Standard Operating Procedure / Work Instructions / Visual Aids
Standard Operating Procedure / Work Instructions / Visual Aids
B
2.
3 3
Complete all bending
Bending
Operation operation as per drawing.
production.
2) Set up approval is to be obtained before the start of the production and after any setup change
3) All workstation should be free from dust.
Page 1 of 3
CHHAPARIA INDUSTRIES PVT LTD
NOT OK
Instructions:
1) All non-confirming parts are to be placed in the NC area PREPARED BY CHECKED BY APPROVED BY
2) Set up approval is to be obtained before the start of the production and after any setup change
3) All workstation should be free from dust.
Page 2 of 3
CHHAPARIA INDUSTRIES PVT LTD
Stop the
As per Before
Back Ever Taper process and
2 component bending
gauge y lot bending take corrective
requirement start
action
Safety Requirement
Instruction
s
1. Hand or Finger is liable to get trapped between punch & die. Do not leave your hand / finger anytime between punch & die 'V' portion.
2. If two operators are using bending machine, only one operator should operate the pedal. Second operator must say 'OK' to first operator before ped
3. Beware of blank turning during bending.
Instructions:
1) All non-confirming parts are to be placed in the red bin. PREPARED BY CHECKED BY APPROVED BY
2) Set up approval is to be obtained before the start of the production and after any setup change
3) All workstation should be free from dust & oil.
Page 3 of 3