Marking On The Pipes Were Randomly Checked and Found To Be Satisfactory

An inspection was conducted of 8 packages of pipes unloaded from the ship LOWLANDS BRABO at Sohar port. The pipes were visually inspected and no damage was found. A total of 4 packages of 7-inch pipes between 8.53-10.06 meters and 4 packages between 11.58-12.80 meters were accepted with satisfactory markings. General HSE procedures were followed and 2% of pipes showed minor rust and dirt on external surfaces.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views5 pages

Marking On The Pipes Were Randomly Checked and Found To Be Satisfactory

An inspection was conducted of 8 packages of pipes unloaded from the ship LOWLANDS BRABO at Sohar port. The pipes were visually inspected and no damage was found. A total of 4 packages of 7-inch pipes between 8.53-10.06 meters and 4 packages between 11.58-12.80 meters were accepted with satisfactory markings. General HSE procedures were followed and 2% of pipes showed minor rust and dirt on external surfaces.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Client Reference: BJ2001WAK005, BJ2001WAK006 Assign No.: --- Report No.

: 01

MATERIAL INSPECTED THIS VISIT

Pipe unloading Inspection at Sohar port


Tag No., Batch No., Serial
Item No. Quantity Description
No., Cast, Heat No.
-- 4 Packages VAM TOP HC 7” OD 35.00 LBS/FT X 8.53 - 10.06m BYYF46240000

-- 4 Packages VAM TOP HC 7” OD 35.00 LBS/FT X 11.58 - 12.80m BYYF49130000


RESULTS OF
Accepted Not Compliant ORDER STATUS: Complete Incomplete
INSPECTION:
1.0 SUMMARY:
As per client notification, visit was made at Sohar port to witness the unloading inspection of above mentioned pipes from Ship
(LOWLANDS BRABO) to Port yard.

 Total 8 Packages were unloaded from Shipment LOWLANDS BRABO.(See the attached pics)
 All Pipes were visually checked only at accessible areas.
 All Pipes were unloaded and stacked at port yard.
 No Pipes were found to have damaged during unloading inspection.
 Marking on the pipes were randomly checked and found to be satisfactory.

7” Size
Number of box end protector found damage Nil
Number of pin end protector found damage Nil
Number of pin damage Nil
Bend or damage pipes Nil
2% of pipes were found with rust, dirt & foreign materials on external
Percentage of pipes rusted
surface.

ATTACHMENTS: NCR Punch list Partial Release Balance Release Full PO Release
RECORD OF HOURS

2.0 PERSONS PRESENT:


3.0 DOCUMENTATION USED / APPROVAL STATUS: Packing list

4.0 INSPECTION CARRIED OUT (reference ITP clause if applicable):


ITP Clause Notification Inspection Activity Description Result

-- --  Total 8 Packages were unloaded from Shipment LOWLANDS BRABO.(See the Satisfactory
L5-FMT-046 Rev. 03
Report Headings: 2.Persons Present 3.Documentation Used /Approval Status 4.Inspection Carried Out 5.HSE Feedback on
the Vendor 6.Results/Conclusions 7.Overall Order Status 8.Next Visit/Exit Call 9.Attachments/Photos

attached pics)
 All Pipes were visually checked only at accessible areas.
 All Pipes were unloaded and stacked at port yard.
 No Pipes were found to have damaged during unloading inspection.
 Marking on the pipes were randomly checked and found to be satisfactory.

CALIBRATION OF INSTRUMENTATION USED:


Type of Equipment Manufacturer Serial N° Date Last Calibrated Current Calibration Expiry Calibration
Date Certificate N°
-- -- -- -- -- --

5.0 HSE FEEDBACK ON VENDOR: General HSE was followed in Site.

6.0 RESULTS / CONCLUSIONS:


 Total 8 Packages were unloaded from Shipment LOWLANDS BRABO.(See the attached pics)
 All Pipes were visually checked only at accessible areas.
 All Pipes were unloaded and stacked at port yard.
 No Pipes were found to have damaged during unloading inspection.

7.0 OVERALL ORDER STATUS: NA


DELIVERY:
PO Delivery Date Current Scheduled Delivery Delivery Point Comments
-- -- -- --

8.0 NEXT VISIT / EXIT CALL (must give estimated date if no fixed date; include stage/activity details): NA

9.0 ATTACHMENTS: NA
PHOTOGRAPHS:

L5-FMT-046 Rev. 03
Report Headings: 2.Persons Present 3.Documentation Used /Approval Status 4.Inspection Carried Out 5.HSE Feedback on
the Vendor 6.Results/Conclusions 7.Overall Order Status 8.Next Visit/Exit Call 9.Attachments/Photos

L5-FMT-046 Rev. 03
Report Headings: 2.Persons Present 3.Documentation Used /Approval Status 4.Inspection Carried Out 5.HSE Feedback on
the Vendor 6.Results/Conclusions 7.Overall Order Status 8.Next Visit/Exit Call 9.Attachments/Photos

L5-FMT-046 Rev. 03
Report Headings: 2.Persons Present 3.Documentation Used /Approval Status 4.Inspection Carried Out 5.HSE Feedback on
the Vendor 6.Results/Conclusions 7.Overall Order Status 8.Next Visit/Exit Call 9.Attachments/Photos

--- End of the Report ---