This document provides a cost estimate for the headwork/offtake and infrastructure of a project. It lists the various construction components, units of measurement, quantities, rates, and total amounts. The headwork/offtake cost estimate includes items like excavation, backfilling, masonry work, plastering, concrete, and reinforcement bars. The infrastructure cost estimate covers the main canal, structures like road crossings and turnouts, and items such as excavation, masonry, plastering, concrete pipes, and boulders. It concludes by summarizing the total costs of the headwork, infrastructure, and overall project.
This document provides a cost estimate for the headwork/offtake and infrastructure of a project. It lists the various construction components, units of measurement, quantities, rates, and total amounts. The headwork/offtake cost estimate includes items like excavation, backfilling, masonry work, plastering, concrete, and reinforcement bars. The infrastructure cost estimate covers the main canal, structures like road crossings and turnouts, and items such as excavation, masonry, plastering, concrete pipes, and boulders. It concludes by summarizing the total costs of the headwork, infrastructure, and overall project.
Original Description:
Bill of Quantities (BoQ)
open and Blank I hope it will help
This document provides a cost estimate for the headwork/offtake and infrastructure of a project. It lists the various construction components, units of measurement, quantities, rates, and total amounts. The headwork/offtake cost estimate includes items like excavation, backfilling, masonry work, plastering, concrete, and reinforcement bars. The infrastructure cost estimate covers the main canal, structures like road crossings and turnouts, and items such as excavation, masonry, plastering, concrete pipes, and boulders. It concludes by summarizing the total costs of the headwork, infrastructure, and overall project.
This document provides a cost estimate for the headwork/offtake and infrastructure of a project. It lists the various construction components, units of measurement, quantities, rates, and total amounts. The headwork/offtake cost estimate includes items like excavation, backfilling, masonry work, plastering, concrete, and reinforcement bars. The infrastructure cost estimate covers the main canal, structures like road crossings and turnouts, and items such as excavation, masonry, plastering, concrete pipes, and boulders. It concludes by summarizing the total costs of the headwork, infrastructure, and overall project.
Download as DOCX, PDF, TXT or read online from Scribd
Download as docx, pdf, or txt
You are on page 1of 3
COST ESTIMATION
Cost Estimate of the Headwork/Offtake
A Headwork/Offtake S.no Description Unit QTY Rate Amount (USD) (USD) 1 Off-take 1 1.1 Excavation Cubic m 518.00 1.2 Backfilling Cubic m 172.67 1.3 Compaction Cubic m 172.67 1.4 Disposal Cubic m 345.33 1.5 Masonry work Cubic m 388.00 1.6 Plastering work square m 216.00 1.7 Concrete work C-25 (1:2:4) Cubic m 130.00 1.8 Reinforcement bars Φ 10 mm diameter Pcs 114.72 1.9 Site Clearance square m 240.00 1.10 Tie wire Kg 104.00 1.11 Boulders Cubic m 319.00 2 Retaining walls 2.1 Excavation Cubic m 116.80 2.2 Backfilling Cubic m 38.93 2.3 Compaction Cubic m 38.93 2.4 Disposal Cubic m 77.87 2.5 Masonry work Cubic m 165.76 2.6 Plastering work square m 95.60 Total Headwork/Offtake Cost
Cost Estimate of the Infrastructure
B Infrastructure
S.no Description Unit QTY Rate Amount
3 Main Canal 3.1 Excavation Cubic m 953.29 3.2 Backfilling Cubic m 296.01 3.3 Compaction Cubic m 296.01 3.4 Disposal Cubic m 296.01 3.5 Masonry work Cubic m 540.94 3.6 Plastering work square m 1,352.34 4 Canal Structures (Road Crossings, Super passage and turn outs) 4.1 Excavation Cubic m 61 4.2 Backfilling Cubic m 38.2 4.3 Compaction Cubic m 38.2 4.4 Masonry work Cubic m 84.92 4.5 Plastering work Cubic m 137.40 4.6 Concrete Pipe Φ 40 mm m 12.00 4.7 Concrete work C-25 (1:2:4) Cubic m 3.52 4.8 Reinforcement bars Φ 10 mm Pcs 17.00 4.9 Boulders Cubic m 24.00 Total Infrastructure Cost Cost Summary S.no Description Amount (USD) 1 Total headwork Cost 2 Total Infrastructure Cost 3 Total Project Cost (HW + Infra)