The document is a defect list for an MEP project with 28 items needing attention. Key issues include unfinished walls and ceilings in the guard house, uninstalled lights and glass doors with traces in the office, incomplete electrical and canal systems in the factory and tank area, and cracked floors near channels in the factory. Most items are 0-50% complete with targeted finishing dates in June.

Uploaded by

Luy Nguyen Van
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
311 views10 pages

Defect List - 190619

The document is a defect list for an MEP project with 28 items needing attention. Key issues include unfinished walls and ceilings in the guard house, uninstalled lights and glass doors with traces in the office, incomplete electrical and canal systems in the factory and tank area, and cracked floors near channels in the factory. Most items are 0-50% complete with targeted finishing dates in June.

Uploaded by

Luy Nguyen Van
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 10

MEP Defect List

Owner By:
Project Check by:
Consultant Date: 08-06-19
Location Rev: 00

No. Location Picture Risk Finishing date Status Remark

12-06 14-06 19-06

1 Guard House The wall is absorbed 0% 0% Done

2 Guard House The ceiling is absorbed 0% 0% Done


3 Office The wall not finishing 100%

4 Office The light not install 100%

The glass door have


5 Office some tracer can't 0% 0% 0%
remove
The FF don't have fire
6 All 50% 50% Done
hose reel

7 Toilet Loss window 0% 0% 0%

Loss permanent
8 All 0% 0% Done Only temp cable
electrical system
All most canal system is
9 Factory 0% 0% 0%
not finishing

All most canal system is


10 Factory 20% 60% Done
not finishing

The foundation for tank


11 Tank area 0% 0% 90%
is not finishing
The foundation for tank
12 Tank area 0% 0% 90%
is not finishing

Don't have foundation


13 RO area 80% 100%
for RO sysytem

Not good cable


14 Light system 0% 0% Done
connection
Have some thing on the
15 Wall 0% 0% Done
wall

The cable routing not


16 Wall 0% 0% Done
good

The cable routing not


17 Wall 0% 0% 0%
good
18 Column Need repainting 0% 0% Done

19 Column Sika gound for column 0% 0% Done

Cover for chanel (RO


20 RO area 0% 0% 0%
area)
21 Factory Cover for big chanel 0% 0% 0%

The glass on handrail


22 Office 0% 0% 0%
have sharp

The floor of toilet not


23 Office 0% Done
finishing
The floor is crack (near
24 Factory 0% 0%
big channel)

The floor is crack (near


25 Factory 0% 0%
big channel)

26 Factory The floor is crack 0% 0%


V shape steel on
27 Factory channel must be 0%
Galvanize.