0% found this document useful (0 votes)
518 views5 pages

QC Engineer (Mechanical) - 2

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 5

DENNISH MASILAMANI

MOBILE:+919791560460, EMAIL: dennish9243@gmail.com, SKYPE ID: m.dennish

PROFILE SUMMARY:

10 years of experience in the field of Quality control in Welding /


Piping/Fabrication / Erection/Industrial construction & Boiler

Pressure parts as a QA/QC Engineer in India and Abroad.

OBJECTIVE:
Seeking a professional position as Quality and Technical
Representative in the field of Structural steel, Pressure parts where I can effectively utilize my
technical skills and experience.

EDUCATIONAL QUALIFICATIONS:
• DIPLOMA IN MECHANICAL ENGINEERING and I got 79% FIRST CLASS WITH HONOURS
• ASNT LEVEL II (RT, UT, MPT, DPT)
• AUTO CAD (2008)

CARRIER SUMMARY:

CURRENT WORKING COMPANY IN INDIA:

Name of Company: LARSEN AND TOUBRO LIMITED (L&T).

Designation: Sr. QA/QC Engineer

Duration: From January 2018 to February 2019 / 1 Year

Project Client: WRD (Madhya Pradesh, India)

Nature of Project: Kundalia Irrigation Project Left-Bank

PREVIOUS COMPANY IN INDIA:

Name of Company: VEESONS ENERGY SYSTEMS PVT.LTD, Tiruchirappalli, India

Designation: QC Engineer

Duration: from July 2007 to February 2011 / 4 .5 years

Project Client: Bharat Heavy Electrical Limited –Trichy.

Nature of Project: Boiler Pressure Parts


PREVIOUS COMPANY IN ABRODS:

Name of Company: EVERSENDAI ENGINEERING W.L.L, QATAR.

Designation: Jr.QA/QC Engineer

Duration: From May 2011 to April 2014 / 2.10 years

Name of Company: EVERSENDAI ENGINEERING L.L.C, DUBAI.

Designation: QA/QC Engineer

Duration: From December 2014 to August 2017 / 2.7years

PREVIOUS PROJECT IN ABROAD:

• PROJECT:New Doha International airport (NDIA), QATAR


CLIENT : Sky Orxy Joint Venture (SOJV) & Overseas Bechtel Inc. (OBI)
• PROJECT: Nakilat Ship Yard, QATAR
CLIENT : Royal Haskoning (RH) & Qatar Petroleum (QP)
• PROJECT: Doha Conventional Center (DCC)
CLIENT : Six Construct Midmac Joint Venture (SMJV)
• PROJECT: Qatar Foundation Quarters (QFHQ)
CLIENT : ASTAD & Qatar Petroleum
• PROJECT: Qatar National Museum (QNM)
CLIENT : ASTAD & Hill International.
• PROJECT: Qatar Foundation-Islamic study center
CLIENT : ASTAD & Hill International.
• PROJECT: The Address Residence Sky view Dubai
CLIENT : EMMAR Properties P.J.S.C.
• PROJECT: Opera House Down Town Dubai
CLIENT : EMMAR Properties P.J.S.C.

At Structural Steel QA/QC Department From the above mentioned company, I have attained good
knowledge in Supervisions. I have attained great experience in the Field of fabrication of heavy
structural steels, pipe racks & structural fabrication and erection.

DUTIES & RESPONSIBILITIES:

FITUP & WELDING:

✓WPS/PQR preparation / establish /approve as per the applicable code.


✓ Ensure welder are qualified as per the applicable code, a register is maintained to monitor their
Performance.

✓Verifying the engaging qualified NDT Personnel as per the SNT –TC-1A or PCN and qualification
are Ensuring validation.

✓Conduct training program for welders and welding operators as per applicable code and are
currently valid (ASME IX, AWS D1.1).

✓Verifying Renewal/Re-test process of welders.

✓Ensure the welding machines are Calibrated.

✓Ensure electrodes/filler wires and other consumable are as per WPS.

✓Ensure that the welding consumables are handled as per approved procedure.

✓Various NDT procedures are prepared / verified and approved as per applicable code.

✓PWHT, Hydro-test, leak test, procedures reviewed and approval.

✓Witness pre-weld inspection activities like cutting, beveling, edge preparation and fit-up etc.…

Pre-heating if any,

✓Root welding visual inspection, NDE if required.

✓Checking of inter pass temperatures & recording the parameters as per WPS.

✓Final welding visual inspection, NDE if required.

✓Welding inspection. (Surveillance checks before during the after welding)

✓Monitor PWHT operation, review charts and reports.

✓Ensure hardness after PWHT to confirm the adequacy of PWHT and RT & MT if specified.

PAINTING:

✓Review of all Paints & Coating Specification, Manufacture’s data sheets, Painting Crew personnel
Approval, Equipment calibration Certificate, Safety Standards and other Painting / coating related
documents.

✓Assess the condition of the substrate prior to start blast cleaning and painting activities.

✓Monitoring blast cleaning activities to comply with the relevant Standard.

✓Ensure the surface cleanliness and amplitude prior to coating application.

✓Witness and inspect each coat of paint application.

✓Measure WFT/DFT requirement as per the relevant standard and specification.

✓Examine Coating Defects and suggests the remedial action.


✓Monitoring Pipe Stringing activities for proper handling to prevent handling damages.

✓Monitoring loading and offloading of shop coated pipes/fittings to prevent handling damages.

✓Monitoring, witnessing and inspection to the client inspector.

✓Raise RFI for Final Inspection to the client inspector.

✓Prepare daily report and document for future reference and hand over to the client upon the
completion of the Project.

✓Conduct the Qualification Test for Blaster and Paint Applicator in co-ordination with Client
Inspection.

PIPING:

✓ Reviewing the approved quality plans, manuals and scope of work to perform the required
inspection.

✓ Ensure dimension stability to AFC drawing, Material Spec, Heat numbers, Mechanical
properties to drawing and material test certificate.

✓Ensure the piping & pipe fitting material are handled / stored and preserved procedure. Ensure
the issue / received materials and traceability are maintained.

✓Preparing and maintaining various QA/QC documents and final test packages.

✓Reinstatement inspection of completed / erected pipeline.

✓Conform repairs re-testing and re-inspection in accordance with specification.

✓Inspection of gaskets, supports, valve prior to line reinstatement acceptance as per latest
drawing for construction code and specification standards.

✓Non-conformity reports are identified / rectified and re-checked.

✓Ensure the final piping line checks are carried out all the valves open/closed position are done
in coordinating with the Commission Engineer. This shall be ensured that all piping lines with
correct rating are available –ready for commissioning.

✓All the results of the inspections and test are reported on a daily basis and to the reports are
reviewed and approved to the applicable code and customer specification. Any deviation shall be
documented and resolved.

✓Quality records shall be complied in a test pack or quality control test pack and submitted for
final approval along with as built drawing.

STRUCTUARAL:

✓Preparing PQR and WPS if required.


✓Conducting WQT for Welders every week.

✓Making Weld Map.

✓Making and Maintaining weld summary and ITP requirement Document like a Dimension
Report, Weld Visual Report and Painting Report for Client submission.

✓Doing internal inspection for Welding, Fit-up and Painting.

✓Arranging Client inspection based on site Engineer.

✓Co-ordinate Client at the Time of inspection& Quality walk through.

✓All Documentation and System Updates.

✓Daily Report to Manager.

PERSONAL PROFILE:

Father’s Name: Mr.Masilamani

Date of Birth : 13.05.1986

Permanent Address : 2/186 North Street,Mahilchipuram,

Valliammalpuram (Post),Vallioor (Via)-627117,

Tirunelveli (District), Tamilnadu.

Nationality : India

Marital Status : Married

Language Known : Tamil, English & Hindi

Passport No :R 8123544 Valid up to 12-07-2027, Issued at Dubai

I do hereby that the particulars of information and facts stated herein


above are true, correct and complete to the best of my knowledge and belief.

Date Dennish Masilamani.

You might also like