Inspection Report: Vaccum Test Record
Inspection Report: Vaccum Test Record
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
Client : Date :
Project : Location :
Description : Report No :
Sketch :
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
Client : Date :
Project : Location :
Description : Report No :
Sketch :
4
C
B D
3
A E
2 High of tank
H
F
G 1
MEASUREMENT ACTUAL
PLAN REMARK
POINT 1 2 3 4
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
Client : Date :
Project : Location :
Description : Report No :
Sketch :
Course 6
Course 5
Course 4
Height of water
Course 3
Course 2
Course 1
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
Client : Date :
Project : Location :
Description : Report No :
Sketch :
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
DISTORSION WELDING
Dimension
Description Area of distortion Remark
Out (mm) In (mm)
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
Client : Date :
Project : Location :
Description : Report No :
Sketch :
1. ROUNDNESS
C G Measurement
Diameter Actual (cm) Remarks
Point
A-B C-D E-F G-H
Top/end (cm) (cm) (cm) (cm)
A B Middle
Bottom
H D
2. ORIENTATION NOZZLE
Position
Description Symbol Remark
Plan Actual Plan Actual Plan Actual
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
THICKNESS RECORD
Client : Date :
Project : Location :
Description : Report No :
Sketch :
#A #B
#E # F
#D #C THICKNESS :
REQ’D : PLATE
EQUIPMENT USED : UT FLOW DETECTOR
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
Client : Date :
Project : Location :
Description : Report No :
Sketch :
R3
R2 R4
R5
R1
R6
THICKNESS :
TOLERANCE : REQ’D : SHELL PLATE
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
Client : Date :
Project : Location :
Description : Report No :
Sketch :
900 COURSE 6
450
1350 COURSE 5
COURSE 4
00 1800
COURSE 3
COURSE 2
3200 2250
COURSE 1
2700
DEVIATION
NO COURSE & PLATE NUMBER ORIENT REMARK
PREWELD POSTWELD
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
Client : Date :
Project : Location :
Description : Report No :
Sketch :
00
V1
V2 V3
V4 V5 V6
2700 90 0
V7 V8
V9 V10 V11
V12 V13
V 14
1800
NOTE :
V = NORTH DIRECTION
H = WEST DIRECTION
Checked by Approved by
Prepared by
________________ ___________________
___________________
___ DATE :
DATE :
DATE :
FORM TANK - 012
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
INSPECTION TYPE : PROJECT NO. : ____________________________
REPORT NO. : ____________________________
RADIOGRAPHY SPOT
LOCATION : ____________________________
(NDT MAP)
DATE : ____________________________
Sketch
S-R
N H5
V7
H4
H2
V6
H3
H2 .
T1
H1 V5 H1 .
V1 V2 V3 V4 B-S .
Reference point for horizontal RT : Manhole 0
POSITION INSPECTION
NO NUMBER OF SPOT WELDER STEMP
WELDING RT RT 1 RT 2
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
Client : Date :
Project : Location :
Description : Report No :
V1
V3 V5
H5 H2 H1 H4
V4 V6
V2
NOTE :
V = VERTICAL DIRECTION WELDING
H = HORIZONTAL DIRECTION WELDING
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
Client : Date :
Project : Location :
Description : Report No :
Sketch
S-R .
COURSE 6 V6A V6B V6C V6D V6E
H5 .
COURSE 5 V5A V5B V5C V5D V5E
H4 .
COURSE 4
V4A V4B V4C V4D V4E
H3 .
COURSE 3 VAVV
V3A V3B V3C V3D V4E
H2 .
H1 .
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
WELDING REPORT
Client : Date :
Project : Location :
Description : Report No :
PLATE WELDER WELD VISUAL INSPECTION
NO HEAT NUMBER
NUMBER STAMP AREA CONTOUR DEFECT RESULT
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
NOTE :
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia
Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
NON-CONFORMANCE REPORT
Client : Date :
Project : Location :
Description Report No :
CONT/ SUB CONT/ VENDOR CATEGORY
NCR HOLD TAG
ITEM DESCRIPTION
INITIATED BY REVIEWED BY
DESCRIPTION OF THE NON CONFORMANCE
(Included a description of the requirement that was not met)
CORRECTION ACTION BY :
DIPOSITION
(attachment)
Est CORRECTION COMMENCE DATE :
COMPANY COMMENT :
DATE :
PROJ. ENG. : DATE :
CALTEX___
INSPECTION REPORT
PT. Caltex Pacific Indonesia Construction of Sand Plant and Sand Pan Facilities
CGS-5 (Package 1) in DSF Duri PT. META EPSI Engineering
NON-CONFORMANCE REPORT LOG
PROCEDURE
1. SCOPE
This procedure describe the method and responsibilities for controlling nonconforming item to prevent
their in advertent use or installation .
This procedure provides for identification, document, evaluation, disposition, notification, segregation,
and inspection of these nonconforming items.
2. DEFINITION
The following word shall have the meaning indicated when used here in :
COMPANY PT. Caltex Pacific Indonesia, as the ultimate user and owner
MIGAS Indonesia Government Body responsible for issuing approval and licenses for Oil and gas facilities
THIRD PARTY Third party Inspection Company approval and appointed to act on behalf of MIGAS
CONTRACTOR Engineering, procurement and construction CONTRACTOR selected by CPI to perform the detailed
design, procurement and construction of project
VENDOR Supplier, fabricator and /or original equipment manufacture awarded a purchase order by the
CONTRACTOR and/ or CPI furnish materials or equipment.
CMT Construction Management Team , a CPI construction Group.
3. PURPOSE
In order to bring to everyone’s attention, item which deviated or are outside of project requirements as defined in
whole therein. This control procedure for nonconforming items deals with the treatment and corrective action, to prevent
misuse and any reoccurrence of the same type of non conforming item whether it is during design, manufacturing,
fabrication or construction execution.
4. CONTROL
4.1 . When any deviation from project requirement is defected, it shall be immediately notified by means of a report
to the appropriated department responsible for the activity or supply of the non conforming item, Where
requirement the item shall be put on hold and identification by means of product marking or affixing a hold tag
to preclude inadvertent use or installation.
4.2. Non conforming item shall be judge and categorized into what is deemed as being minor and major non
conforming.
4.3. The following examples of non conformance shall be defined as being MAJOR :
- Where the non conformance deviates from statutory regulations
- Where it causes major design changes, including cases of “ Use – As – Is” basis
- When the inspection item and or activity is not in accordance with the project international codes
and / or Standard
- When there a failure to comply with the requirements of the project approval test and inspection
plan, when the activity and or item is categories as being a HOLD point, but not treated as such.
- Where the non conformance item can not be easily rectified without returning the item to original
place of manufacturer, or where corrective measure have to be performance by supplier or suppliers
representative at the job site in order to bring thr item back into compliance.
- Safety violations which endanger life and are hazardous to the local community. Marine and or wild
life, with particular reference to wild animal migration activities for the onshore portion of the
project.
4.4. In general MINOR non-conformance shall be defined as those item which can easily be rectified at site.
Typical Minor non conformance are as describe below:
- normal construction field engineering changes based on construction ability, equivalent material
substitution, minor piping route changes, etc
- Mis-Interpretation of drawing resulting in corrected fabrication or installation, which can easily be
rectified.
- Deviation from the project specification, but where the end result is still acceptable .
- Failure to followed exactly as specified the installation procedure provided by engineering or
VENDOR recommendation, were the final result however does not have an overall adverse effect to
the operational usage of equipment and / or component part etc, and does not invalidate
manufacturing warranties.
Where conflicts occur as to whether an item is of a MAJOR or MINOR non conformance, the final decision in all cases
shall be made by the clients project Chief Engineer.
8.1 Evaluated the proposal disposition, modify if necessary, or enter the disposition.
8.2 If the non conformance condition will not be corrected in full conformance with the applicable
specification, obtain the company Chief Engineer to approval .
8.3 If the non conformance condition will not be corrected in full conformance with the applicable
specification , obtain the Company representative to comment approval.
9.0 SITE MANAGER
Upon received of the approval NCR disposition, perform the applicable construction action specification in the NCR
disposition. Perform the applicable construction action specified in the NCR disposition . Sign the off for completion of
disposition on the copy and forward it to the Quality control Manager to serve as notification of readiness for close
inspection.
10.1 Upon verification of satisfactory completion of the disposition, sign and date
10.2 Sand the verified and completed action NCR to company representative to close out.
11.0 ATTACHMENT