Curriculum Vitae: Name: Upendra Kumar

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 6

CURRICULUM VITAE

Post Applied-Welding Supervisor


NAME : UPENDRA KUMAR
Father Name-Kesho Prasad Yadav Address: VILL-Bhola Bigha,
MOBILE NO:+91 7739122069,9135272598 Po- Bahadurpur Ps-Rajauli
Email ID : [email protected] Dist-Nawada Bihar India Pin-805125

Professional Qualification:-

Education Board /University Percentage


DIPLOMA IN (Mechanical Noida Delhi A Grade
Engg.)
HSC BSEB PATNA 54.60%
SSC BSEB PATNA 72.80%

Technical Exposure:

Safety training from USHA Fire & Safety


Computer proficiency: MS office, outlook, Smart plant
PTW Card no: OC3225
Familiar with ASNT LEVEL- II DPT,MPT, RT and UT.
Drawings familiar with GAD, P&ID, Isometrics, as built drawings.

Client Exposure:-

 HPCL – MUMBAI DODSAL LTD


 PUNJ LLOYD LTD RATNAGIRI
 IMECO.WLL GASCO ABUDHABI RUWAIS
 PENTA GLOBAL ENGG. ABUDHABI GASCO HABASAN 5
 QCON QATAR ENGG.CO-WLL QATAR PETRO CHEMICAL
 QCON QATAR ENGG RASGAS LTD RASLAFFAN
 QCON QATAR ENGG QATAR GAS LNG PROJCET LTD RASLAFFAN

Experience Synopsis: 10 years at respective Sites of above Clients

DOMAINS Familiar with Project construction, end to end Shutdowns , Turnaround And
Project Execution- fabrication, piping, Third party inspectin & painting In refinery & offshore
platforms, Knowledge of ASME Codes and standards in construction

Metals Expsure: CS , SS, LAS, LTCS, (pipes, Plates, castings, bolts), DSS ,Cast Iron , Copper ,PVC
P 91, P 11, P 5, P 20, P 22.

Equipments Exposure: CRANES 500 ton, Hydra , Chain blocks ,winches


Professional Career:

 HPCL – MUMBAI DODSAL LTD


 PUNJ LLOYD LTD RATNAGIRI LNG PROJECT From Aug 2005 to May 2007
 IMECO.WLL GASCO ABUDHABI RUWAIS Welding Supervisor- From Jan 2009 to Jun
2011
 PENTA GLOBAL ENGG. ABUDHABI GASCO HABASAN 5 Welding Supervisor –From Sep
2011 to April 2012
 QCON QATAR ENGG.CO-WLL QATAR PETRO CHEMICAL Senior Welding Foreman From
Feb 2013 to July 2013
 QCON QATAR ENGG RASGAS LTD RASLAFFAN Senior Welding Foreman From Jan 2014
to May 2014
 QCON QATAR ENGG QATAR GAS LNG PROJCET LTD RASLAFFAN Welding Supervisor
From Jan 2017 to Mar 2017
 QCON QATAR ENGG QATAR GAS LNG PROJCET LTD RASLAFFAN Welding Supervisor
From Dec 2017 to Mar 2019 Till

Responsibilities:-

 Project engineering end to end execution activities- painting, insulation, fabrication,


piping, structural supports. Manpower management, site supervision. Lifting &
erection plan
 Maintain enquiry log and ongoing job log., making MIS reports.
 Analyze drawing and Technical specifications. Follow up Stage wise inspection
 Prepare RFQ, BOQ by Extracting from fabrication drawing/Assembly drawing.
 Coordination with Store, Production, Civil, Mechanical, piping, marketing department
 Develop and verify MTOs, equipment and bulk quantities against P&IDs and
drawings. Line up project wise activities and its daily follow up.
 Technical documentation, reports, billing report passing to senior management.
 Review safety compliance with defined scope of work. EQUIPMENTS HANDLED: Heat
Exchanger, PIPING,Valves,vessel, columns,reactor, filter strainers and its Maintenance
too..
 Supervising shop activities, maintain work front as per order priority.
 Vendor management, contracting personnel with bid analysis and contract
negotiations. Meeting Project deadlines.
 Making QA/QC reports during and taking third party recommendations.
 Review of Project Specification, Contract Scope, Project Schedule and updation
 Execution Schedule & Hydro Test Package for Site Clearance Area,
 Reviewing Isometric Drawings, P&ID and GAD developments.
 Preparation of detailed MTO & BOM for tendering & making negotiations with
vendors for sub-contractors.
 Preparing of Method Statement, various operating and maintenance
procedures ,Material Approval Request and inventory control.
 Review of Piping Class, Inspection and Test Plan, JHA, Welding Procedure
Specification, Blasting and Painting Specification & Procedure etc.
 Review of piping isometric drawings, P &ID/Support drawings/Method Statements.
 Execution, Inspection, Supervision and co-ordination of above ground and
underground piping System.
 Preparation and Monitoring of Weekly & Monthly Execution Schedule.
 Co-ordinate NDT Sub contractor to execute NDT, PWHT and Hardness Test etc.
 Preparation of Monthly and Weekly progress report.
 Preparation of Construction Activity schedule and Coordinating with planning
department to meet the project targets and milestones.
 Coordinate with Clients, Design and Engineering departments in order to solve the
technical problems & Engineering issues.
 Production monitoring and expediting of deliverables. Preparing material take off and
materials requisitions.
 Preparation of Hydro Test pack, Planning and execution of Preparatory activities.
 Execute Hydro test, Pneumatic test and Pre-commissioning, Commissioning activities
 Familiarize with contract document, scope of work, International standards and
Quality control procedures to be used in the project.
 Determining Field Joints and Spooling for the ISO’s received from Clients.
 Provide technical answers to Engineering Queries raised up by the subcontractor
conforming design drawings and standard required.
 Responsible for coordinating Reinstatement, Painting & Insulation, pre-
commissioning and commissioning activities.
 Preparing and maintaining proper documentation regarding execution and extra jobs
done for the smooth evaluation of the progress and to support the bill.
 Conduct all activities in safe efficient manner in accordance with the company’s
policies and procedures.
 Aware with phases of projects ,tendering ,estimation, procurement, planning,
execution, billing completion within stipulated time period.
 NATURE OF JOB:

 Traceability of materials with respect to Mill Certificate for the receiving


material like Pipes, Plates, Flanges, Elbows etc.

 Preparing Quality assurance plan. And Inspection Test Plan as per client
specification and quality requirements.

 Check Test the material if required and compare with ASME

 Preparation of WPS and PQR as per ASME Section IX

 Stage Inspection is followed as per quality assurance plan.

 Welding Inspection, visual inspection of Joint fit-ups. In process and completed


Welding inspection on various materials. Monitoring of welding parameters during
procedure Qualification Testing. Witness Welder Qualification tests.

 Welding Inspection duties including setup in process inspection.


 Welder’s Performance, Production Testing and welding supervision.

 Inspection Planning and Execution.

 Raising the NCR for the concern department who is going against the QAP,
Approved work Procedure, Quality and system.

 Offering inspection to client witness point as per quality assurance plan.

 Analyzing production process to the entire satisfaction of client quality.

 Continuous improvement in the welding quality by implementing new


Technique in the welding.

 Maintaining the ISO Document for Auditing purpose.

 Conducting Internal inspection and maintaining documents.

 Paining inspection and making inspection reports.

 Co-ordination of NDT activities if required.

 Mechanical clearance for NDT Cleared Loops.

 Conduct Hydro test for M/C cleared Loops

 Updating and maintaining the Calibration status for all instruments.

 Involved in handling all types of welding work like Arc, Tig & Sub-Arc welder, in
Heavy Structural and Piping work at Fabrication.

 All round Welding experience of Arc & Tig Welding in Ship repair & Oil Refinery
Piping works.

 All pressure parts, Turbines, Power Plant, Refinery Plant, Rig Beam etc.

 THE DETAILS OF MY DUTIES & RESPONSIBILITIES :

 In charge of all Pipe Welding activities.

 Maintaining documentation in regard to drawing and daily / Weekly progress


report.

 Assess Manpower and consumable requirement based on production norms


and

 priorities and allotted tasks to ensure resources are deployed with maximum
effectiveness.
 Provided Technical advise and training for the solving of more critical problems
referred by Charge Hand and Welder to develop their level and competence.

 Prepare regular report on work progress and forecasting for analysis by


Engineer.

 Co-ordinate with other trade disciplines and sections to ensure integration of


work.

 Receive and review assignments for short term work programs from Engineer.

 Co-ordinate with QC department for inspections.

 DUTIES & RESPONSIBILITIES INCLUDES :

 Finalizing all Welding Inspection, documentation, Quality control and


witnessing of Punch site.

 Organizing and conducting the weekly meeting with a Team of Foreman and
Charge Hand .

 Ensuring the safe and economic access is provided for the craft worker.

 Ensuring that all Foreman and workers are conforming to site following Safety
Rules and Regulations.

 Ensuring that all the Welding Jobs are carried out according to site Welding
procedures.

 Ensuring that Welding schedules are met and still working within the site
following Safety Regulations.

 Ensuring that the materials and workers are available to meet the site welding
requirement.

 Ensuring that all the documentation are adhered to tool box talks, harness,
inspection, site request system and Pipe welding system and safety reports.

 Ensuring that work force maintained good housing keeping practice throughout
the area.
Personal Dossier:

Languages Known : Hindi,English

Date of Birth : 10.Jun.1994

Marital Status : Married

Passport number : S9554552 Valid till 25 April 2029 issued From Patna office.

Declaration:

I hereby declare that above information furnished is true to best of knowledge.

Date: Upendra Kumar

You might also like