8 Point Mooring - Attachment Xxxii

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5
At a glance
Powered by AI
The documents provide inventories, inspection checklists, and registers for mooring equipment on a vessel.

The inventory lists various mooring equipment including anchors, wires, buoys, and deck tools.

The equipment test list checks the functioning and condition of mooring winches, navigational equipment, communications, lighting, and other systems.

APEX GLOBAL ENGINEERING SDN BHD (828911-T)

Attachment XXXII
8 POINT MOORING EQUIPMENT

INVENTORY

NO. ITEMS QUANTITY


1. Anchor windlass Fwd: 2 Aft: 2
2. Main Anchor Wire 4 units
3. Main Anchor Wire [Spare]
4. Anchor Delta Flipper (5T) 4 pcs
5. Anchor Buoy (crucifix type) 4 pcs
6. Spring Buoy 2 pcs
7. Capstan Fwd: 1 Aft: 2
8. Pennant wire for anchor buoy 38mm x 50m 8 lgth
9. Pennant wire for spring buoy 38mm x 40m 2 lgth
10 Webbing sling BL 10T x 6m 6 lgth
11 Webbing sling SWL 5T x 6m 4 lgth
12 Chain pigtail for anchor and buoy
13 Soft moor polypropylene rope 64 mm
14 Deck tools – Sledge hammer 1 unit ea
Crow Bar
Chisel
Marlin spike
Adjustable spanner
Hacksaw
Split pin
5 ton shackle
Norwegian buoy t
Messenger Ropes (1 mm) 1 coil
Grapnel
Boat hook
Plier
15. Communication equipment (walkie talkie) 2 units [Fore & Aft]
16 Flashlight 2 units [Fore & Aft]
17 Wire clamp stopper for spring buoy
APEX GLOBAL ENGINEERING SDN BHD (828911-T)

Attachment XXXII

EQUIPMENT TEST LIST

NO. EQUIPMENT CHECK/REMARKS

1. Mooring winch generator


2. Mooring winch
3. Guide rollers
4. Deck lighting
5. Communications
6. Gas cutting gear
7. All navigational equipments
- Gyro compasses & repeaters
- Radar
- GPS
- Echo sounder
- VHF radio [inclusive walkie talkie]
- PA system, bridge to winch control
- Navigational lights
- Search light
- Bridge and local control for main propulsion and
Bow thruster.
APEX GLOBAL ENGINEERING SDN BHD (828911-T)

Attachment XXXII
8 POINT ANCHOR MOORING CHECKLIST

VESSEL NAME: _________________________ DATE: ______________

NO. EQUIPMENT INSPECTION & TEST CHECK REMARKS


1. ANCHOR WINCH i. Function test
ii. Brakes
iii. Gears, nipple point etc.
iv. Ratchet
v. Guide roller
vi. Local & remote control
vii. Foundation & securing bolt
for crack & damage
2. TUGGER WINCH i. Function test
ii. Brakes
iii. Wire properly spooled up
iv. End fitting for tugger wire
v. Sufficiently greased
3. ANCHOR STOPPER i. Function test
ii. Foundation & securing bolt
for crack & damage
4. CAPSTAN i. Function test
ii. Brakes
iii. Defects
5. COMMUNICATION i. Bridge/deck P.A
ii. Bridge/winch control station
iii. VHF bridge/deck
iv. Intercom bridge/ER
6. Deck/Search lighting i. Lighting tested
ii. Defects
7. Main/spare anchor i. Wire condition
Wire ii. Length & breaking load are
sufficient
8. Navigational equipmt i. Function test
9. Tension meter II. Function test
10. CCTV iii. Function test
APEX GLOBAL ENGINEERING SDN BHD (828911-T)

Attachment XXXII

1. The inspection and test carried out shall be recorded in the deck log book.

2. This form to be filed onboard and kept at least two years .

______________________________ __________________________________

CHIEF OFFICER CHIEF ENGINEER


APEX GLOBAL ENGINEERING SDN BHD (828911-T)

Attachment XXXII

8 POINT ANCHOR MOORING REGISTER

VESSEL NAME:_________________________ DATE:______________

NO. DESCRIPTION SIZE/SWL QUANTITY CERTIFICATE LAST TESTED


1. Main Anchor
wire
2. Main Spare
Anchor wire
3. Shackles
4. Mooring ropes
5. Tugger wires
6. Capstan wires

1. TO BE UPDATED EVERY THREE MONTHS

2. ONE COPY FILE ONBOARD

3. ONE COPY RETURN TO TM/OM

…………………………………………………. ………………………………………………...
MASTER CHIEF OFFICER

You might also like