ID Task Name Duration Baseline Start Baseline Finish 2005 2006 2007 2008 2009 2010 2011 2012

Baseline Finish 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1
1
Overall project Timeline Tue 3/22/05
2190 days Thu 7/21/11
2
Appraisal, Select and Define 123 daysMon 7/25/05 Fri 7/8/11
3 Conceptual Review 37 days Wed 10/15/14 Tue 10/21/14
4 Conceptual/Design Finalization 70 days Sun 10/19/14 Tue 10/21/14
5 Conceptual Approval 23 days Thu 10/23/14 Sat 10/25/14
6
Engineering 134 daysThu 10/23/14 Mon 12/22/14
7 Civil Foundation 35 days Sat 11/1/14 Mon 11/17/14
8 Civil Structural ( outsourcing) 15 days Thu 12/11/14 Mon 12/22/14
9 Piping 7 days Tue 11/18/14 Mon 11/24/14
10 I&E 85 days Thu 10/23/14 Thu 12/11/14
11
Procurement 189 daysFri 10/31/14 Sat 3/14/15
12 Arrival /clearance of 3*HVAC Plants 16 days Thu 11/20/14 Thu 11/20/14
13 Arrival/clearance Cooling towers 15 days Sat 1/3/15 Sat 1/3/15
14 Arrival of Control Panel for HVAC Plant 12 days Mon 1/5/15 Mon 1/5/15
15 14 days
Procurement Of fork lifters, Valves, lift apparatus Fri 12/12/14 Thu 1/22/15
16 Procurement of Lithium 23 days Fri 10/31/14 Thu 11/13/14
17 Fabrication of Control Room 165 daysSat 11/1/14 Fri 12/12/14
18 Procurement of Power cables 34 days Fri 12/12/14 Thu 1/15/15
19 Procurement of Motors and Pumps, Vaccum38pumps days Mon 12/22/14 Sat 1/10/15
20 9 days Sun 12/14/14
Procurement of Glass for Glass work in the building Sun 12/21/14
21 Bidding Job award for Civil Job award 8 days Thu 11/20/14 Wed 11/26/14
22 Bidding Job award for HVAC equipment 8 days Wed 12/24/14 Tue 12/30/14
23 Bidding Job award for Cooling towers, pumps 8 days Sat 12/13/14
and motors Fri 12/19/14
24 Execute/Operate 1804 daysThu 11/20/14 Sat 3/14/15
25 Bidding Job Award and Construction 1795 daysThu 11/20/14 Sat 3/14/15
26 Area Leveling for new HVAC equipment 123 daysThu 11/20/14 Mon 12/22/14
27 Civil foundations for new HVAC equipment925 daysFri 12/19/14 Mon 1/12/15
28 Civil Works for Control Room 725 daysThu 12/25/14 Wed 1/14/15
29 Preparation of Cable duct at HVAC 156 Fri 12/5/14 Wed 1/7/15

equipment and whole building days


30 Installation of Cable trays and Checker 121 Fri 1/9/15 Sun 1/18/15
plate on cable duct days

Task External Tasks Manual Task Finish-only Baseline


Split External Milestone Duration-only Deadline Baseline Milestone
Project: execution timeline1
Date: Fri 2/22/19 Milestone Inactive Task Manual Summary Rollup Critical Baseline Summary
Summary Inactive Milestone Manual Summary Critical Split Progress
Project Summary Inactive Summary Start-only Late Slack

Page 1
ID Task Name Duration Baseline Start Baseline Finish 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1
31 Civil Foundation for HVAC Shed beams 235 Wed 12/24/14 Fri 1/2/15

days
32 Civil Foundations for Building 325 Sat 11/22/14 Wed 11/26/14

Generators and Cooling towers of the days


33 building
Installation of Generators for 480 Fri 1/16/15 Thu 1/22/15
emergency electricity supply days
34
Installation of motors and pumps on 267 Thu 1/15/15 Wed 1/21/15

the HVAC equipment days


35 Placement of HVAC and electricity 357 Fri 1/9/15 Sat 1/10/15

backup Control Room on its foundation days


36 Erection of HVAC and electricity shed 135 daysWed 1/28/15 Tue 2/10/15
37 349 days
Installation of AHU's and FCU's on different floorsNA NA
38 Piping works for electricity epuipment 648 daysSun 1/25/15 Sun 2/8/15
39 Piping works for Fuel gas network 264 Mon 12/22/14 Mon 1/5/15
days
40
Cabling works between Generators, 135 Mon 1/19/15 Wed 1/28/15

HVAC equipment and Control room days


41 Cabling works between Control Room and daysThu 1/29/15
325eequipment Sat 2/7/15
42 Grounding works 167 daysSat 1/17/15 Mon 1/26/15
43 Electricity Generators and HVAC 32 days Wed 2/11/15 Sun 2/15/15
equipmenrt Testing on Load Bank
44 16 days Wed 2/18/15
Electricity Generators and HVAC Plant's Commissioning Sun 2/22/15
45
Startup 15 days Thu 3/5/15 Thu 3/5/15
46
Project Close-out and Handover 38 days Sun 3/8/15 Sat 3/14/15

Task External Tasks Manual Task Finish-only Baseline


Split External Milestone Duration-only Deadline Baseline Milestone
Project: execution timeline1
Date: Fri 2/22/19 Milestone Inactive Task Manual Summary Rollup Critical Baseline Summary
Summary Inactive Milestone Manual Summary Critical Split Progress
Project Summary Inactive Summary Start-only Late Slack