Group of Strategy

The document discusses defining strategy groups in SAP. It provides steps to create a new strategy group, assign it to a material, and create a scenario for that material. When MRP is run for the material, the output shows how the available stock and planned orders are determined based on the main and alternative strategies defined in the group. The main make-to-order strategy does not consume the available stock, while the alternative make-to-stock strategy consumes part of the stock to fulfill the PIR requirement.

Uploaded by

Mangesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views12 pages

Group of Strategy

The document discusses defining strategy groups in SAP. It provides steps to create a new strategy group, assign it to a material, and create a scenario for that material. When MRP is run for the material, the output shows how the available stock and planned orders are determined based on the main and alternative strategies defined in the group. The main make-to-order strategy does not consume the available stock, while the alternative make-to-stock strategy consumes part of the stock to fulfill the PIR requirement.

Uploaded by

Mangesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

The group of strategy is nothing but the strategy group.

Planning strategies represent the business procedures for the planning of production quantities and dates

Define Strategy Group


In this step, you specify which strategies are to be grouped together into a strategy group. You can determine a main strategy a
The main strategy is proposed in demand management or sales order management but it can be overwritten by another plannin

Go to SPRO>IMG> Production> prdn planning> Demand Management> PIR> Plannign Strategy > Define strategy Group

Create New as below and save


Now assign this to material in MM02
Now created one scenario
for material R25200, already stock of 5 is available

Now created one sales order (VA01) with requirement of 4 and created PIR (MD61) with requirement of 10
When MRP (MD02) for R25200 is run, below is the stock requirement output in MD04
Analysis
In the group strategy, main strategy is 20 (Make to Order) hence the available stock is not consumed but the planned order of 4
alternative strategy is 10 (make to stock) hence the available stock of 5 is consumed for the PIR and for rest of 5, the planned o
s and dates

can determine a main strategy as well as a maximum of seven alternative strategies.


be overwritten by another planning strategy defined in the strategy group, if necessary.

tegy > Define strategy Group


rement of 10
umed but the planned order of 4 is created against sales order
R and for rest of 5, the planned order is created