Report Bathymetry PT - Smoe Indonesia - 100719
Report Bathymetry PT - Smoe Indonesia - 100719
Report Bathymetry PT - Smoe Indonesia - 100719
BATHYMETRY SURVEY
ON JULY 10,11 2019
Consultant Survey :
CV . KURNIA RAYA CONSULTANT
Komp.Perkantoran Kurnia Djaja Alam, Blok.B, No.14 -15, Batam Centre
Telp : (0778) 702 7455, 702 3446 - Fax : (0778) 748 5778
Email : [email protected]
Website : www.kurniarayagroup.tk
0
✓ LIST OF CONTENTS
1. Subject ……………………………………………………………………………………………………………. 2
2. Location of Survey …………………………………………………………………………………………… 2
3. Work & Date of Survey ……………………………………………………………………………………. 3
4. List of Personil ………………………………………………………………………………………………… 3
5. List of Equipment ……………………………………………………………………………………………. 4
6. Result of Work ………………………………………………………………………………………………… 4
1
1. Subject
2. Location of Survey
2
3. Work & Date of Survey
- Reference for zero level we adopt to Singapore Dock Victorian tide table.
- During survey tide level date July 10 2019, time 10:44:18 WIB is at + 0.714 m
- During survey tide level date July 11 2019, time 20:05:38 AM WIB is at + 1.72 m
- Work of this measurement executed on :
▪ July 10 2019, started at 10:44 WIB local time shall at 14:18 WIB local time. Tide
Position during the measurement from +0.71 to +1.60 m
▪ July 11 2019, started at 20:05 WIB local time shall at 20:55 WIB local time. Tide
Position during the measurement from +1.72 to +1.53 m
▪ Comparison Singapore Dock Victorian tide table toward live monitoring at
PT.SMOE Indonesia, at Kabil – Batam – Kepulauan Riau – Indonesia, diference
level and time shown on table as attached.
▪ Sketch Of Measurement
4. List of personil
3
5. List of equipment
6. Result of work
- Result of from this work is knowable elevation surface of sea base elevation and water
depth of the sea.
7. Final drawing
8.
Report by :
CV.Kurnia Raya Consultant