0% found this document useful (0 votes)
60 views

Comp Ass Res Sum

This document summarizes the competency assessment results for an Information Technology Service Management candidate at level V. The candidate was assessed in three projects: establishing and maintaining client and business relationships; preparing a disaster recovery and contingency plan; and developing an action and system infrastructure design plan. The assessor found the candidate competent in some but not all core competencies and recommended re-assessment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views

Comp Ass Res Sum

This document summarizes the competency assessment results for an Information Technology Service Management candidate at level V. The candidate was assessed in three projects: establishing and maintaining client and business relationships; preparing a disaster recovery and contingency plan; and developing an action and system infrastructure design plan. The assessor found the candidate competent in some but not all core competencies and recommended re-assessment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Occupational Code: EIS ITM 5

COMPETENCY ASSESSMENT RESULTS SUMMARY


Candidate’s Name
Assessor’s Name
Occupation Information Technology Service Management
Level V
Assessment Centre
Date of Assessment
Nature of Assessment Qualification-based
Performance of the candidate
(Please tick)
A. Observation with Oral Questioning
NOT YET Not
COMPETENT
COMPETENT Applicable
Project 1- Establish, and Maintain client user
liaison and Business Relationship
EIS ITM5 01 0811 Establish and Maintain Client User
Liaison
EIS ITM5 09 0811 Establish and Conduct Business
Relationship
Project 2- Prepare Disaster Recovery and
Contingency Plan
EIS ITM5 02 0811 Prepare Disaster Recovery and
Contingency Plan
Project 3 – Developing an action and System
Infrastructure Design Plan
EIS ITM5 03 0811 Develop System Infrastructure Design
Plan
EIS ITM5 05 0811 Research and Review Hardware
Technology Options for Organizations
EIS ITM5 06 0811 Match IT Needs with the Strategic
Direction of the Enterprise
EIS ITM5 08 0811Facilitate and Capitalize on Change and
Innovation
General Comments [Strengths / Improvements needed]
Occupational Code: EIS ITM 5

Recommendation
For issuance of NQC (Satisfactory in all units of Competence and
Oral Interview)

For issuance of CC (Satisfactory In Some Core Competence)

For re- assessment (All core competencies not satisfied)


Candidate’s
Date:
signature:
Assessor’s
Date:
signature:

You might also like