENTATION, EVALUATION & MAINTENANCE OF MIS 2014
Management information must be timely, relevant and accurate. Information that does not
meet these guidelines may not be necessary for making business decisions.
A common type of systems modeling is function modeling, with specific techniques such as
the Functional Flow Block Diagram and other techniques, which can be extended using
functional decomposition, and can be linked to requirements models for further systems
partition.
The Business Process Modeling Notation (BPMN), a graphical representation for specifying
business processes in a workflow, can also be considered to be a systems modeling
language.
In business and IT development the term "systems modeling" has multiple meaning. It can
relate to:
As a field of study systems modeling has emerged with the development of system theory
and systems sciences.
As a type of modeling, a system modeling is based on systems thinking and the systems
approach. In business and IT systems modeling contrasts other approaches such as:
Systems engineering ensures that all likely aspects of a project or system are considered,
and integrated into a whole.
The systems engineering process: Depending on their application, tools are used for various
stages of the systems engineering process:
Using models: Models play important and diverse roles in systems engineering. A model
can be defined in several ways, including:
1) An abstraction of reality designed to answer specific questions about the real world
The aim of education in systems engineering is to simply formalize the approach and in
doing so, identify new methods and research opportunities similar to the way it occurs in
other fields of engineering. As an approach, systems engineering is holistic and
interdisciplinary in flavor.
Systems engineering encourages the use of tools and methods to better comprehend and
manage complexity in systems. Some examples of these tools can be seen here:
Defining and characterizing such systems and subsystems and the interactions among them
is one of the goals of systems engineering. In doing so, the gap that exists between informal
requirements from users, operators, marketing organizations, and technical specifications is
successfully bridged.
Systems engineering tools are strategies, procedures, and techniques that aid in performing
systems engineering on a project or product. The purpose of these tools vary from database
management, graphical browsing, simulation, and reasoning, to document production,
neutral import/export and more.