Schedule C PRICE
Schedule C PRICE
7131950105 L.T. Distribution Box for 100 kVA X'mer Each 17198.00
(200 A, isolator & 6 SP MCCB of 200 A)
7131950200 L.T. Distribution Box for 200 kVA X'mer Each 34396.00
(400 A, isolator & 6 SP MCCB of 120A)
7131950207 L.T. Distribution Box for 315 kVA X'mer Each 45861.00
(600 A, isolator & 9 SP MCCB of 160A)
7131960006 33 kV feeder control panel (Static Each 26078.00
Relays).
7131960007 33 kV Transformer Control Panel Each 28850.00
(Static Relays)
7131960008 Feeder Control (Static Relays) Each 26331.00
7131960009 Transformer Control (Static Relays) Each 26995.00
7131960520 2 Feeder Control (Static Relays) Each 39700.00
7131960522 1 Transformer+1 Feeder (Static Relays) Each 39815.00
Cement
Aluminium Paint.
M S FLAT 65X8 MM
R.S.JOIST 125 x 70 mm
R S JOIST 175X85 MM
Rails 52.09 kgs per Mtr./105 lbs yard
RAIL 60 KG PER METER
H BEAMS 152X152MM; 37,1 KG/MTR.
MS H BEAMS 152X152MM, 37.1 KG/MTR 11MTR
G.I. WIRES: - Barbed wire.
I BOLT M 20X128MM THREAD PORTION 50 MM I
G.I.BEND 200MM
SUSPENSION CLAMP
33 KV V CROSS ARM
33 KV 5 FEET CENTRE DC CROSS ARM
STRAIN PLATE
STRAIN PLATE
33KV top clamp
11KV top clamp
Disc Insulator
11 KV Pin insulator without GI Pin
33 KV Pin insulator without GI Pin.
SHACKEL INSULATORS: - 65 x 50 mm.
SHACKEL INSULATORS 90 x 75 mm.
Stay insulators.
GI Pin for 11 KV Pin insulator
GI Pin for 33 KV Pin insulator
Aluminium Bobbin.
7H.W. 50X65MM LT SHACKLE INSULATOR CMPLT
HARDWARE FOR 75X90MM LTSHACKLE INSULATOR
11 KV Strain hardware fittings.
33 KV Strain hardware fittings.
SSH ASSEMBLY WITH ARCING HORN FOR PANTHE
BINDING WIRE
CONDUCTOR AAA SQURREL
I bolt 16 mm Dia
STAY SET WITHOUT STAY WIRE16mm Paint11KV
STAY SET WITHOUT STAY WIRE 20mm (Painted
STAY WIRES : - 7/4,00 MM (7/8 SWG).
STAY WIRES: - 7/3,05 MM (7/10 SWG)
LT LINE SPACERS
EYE HOOK
33 KV guarding channel 100x50 mm.
SUMMATION METER
MEGGER 1000VOLTS
BOX SPANNER
11 KV CAPACITOR 600KVAR
RIVER SAND
500 kVA [CEA Design] (4 Star) Copper Wound NEW ITEM ADDED
Transformer
16 sq.mm Single Core PVC Sheathed Unarmoured
Cables
25 sq.mm Single Core PVC Sheathed Unarmoured
Cables
185 sq.mm Single Core PVC Sheathed Unarmoured
Cables
300 sq.mm Single Core PVC Sheathed Unarmoured
Cables
1 KM OF 11 kV LINE ON PCC POLE 140 KG 8.0 METER LONG WITH MAXIMUM OF 65 Mtrs
SPAN USING RABBIT AND WEASEL CONDUCTOR
2016-17
2016-17
S. New SAP
PARTICULARS Unit Qnty Rate Amount
No. Bin Code
1 2 3 4 5 6 7
1 140 Kg, 8.0 Mtr long PCC Poles 7130800012 No 2 1659.00 3318.00
2 DC Cross arm of 100x50 mm channel (4'/1.2 Mtr. Centre) 7130810512 Set 1 3256.41 3256.41
3 11 kV Polymer Disc Insulator 7130820010 No. 6 142.00 852.00
4 11 kV Strain H.W. fitting 7130820241 No 6 116.00 696.00
5 11 kV Polymeric Pin Insulator with Pin 7130820008 No 3 202.00 606.00
Horizontal & Cross Bracing 4' Center with set of 4 back
Set
Clamps
6
(i) M.S.Angle 65x65x6 mm 7130600032 Kg 52 33.24 1728.27
(ii) Back Clamp for Pole 7130810692 No 4 249.66 998.64
(i) Stay set 16 mm 7130860032 No 6 345.00 2070.00
7 (ii) Stay Wire 7/10 SWG @ 5.5 Kg per Stay 7130860077 Kg 33 59.23 1954.43
(iii) Stay Clamp 7130810026 No 6 120.59 723.54
Concreting of pole @ 0.3 Cmt and 0.2 Cmt per stay Cmt 1.8
8
Cement @ 208 Kg/cmt 7130200401 Kg 374 4.90 1832.60
9 Earthing Set (Coil earth as per Drawing No.-G/007) 7130870013 No 2 97.00 194.00
10 Red Oxide paint 7130211158 Ltr 0.5 133.00 66.50
11 Aluminium Paint 7130210809 Ltr 0.5 297.00 148.50
12 Barbed Wire [@ 2 Kg/Pole] 7130610206 Kg 4 63.96 255.85
S. New SAP
PARTICULARS Unit Qnty Rate Amount
No. Bin Code
1 2 3 4 5 6 7
13 Danger Board 7130880041 Each 1 62.00 62.00
MS Nuts and Bolts Kg 6
14 16x40 mm 7130620609 kg 0.5 63.00 31.50
16x200 mm 7130620631 kg 5.5 61.00 335.50
15 SUB TOTAL-1 19129.74
16 Incidental Charges @ 9% : - 0.09 1721.68
17 Back filling of poles with boulders @ 0.3 CMT per pole. No 2 218.61 437.22
18 Service in lieu of concreting metal & sand only Cmt 1.8 3153.01 5675.42
19 Labour charges as per Sch. No - CL-2 5921.83
Transport charges upto 50 Kms average lead from Area stores 2729.76
20
to construction camp incl. site transport (Transport Sch T-1)
21 SUB TOTAL-2 35615.64
Overhead Charges @ 11% [Market Fluctuation, Service Tax,
22 0.11 2104.27
Contractor's profit etc.]
23 Cost per DP for non-guaranteed works 37719.91
37720.00
24 Cost per DP for non-guaranteed works (Rounded off)
Note: All the rates are with considering price variation clause.
Earlier Qty. was 2 kG because @2 kg per pole
COST SCHEDULE C-3
2016-17
1 KM OF 11 kV LINE ON H-BEAM / PCC POLE SUPPORT WITH MAXIMUM OF 80 Mtrs SPAN USING
RABBIT CONDUCTOR
Cement @ 208 Kg/Cmt 7130200401 Kg 1872 4.90 9172.80 1622 4.90 7949.76
12 Red Oxide Paint 7130211158 Ltr 3 133.00 399.00 1.7 133.00 226.10
H-Beam 152X152 mm 37.1
S. New SAP 365 Kg 11 Mtr long PCC Pole
PARTICULARS Unit Kg/Mtr 11.0 Mtr Long
No. Bin Code
Qty Rate Amount Qty Rate Amount
1 2 3 4 5 6 7 8 9 10
13 Aluminium Paint 7130210809 Ltr 3 297.00 891.00 1.8 297.00 534.60
14 Barbed Wire [@ 2 Kg/Pole] 7130610206 Kg 24 63.96 1535.11 24 63.96 1535.11
15 Danger Board 7130880041 Each 12 62.00 744.00 12 62.00 744.00
16 Binding wire and tape 7130830006 Kg 3 130.00 390.00 3.5 130.00 455.00
MS Nuts and Bolts Kg 13 18
16x40 mm 7130620609 Kg 0.5 63.00 31.50
16x65 mm 7130620614 Kg 6 62.00 372.00
17
16x90 mm 7130620619 Kg 3.5 62.00 217.00
16x140 mm 7130620625 Kg 6.5 61.00 396.50
16x160 mm 7130620627 Kg 14.5 61.00 884.50
Guarding LS
(i) 11 kV Guarding Channel 100x50 mm 7130810511 No 1 2053.85 2053.85 1 2053.85 2053.85
(ii) G.I. Wire 8 SWG 7130870043 Kg 35 52.97 1853.92 35 52.97 1853.92
18 (iii) Stay Clamp 7130810026 No 2 120.59 241.18 2 120.59 241.18
(iv) Stay Wire 7/10 SWG @ 8.5 Kg/Stay 7130860077 Kg 17 59.23 1006.83 17 59.23 1006.83
(v) Stay set 16 mm with turn buckle without stay wire 7130860032 No 2 345.00 690.00 2 345.00 690.00
(vi) I- Bolt Big Size 7130620013 No. 4 116.46 465.84 4 116.46 465.84
19 SUB TOTAL-1 297211.94 190085.89
20 Incidental Charges @ 9% : - 0.09 26749.07 0.09 17107.73
21 Service in lieu of concreting metal & sand only Cmt 9 3153.01 28377.09 9 3153.01 28377.09
22 Labour charges as per Sch No - CL-4 40837.41 41948.64
Transport charges upto 50 Kms average lead from Area stores to
23 7192.97 7192.97
construction camp inc. site transport (Transport Sch. T-1)
24 SUB TOTAL-2 400368.49 284712.33
Overhead Charges @ 11% [Market Fluctuation, Service Tax,
25 0.11 32693.31 0.11 20909.45
Contractor's profit etc.]
26 Cost per Km for non-guaranteed works 433061.81 305621.78
27 Cost per Km for non-guaranteed works (Rounded off) 433062.00 305622.00
H-Beam 152X152 mm 37.1
S. New SAP 365 Kg 11 Mtr long PCC Pole
PARTICULARS Unit Kg/Mtr 11.0 Mtr Long
No. Bin Code
Qty Rate Amount Qty Rate Amount
1 2 3 4 5 6 7 8 9 10
Note: - Schedule C-2 is to be supplemented with every 1.0 Km. 11 kV line.
All the rates are with considering price variation clause.
2016-17
"H" Beam 152x152mm 37.1 Kg/Mtr
200 Kg; 9.0 Mtr long PCC Pole
11.0 Mtr long
Using 11 kV 3 Using 11 kV 3 Using 11 kV 3 Using 11 kV 3
S. New SAP
PARTICULARS Unit Rate phase Aerial phase Aerial phase Aerial phase Aerial
No. Bin Code
Bunched Cable Bunched Cable Bunched Cable Bunched Cable
3x35+35 sqmm 3x70+70 sqmm 3x35+35 sqmm 3x70+70 sqmm
31 Total Cost per Km including labour charges 1300295.05 1448954.97 810819.25 959479.16
"H" Beam 152x152mm 37.1 Kg/Mtr
200 Kg; 9.0 Mtr long PCC Pole
11.0 Mtr long
Using 11 kV 3 Using 11 kV 3 Using 11 kV 3 Using 11 kV 3
S. New SAP
PARTICULARS Unit Rate phase Aerial phase Aerial phase Aerial phase Aerial
No. Bin Code
Bunched Cable Bunched Cable Bunched Cable Bunched Cable
3x35+35 sqmm 3x70+70 sqmm 3x35+35 sqmm 3x70+70 sqmm
2016-17
S. New SAP
PARTICULARS Unit Qty Rate Amount
No. Bin Code
1 Raccoon Conductor 7130830060 Km 3.03 42115.00 127608.45
2 11 kV Guarding Channel 100x50 mm set. 7130810511 No 1 2053.85 2053.85
3 G.I. Wire 8 SWG 7130870043 Kg 35 52.97 1853.92
4 Stay Clamp 7130810026 No 2 120.59 241.18
5 Stay Wire 7/10 SWG @ 5.5 Kg/Stay 7130860077 Kg 11 59.23 651.48
6 Stay set 16 mm 7130860032 No 2 345.00 690.00
7 I-Bolt Big size 7130620013 No 4 116.46 465.84
8 Material Cost 133564.71
9 Dismantling Charges Ckt Km 1 4160.99 4160.99
10 Stringing Charges as per Labour Rate Schedule AL-1 Ckt Km 1 8321.97 8321.97
11 SUB TOTAL-1 146047.67
12 Incidental Charges @ 9% : - 0.09 13144.29
13 Transportation charges 2740.68
14 SUB TOTAL-2 161932.64
15 Overhead Charges @ 11% [Market Fluctuation, Service
0.11 16065.24
Tax, Contractor's profit etc.]
16 Cost per Km 177997.88
17 Total Cost (Round off) 177998.00
COST SCHEDULE C-3 (D)
2016-17
S. New SAP Bin
PARTICULARS Unit Qty Rate Amount
No. Code
1 Rabbit Conductor 7130830057 Km 3.03 28440.00 86173.20
2 11 kV Guarding Channel 100x50 mm set. 7130810511 No 1 2053.85 2053.85
3 G.I. Wire 8 SWG 7130870043 Kg 35 52.97 1853.92
4 Stay Clamp 7130810026 No 2 120.59 241.18
5 Stay Wire 7/10 SWG @ 5.5 Kg/Stay 7130860077 Kg 11 59.23 651.48
6 Stay set 16 mm 7130860032 No 2 345.00 690.00
7 I-Bolt Big size 7130620013 No. 4 116.46 465.84
8 Material Cost 92129.46
9 Dismantling Charges Ckt Km 1 3850.90 3850.90
Stringing Charges as per Labour Rate Schedule
10 Ckt Km 1 7701.80 7701.80
CL-1
11 SUB TOTAL-1 103682.16
12 Incidental Charges @ 9% : - 0.09 9331.39
13 Transportation charges 2740.68
14 SUB TOTAL-2 115754.24
Overhead Charges @ 11% [Market Fluctuation,
15 0.11 11405.04
Service Tax, Contractor's profit etc.]
16 Cost per Km 127159.27
17 Total Cost (Round off) 127159.00
COST SCHEDULE C-3 (E)
2016-17
COST PER KM OF 11 kV OVERHEAD XLPE CABLE LINE ON H - BEAM POLE WITH AVERAGE SPAN 30
MTRS.
Assumed as if cable length is 500 Mtr. in one stroke.
S. New SAP
PARTICULARS Unit Qty. Rate Amount
No. Bin Code
1 2 3 4 5 6 7
H-BEAM 152x152 mm 37.1 Kg /Mtr 11.0 Mtr long i.e. 408.1
1 7130601965 Kg 13467.3 32.58 438697.30
Kg/pole x 33 Nos = 13467.3 Kgs
2 11 kV XLPE 3 Core Cable 120 sqmm (incl. sag 6%) 7130310078 Mtr. 1060 761.41 807093.54
3 11 kV End Termination kit for XLPE Cable 150 sqmm 7130352040 Set 42 10187.00 427854.00
4 11 kV Straight thru' joint kit suitable for 120 sqmm Cable 7130310062 Set 4 3982.00 15928.00
5 Earth spike 7130870010 No. 6 681.00 4086.00
6 D.C.Cross Arm 5.2 Mtr. Channel 7130810684 Set 2 6989.71 13979.42
7 Dead-end Assembly (Suitable for all size cable) 7130877681 No. 2 2270.00 4540.00
Straight line Suspension Assembly (Suitable for all size
8 7130877683 No. 31 2018.00 62558.00
cable)
9 Eye Hook 7130893004 No. 33 161.00 5313.00
10 Stay set without stay wire 20 mm 7130860033 No. 12 629.00 7548.00
11 Stay wire 7/8 SWG 10 kg/stay 7130860076 Kg 120 58.65 7038.00
12 Stay clamp for H-Beam 7130810692 No. 24 249.66 5991.84
13 Clamp for H-Beam 7130810692 No. 33 249.66 8238.78
14 M.S.Angle 65x65x6 mm 7130600032 Kg 330 33.24 10967.88
15 Red Oxide Paint 7130211158 Ltr 3 133.00 399.00
S. New SAP
PARTICULARS Unit Qty. Rate Amount
No. Bin Code
1 2 3 4 5 6 7
16 Aluminium Paint 7130210809 Ltr 3 297.00 891.00
17 Earthing Coil 7130870013 No. 33 97.00 3201.00
18 Barbed Wire [@ 2 Kg/Pole] 7130610206 Kg 66 63.96 4221.56
19 Danger Board 7130880041 No. 33 62.00 2046.00
Concreting of Pole @ 0.65 Cmt per pole and 0.3 Cmt per
Cmt 25.05
20 stay
(i) Cement @ 208 Kg/Cmt 7130200401 Kg 5210 4.90 25530.96
M.S.Nuts and Bolts Kg 40
21 16x65 mm 7130620614 Kg 26 62.00 1612.00
16x200 mm 7130620631 Kg 14 61.00 854.00
22 SUB TOTAL-1 1858589.28
23 Incidental Charges @ 9% : - 0.09 167273.035
24 Labour charges 7% of material cost 178230.51
Transport charges upto 50 Kms average lead from Area
25 stores to construction camp including site transport 3% of material cost 61125.64
(Transport Sch. T-1)
26 Service in lieu of Concreting Cmt 21.45 3153.01 67632.07
27 Service in lieu of Earthing Coal & Salt etc No. 33 1942.20 64092.62
28 SUB TOTAL-2 2396943.15
Overhead Charges @ 11% [Market Fluctuation, Service
29 0.11 204444.82
Tax, Contractor's profit etc.]
30 Total Cost per Km including labour charges 2601387.97
31 Total Cost (Round off) 2601388.00
Earlier Bin Code -7130797532
PARTICULARS New SAP Unit H-Beam 152X152 mm 37.1 365 Kg 11 Mtr long PCC
S. No. Bin Code Kg/Mtr 11.0 Mtr Long Pole
Qty Rate Amount Qty Rate Amount
1 2 3 4 5 6 7 8 9 10
H-BEAM 152x152 mm 37.1 Kg /Mtr 11.0 Mtr long i.e. 408.1
1 7130601965 Kg 816.2 32.58 26587.72
Kg/pole x 2 Nos = 816.2 Kgs
2 365 Kg; 11 Mtr long PCC Pole No 2 4515.00 9030.00
3 DC Cross Arm of 100x50 mm channel (4'/1.2 Mtr. Centre) 7130810512 No 1 3256.41 3256.41 1 3256.41 3256.41
4 11 kV Polymer Disc Insulator 7130820010 No 6 142.00 852.00 6 142.00 852.00
5 11 kV Strain H.W. fitting 7130820241 No 6 116.00 696.00 6 116.00 696.00
6 11 kV Polymeric Pin insulator with Pin 7130820008 No 3 202.00 606.00 3 202.00 606.00
7 Horizontal & Cross Bracing 4' center with set of 4 back
Set
clamp
(i) M.S.Angle 65x65x6 mm 7130600032 Kg 52 33.24 1728.27 52 33.24 1728.27
Back Clamp for Pole
(i) Stay Clamp for "H" Beam 7130810692 No 4 249.66 998.64
(ii) Stay Clamp for PCC Pole 7130810193 No 4 225.04 900.16
8 (I) Stay set 16 mm 7130860032 No 6 345.00 2070.00 6 345.00 2070.00
(II) Stay Wire 7/10 SWG @ 8.5 Kg per stay 7130860077 Kg 51 59.23 3020.48 51 59.23 3020.48
(III) Stay Clamp
(i) Stay Clamp for "H" Beam 7130810692 No 6 249.66 1497.96
(ii) Stay Clamp for PCC Pole 7130810193 No 6 225.04 1350.24
Concreting of pole @ 0.6 Cmt Per Pole for H-Beam ; @
0.5 Cmt. Per pole for 365 kG PCC & @ 0.2 Cmt per stay Cmt 2.5 2.3
9 and @ 0.05 Cmt per pole for base padding
Cement @ 208 Kg/cmt 7130200401 Kg 520 4.90 2548.00 478 4.90 2344.16
PARTICULARS New SAP Unit H-Beam 152X152 mm 37.1 365 Kg 11 Mtr long PCC
S. No. Bin Code Kg/Mtr 11.0 Mtr Long Pole
Qty Rate Amount Qty Rate Amount
1 2 3 4 5 6 7 8 9 10
10 Earthing Set (Coil earth as per Drawing No.-G/007) 7130870013 No 2 97.00 194.00 2 97.00 194.00
PARTICULARS New SAP Unit H-Beam 152X152 mm 37.1 365 Kg 11 Mtr long PCC
S. No. Bin Code Kg/Mtr 11.0 Mtr Long Pole
Qty Rate Amount Qty Rate Amount
1 2 3 4 5 6 7 8 9 10
11 Red Oxide Paint 7130211158 Ltr 0.5 133.00 66.50 0.5 133.00 66.50
12 Aluminium Paint 7130210809 Ltr 0.5 297.00 148.50 0.5 297.00 148.50
13 Barbed Wire [@ 2 Kg/Pole] 7130610206 Kg 4 63.96 255.85 4 63.96 255.85
14 Danger Board 7130880041 Each 1 62.00 62.00 1 62.00 62.00
MS Nuts and Bolts Kg 6 6
15 16x40 mm 7130620609 Kg 0.5 63.00 31.50 0.5 63.00 31.50
16x200 mm 7130620631 Kg 5.5 61.00 335.50 5.5 61.00 335.50
16 SUB TOTAL-1 44955.32 26947.57
17 Incidental Charges @ 9% : - 0.09 4045.98 0.09 2425.28
18 Service in lieu of concreting metal & sand only Cmt 2.5 3153.01 7882.53 2.5 3153.01 7882.53
19 Labour charges as per Sch No.- CL-5 7421.49 7598.12
20 Transport charges upto 50 Kms average lead from Area
stores to construction camp inc. site transport (Transport 2729.76 2729.76
Sch. T-1)
21 SUB TOTAL-2 67035.08 47583.25
Overhead Charges @ 11% [Market Fluctuation, Service Tax,
22 0.11 4945.09 0.11 2964.23
Contractor's profit etc.]
23 Cost per DP for non-guaranteed works 71980.16 50547.49
24 Cost per DP for non-guaranteed works (Rounded off) 71980.00 50547.00
Note: All the rates are with considering price variation clause.
PARTICULARS New SAP Unit H-Beam 152X152 mm 37.1 365 Kg 11 Mtr long PCC
S. No. Bin Code Kg/Mtr 11.0 Mtr Long Pole
Qty Rate Amount Qty Rate Amount
1 2 3 4 5 6 7 8 9 10
2016-17
Note: - (1) Schedule C-2 is to be supplemented with every 1.0 Km. 11 kV line.
(2) All the rates are with considering price variation clause.
S. New SAP Bin Using RABBIT Conductor Using WEASEL Conductor
PARTICULARS Unit
No. Code Qnty Rate Amount Qnty Rate Amount
1 2 3 4 5 6 7 8 9 10
Note: All the rates are with considering price variation clause.
Earlier Qty. was 2 kG because @2 kg per pole
COST SCHEDULE C-7 (A-1)
2016-17
11/0.4 kV OUT DOOR SUB-STATION (USING PCC POLE FOR 25/63 kVA TRANSFORMER & DOUBLE WELDED R.S.
JOIST 175x85 mm FOR 100/200 kVA TRANSFORMER AND 3.5 CORE PVC INSULATED CABLE)
S. New SAP 25 kVA TRANSFORMER 63 kVA TRANSFORMER 100 kVA TRANSFORMER 200 kVA TRANSFORMER
PARTICULARS Unit
No. Bin Code Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Transformer 11/0.4 kV (Conventional)
(i) 25 kVA TRANSFORMER (4 STAR) 7132210008 Each 1 50174.00 50174.00
(ii) 63 kVA TRANSFORMER (4 STAR) 7132210009 Each 1 84020.00 84020.00
(iii) 100 kVA TRANSFORMER (4 STAR) 7132210010 Each 1 116682.00 116682.00
(iv) 200 kVA TRANSFORMER (4 STAR) 7132210011 Each 1 204592.00 204592.00
2 (i) 140 Kg 8.0 Mtr long PCC Pole 7130800012 No 3 1659.00 4977.00 3 1659.00 4977.00 -- -- -- -- -- --
(ii) 175x85 mm 11.0 Mtr long R.S. Joist
@19.495 Kg/mtr x 9 mtr = 175.45 kg/pole
7130600675 Kg 857.78 32.58 27942.18 857.78 32.58 27942.18
x 2 No = 428.9 Kgs, For 4 No pole =
857.8 Kg
3 DC Cross arm of 100x50 mm 8' Center 7130810517 No 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10
4 11 kV Polymer Disc Insulator 7130820010 No 3 142.00 426.00 3 142.00 426.00 3 142.00 426.00 3 142.00 426.00
11 kV H.W. 7130820241 No. 3 116.00 348.00 3 116.00 348.00 3 116.00 348.00 3 116.00 348.00
5 11 kV Polymeric Pin Insulator with Pin 7130820008 No 6 202.00 1212.00 6 202.00 1212.00 6 202.00 1212.00 6 202.00 1212.00
6 11 kV DO fuse & LA mounting DC Cross
7130810509 No 1 2745.63 2745.63 1 2745.63 2745.63 1 2745.63 2745.63 1 2745.63 2745.63
arm (75x40 mm)
7 11 kV DO Fuse unit 7131930412 Each 3 1199.00 3597.00 3 1199.00 3597.00 3 1199.00 3597.00 3 1199.00 3597.00
8 M.S. Angle 50x50x6 mm for X-mer
7130600023 Kg 20 33.24 664.72 20 33.24 664.72 20 33.24 664.72 20 33.24 664.72
Clamping set
9 (i) Stay Set 16 mm 7130860032 No 4 345.00 1380.00 4 345.00 1380.00 4 345.00 1380.00 4 345.00 1380.00
(ii) Stay Wire 7/10 SWG @ 5.5 Kg per
7130860077 Kg 22 59.23 1302.95 22 59.23 1302.95 22 59.23 1302.95 22 59.23 1302.95
stay
(iii) Stay Clamp 7130810026 No 4 120.59 482.36 4 120.59 482.36 4 120.59 482.36
10 Concreting of supports @ 0.3
Cmt/pole & @ 0.2 Cmt/Stay & base Cmt 1.85 1.85 1.9 1.9
padding @ 0.05 Cmt per pole
(i) Cement @ 208 Kg/cmt 7130200401 Kg 385 4.90 1885.52 385 4.90 1885.52 395.2 4.90 1936.48 395.2 4.90 1936.48
11 Transformer belting with 50x50x6 mm
7130600023 Kg 34 33.24 1130.02 34 33.24 1130.02 34 33.24 1130.02 34 33.24 1130.02
angle with 2 cross fixing channel.
12 Transformer mounting cross arm 100x50
7130850201 Set 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10
mm channel.
S. New SAP 25 kVA TRANSFORMER 63 kVA TRANSFORMER 100 kVA TRANSFORMER 200 kVA TRANSFORMER
PARTICULARS Unit
No. Bin Code Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
13 Danger Board 7130880041 Each 1 62.00 62.00 1 62.00 62.00 1 62.00 62.00 1 62.00 62.00
14 Earthing set (Pipe earth as per drg.
No.-G/008) (material + Services)
(i) G.I.Pipe 40 mm 7130641396 Mtr 9 179.00 1611.00 9 179.00 1611.00 9 179.00 1611.00 9 179.00 1611.00
(ii) G.I.Wire 8 SWG 7130870043 Kg 15 52.97 794.54 15 52.97 794.54 15 52.97 794.54 15 52.97 794.54
15 Barbed Wire [@ 2 Kg/Pole] 7130610206 Kg 6 63.96 383.78 6 63.96 383.78 8 63.96 511.70 8 63.96 511.70
16 Red Oxide Paint 7130211158 Ltr 1 133.00 133.00 1 133.00 133.00 3 133.00 399.00 3 133.00 399.00
17 Aluminium Paint 7130210809 Ltr 1 297.00 297.00 1 297.00 297.00 3 297.00 891.00 3 297.00 891.00
18 11 kV Polymer Lightning Arrestors 7130840029 Each 3 517.00 1551.00 3 517.00 1551.00 3 517.00 1551.00 3 517.00 1551.00
19 MS Nuts & Bolts Kg 14 14 14 14
16x40 mm 7130620609 Kg 1 63.00 63.00 1 63.00 63.00 1 63.00 63.00 1 63.00 63.00
16x65 mm 7130620614 Kg 4 62.00 248.00 4 62.00 248.00 4 62.00 248.00 4 62.00 248.00
16x140 mm 7130620625 Kg 4 61.00 244.00 4 61.00 244.00 4 61.00 244.00 4 61.00 244.00
16x200 mm 7130620631 Kg 5 61.00 305.00 5 61.00 305.00 5 61.00 305.00 5 61.00 305.00
20 TPN switch fuse unit (63 Amps) 7131920254 No 1 1628.00 1628.00 -- -- --
21 PVC insulated 4 Core cable
i 16 Sqmm (Armoured) 7130311084 Mtr 30 52.16 1564.68 -- --
ii 70 Sqmm 7130311054 Mtr -- -- -- 30 114.08 3422.46 30 114.08 3422.46 -- -- --
iii 150 Sqmm 7130311057 Mtr -- -- -- -- -- -- 10 394.64 3946.40 30 394.64 11839.20
iv 300 Sqmm 7130311061 Mtr -- -- -- -- -- -- -- -- -- 10 626.23 6262.28
22 LT distribution box suitable for
transformer with isolator on incoming side
& SPMCCB's on outgoing side
i 63 kVA 7131950065 Each 1 13758.00 13758.00 --
ii 100 kVA 7131950105 Each 1 17198.00 17198.00
iii 200 kVA 7131950200 Each 1 34396.00 34396.00
23 11 kV A.B. Switch 7131930221 Each -- -- 1 8675.00 8675.00 1 8675.00 8675.00
24 SUB TOTAL-1 86726.40 134560.18 207287.65 322645.91
25 Incidental Charges @ 9% : - 0.09 7805.38 0.09 12110.416 0.09 18655.888 0.09 29038.13
26 Back filling of poles with boulders @ 0.3
No 3 218.61 655.82 3 218.61 655.82 0 0 0 0 0 0
CMT per pole.
27 Service in lieu of concreting metal & sand
Cmt 1.85 3153.01 5833.07 1.85 3153.01 5833.07 1.85 3153.01 5833.07 1.85 3153.01 5833.07
only
28 Service in lieu of Earthing Coal & Sand
No 1 5826.63 5826.63 1 5826.63 5826.63 1.0 5826.63 5826.63 1 5826.63 5826.63
etc
29 Labour charges as per Sch CL-3 8460.67 8887.44 8887.44 11027.94
30 Transport charges upto 50 Kms average
lead from Area stores to construction
4137.54 4580.53 4580.53 4580.53
camp including site transport (Transport
Sch T-1)
31 SUB TOTAL-2 119445.50 172454.08 251071.20 378952.20
S. New SAP 25 kVA TRANSFORMER 63 kVA TRANSFORMER 100 kVA TRANSFORMER 200 kVA TRANSFORMER
PARTICULARS Unit
No. Bin Code Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
32 Overhead Charges @ 11% [Market
Fluctuation, Service Tax, Contractor's 0.11 9539.90 0.11 14801.62 0.11 22801.64 0.11 35491.05
profit etc.]
33 Cost per S/s for non-guaranteed works 128985.40 187255.70 273872.84 414443.25
34 Cost per S/s for non-guaranteed works
128985.00 187256.00 273873.00 414443.00
(Round off)
Note (A) :- (1) All the rates are with considering price variation clause.
(2) Single RS Joist 175x85 mm may be used in place of PCC pole for 25/63 kVA Transformer
192.62
COST SCHEDULE C-7 (A-2)
2016-17
11/0.4 kV OUT DOOR SUB-STATION (USING PCC POLE FOR 25/63 kVA TRANSFORMER & DOUBLE WELDED RS JOIST 175x85 mm FOR
100/200 kVA TRANSFORMER AND SINGLE CORE CABLE)
S. New SAP Bin 25 kVA TRANSFORMER 63 kVA TRANSFORMER 100 kVA TRANSFORMER 200 kVA TRANSFORMER
PARTICULARS Unit
No. Code Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Transformer 11/0.4 kV (Conventional)
(i) 25 kVA TRANSFORMER (4 STAR) 7132210008 Each 1 50174.00 50174.00
1 (ii) 63 kVA TRANSFORMER (4 STAR) 7132210009 Each 1 84020.00 84020.00
(iii) 100 kVA TRANSFORMER (4 STAR) 7132210010 Each 1 116682.00 116682.00
(iv) 200 kVA TRANSFORMER (4 STAR) 7132210011 Each 1 204592.00 204592.00
(i) 140 Kg 8.0 Mtr. long PCC Pole 7130800012 No 3 1659.00 4977.00 3 1659.00 4977.00 -- -- -- -- -- --
3 DC Cross arm of 100x50 mm 8' Center 7130810517 No 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10
4 11 kV Polymer Disc Insulator 7130820010 No 3 142.00 426.00 3 142.00 426.00 3 142.00 426.00 3 142.00 426.00
5 11 kV H.W 7130820241 No 3 116.00 348.00 3 116.00 348.00 3 116.00 348.00 3 116.00 348.00
6 11 kV Polymeric Pin Insulator with Pin 7130820008 No 6 202.00 1212.00 6 202.00 1212.00 6 202.00 1212.00 6 202.00 1212.00
11 kV DO fuse & LA mounting DC cross arm
7 7130810509 No 1 2745.63 2745.63 1 2745.63 2745.63 1 2745.63 2745.63 1 2745.63 2745.63
(75x40 mm)
8 11 kV DO Fuse unit 7131930412 Each 3 1199.00 3597.00 3 1199.00 3597.00 3 1199.00 3597.00 3 1199.00 3597.00
MS Angle 50x50x6 mm for X-mer Clamping
9 7130600023 Kg 20 33.24 664.72 20 33.24 664.72 20 33.24 664.72 20 33.24 664.72
set
(i) Stay Set 16 mm 7130860032 No 4 345.00 1380.00 4 345.00 1380.00 4 345.00 1380.00 4 345.00 1380.00
10 (ii) Stay Wire 7/10 SWG @ 5.5 Kg per stay 7130860077 Kg 22 59.23 1302.95 22 59.23 1302.95 22 59.23 1302.95 22 59.23 1302.95
(iii) Stay Clamp 7130810026 No 4 120.59 482.36 4 120.59 482.36 4 120.59 482.36
Concreting of supports @ 0.3 Cmt/pole & @
0.2 Cmt/Stay & base padding @ 0.05 Cmt Cmt 1.85 1.85 1.9 1.9
11 per pole
(i) Cement @ 208 Kg/cmt 7130200401 Kg 385 4.90 1886.50 385 4.90 1886.50 312 4.90 1528.80 312 4.90 1528.80
Transformer belting with 50x50x6 mm angle
12 7130600023 Kg 34 33.24 1130.02 34 33.24 1130.02 34 33.24 1130.02 34 33.24 1130.02
with 2 cross fixing channel.
Transformer mounting Cross arm 100x50
13 7130850201 Set 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10
mm channel.
14 Danger Board 7130880041 Each 1 62.00 62.00 1 62.00 62.00 1 62.00 62.00 1 62.00 62.00
Earthing set (Pipe earth as per drg. No.-
G/008) (material + Services)
15
(i) G.I.Pipe 40 mm 7130641396 Mtr 9 179.00 1611.00 9 179.00 1611.00 9 179.00 1611.00 9 179.00 1611.00
S. New SAP Bin 25 kVA TRANSFORMER 63 kVA TRANSFORMER 100 kVA TRANSFORMER 200 kVA TRANSFORMER
PARTICULARS Unit
No.
15 Code Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
(ii) G.I.Wire 8 SWG 7130870043 Kg 15 52.97 794.54 15 52.97 794.54 15 52.97 794.54 15 52.97 794.54
16 Barbed Wire [@ 2 Kg/Pole] 7130610206 Kg 6 63.96 383.78 6 63.96 383.78 8 63.96 511.70 8 63.96 511.70
17 Red Oxide Paint 7130211158 Ltr 1 133.00 133.00 1 133.00 133.00 3 133.00 399.00 3 133.00 399.00
18 Aluminium Paint 7130210809 Ltr 1 297.00 297.00 1 297.00 297.00 3 297.00 891.00 3 297.00 891.00
19 11 kV Polymer Lightning Arrestors 7130840029 Each 3 517.00 1551.00 3 517.00 1551.00 3 517.00 1551.00 3 517.00 1551.00
MS Nuts & Bolts Kg 14 14 14 14
16x40 mm 7130620609 Kg 1 63.00 63.00 1 63.00 63.00 1 63.00 63.00 1 63.00 63.00
20 16x65 mm 7130620614 Kg 4 62.00 248.00 4 62.00 248.00 4 62.00 248.00 4 62.00 248.00
16x140 mm 7130620625 Kg 4 61.00 244.00 4 61.00 244.00 4 61.00 244.00 4 61.00 244.00
16x200 mm 7130620631 Kg 5 61.00 305.00 5 61.00 305.00 5 61.00 305.00 5 61.00 305.00
21 TPN switch fuse unit (63 Amps) 7131920254 No 1 1628.00 1628.00 -- -- --
22 Single Core cable
i 16 Sqmm 7130311008 Mtr 120 14.82 1778.28 -- --
ii 35 Sqmm 7130310021 Mtr 80 24.98 1998.08
iii 50 Sqmm 7130311009 Mtr 40 34.52 1380.68 120 34.52 4142.04
iv 70 Sqmm 7130311010 Mtr -- 40 46.36 1854.56 120 46.36 5563.68
v 150 Sqmm 7130311011 Mtr -- 40 87.50 3500.08
LT distribution box suitable for transformer
23 with isolator on incoming side & SPMCCB's
on outgoing side
i 63 kVA 7131950065 Each 1 13758.00 13758.00 --
ii 100 kVA 7131950105 Each 1 17198.00 17198.00
iii 200 kVA 7131950200 Each 1 34396.00 34396.00
24 11 kV A.B. Switch 7131930221 Each -- -- 1 8675.00 8675.00 1 8675.00 8675.00
25 SUB TOTAL-1 86940.98 134517.46 205507.71 313200.51
26 Incidental Charges @ 9% : - 0.09 7824.69 0.09 12106.57 0.09 18495.69 0.09 28188.05
Back filling of poles with boulders @ 0.3
27 No 3 218.61 655.82 3 218.61 655.82 0 0 0 0 0 0
CMT per pole.
Service in lieu of concreting metal & sand
28 Cmt 1.85 3153.01 5833.07 1.85 3153.01 5833.07 1.85 3153.01 5833.07 1.85 3153.01 5833.07
only
29 Service in lieu of Earthing Coal & Sand etc No 1 5826.63 5826.63 1 5826.63 5826.63 1.0 5826.63 5826.63 1 5826.63 5826.63
Note (A) :- (1) All the rates are with considering price variation clause.
(2) Single RS Joist175x85 mm may be used in place of PCC pole for 25/63 kVA Transformer
Note (B) :- A Capacitor is to be installed of appropriate capacity on the transformer in case of estimate prepared for
Irrigation Pump.
S. New SAP Bin 25 kVA TRANSFORMER 63 kVA TRANSFORMER 100 kVA TRANSFORMER 200 kVA TRANSFORMER
PARTICULARS Unit
No. Code Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
11/0.4 kV OUT DOOR SUB-STATION (USING H-BEAM POLE FOR 25 / 63 / 100 / 200 kVA TRANSFORMER AND 3.5 CORE PVC CABLE)
2016-17
S. New SAP 25 kVA TRANSFORMER 63 kVA TRANSFORMER 100 kVA TRANSFORMER 200 kVA TRANSFORMER
PARTICULARS Unit
No. Bin Code Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Transformer 11/0.4 kV (Conventional)
(i) 25 kVA TRANSFORMER (4 STAR) 7132210008 Each 1 50174.00 50174.00
1 (ii) 63 kVA TRANSFORMER (4 STAR) 7132210009 Each 1 84020.00 84020.00
(iii) 100 kVA TRANSFORMER (4 STAR) 7132210010 Each 1 116682.00 116682.00
(iv) 200 kVA TRANSFORMER (4 STAR) 7132210011 Each 1 204592.00 204592.00
H-BEAM 152x152 mm 37.1 Kg /Mtr 11.0 Mtr
2 7130601965 Kg 816.2 32.58 26587.72 816.2 32.58 26587.72 816.2 32.58 26587.72 816.2 32.58 26587.72
long i.e. 408.1 Kg/pole x 2 Nos = 816.2 Kgs
3 DC Cross arm of 100x50 mm 8' Center 7130810517 No 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10
11 kV Polymer Disc Insulator 7130820010 No 3 142.00 426.00 3 142.00 426.00 3 142.00 426.00 3 142.00 426.00
4
11 kV H.W 7130820241 No. 3 116.00 348.00 3 116.00 348.00 3 116.00 348.00 3 116.00 348.00
5 11 kV Polymeric Pin Insulator with Pin 7130820008 No 6 202.00 1212.00 6 202.00 1212.00 6 202.00 1212.00 6 202.00 1212.00
11 kV DO fuse & LA mounting DC Cross arm
6 7130810509 No 1 2745.63 2745.63 1 2745.63 2745.63 1 2745.63 2745.63 1 2745.63 2745.63
(75x40 mm)
7 11 kV D.O. Fuse unit 7131930412 Each 3 1199.00 3597.00 3 1199.00 3597.00 3 1199.00 3597.00 3 1199.00 3597.00
8 MS Angle 50x50x6 mm for X-mer Clamping set 7130600023 Kg 20 33.24 664.72 20 33.24 664.72 20 33.24 664.72 20 33.24 664.72
(i) Stay Set 16 mm 7130860032 No 4 345.00 1380.00 4 345.00 1380.00 4 345.00 1380.00 4 345.00 1380.00
9 (ii) Stay Wire 7/10 SWG @ 5.5 Kg per stay 7130860077 Kg 22 59.23 1302.95 22 59.23 1302.95 22 59.23 1302.95 22 59.23 1302.95
(iii) Stay Clamp for "H" Beam 7130810692 No 4 249.66 998.64 4 249.66 998.64 4 249.66 998.64 4 249.66 998.64
Concreting of supports @ 0.6 Cmt/pole & @
0.2 Cmt/Stay & base padding @ 0.05 Cmt per Cmt 2.1 2.1 2.1 2.1
10 pole
(i) Cement @ 208 Kg/Cmt 7130200401 Kg 437 4.90 2141.30 437 4.90 2141.30 437 4.90 2141.30 437 4.90 2141.30
Transformer belting with 50x50x6 mm angle
11 7130600023 Kg 34 33.24 1130.02 34 33.24 1130.02 34 33.24 1130.02 34 33.24 1130.02
with 2 cross fixing channel.
Transformer mounting cross arm 100x50 mm
12 7130850201 Set 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10
channel.
13 Danger Board 7130880041 Each 1 62.00 62.00 1 62.00 62.00 1 62.00 62.00 1 62.00 62.00
Earthing set (Pipe earth as per drg. no.-G/008)
(material + Services)
14
(i) G.I.Pipe 40 mm 7130641396 Mtr 9 179.00 1611.00 9 179.00 1611.00 9 179.00 1611.00 9 179.00 1611.00
(ii) G.I.Wire 8 SWG 7130870043 Kg 15 52.97 794.54 15 52.97 794.54 15 52.97 794.54 15 52.97 794.54
15 Barbed Wire [@ 2 Kg/Pole] 7130610206 Kg 4 63.96 255.85 4 63.96 255.85 4 63.96 255.85 4 63.96 255.85
16 Red Oxide Paint 7130211158 Ltr 1 133.00 133.00 1 133.00 133.00 3 133.00 399.00 3 133.00 399.00
17 Aluminium Paint 7130210809 Ltr 1 297.00 297.00 1 297.00 297.00 3 297.00 891.00 3 297.00 891.00
18 11 kV Polymer Lightning Arrestor 7130840029 Each 3 517.00 1551.00 3 517.00 1551.00 3 517.00 1551.00 3 517.00 1551.00
S. New SAP 25 kVA TRANSFORMER 63 kVA TRANSFORMER 100 kVA TRANSFORMER 200 kVA TRANSFORMER
PARTICULARS Unit
No. Bin Code Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
MS Nuts & Bolts Kg 14 14 14 14
16x40 mm 7130620609 kg 1 63.00 63.00 1 63.00 63.00 1 63.00 63.00 1 63.00 63.00
19 16x65 mm 7130620614 kg 4 62.00 248.00 4 62.00 248.00 4 62.00 248.00 4 62.00 248.00
16x140 mm 7130620625 kg 4 61.00 244.00 4 61.00 244.00 4 61.00 244.00 4 61.00 244.00
16x200 mm 7130620631 kg 5 61.00 305.00 5 61.00 305.00 5 61.00 305.00 5 61.00 305.00
20 TPN switch fuse unit (63 Amps) 7131920254 No 1 1628.00 1628.00 -- -- --
21 PVC insulated 4 Core cable
i 16 Sqmm (Armoured) 7130311084 Mtr 30 52.16 1564.68 -- --
ii 70 Sqmm 7130311054 Mtr -- 30 114.08 3422.46 30 114.08 3422.46 --
iii 150 Sqmm 7130311057 Mtr -- 10 394.64 3946.40 30 394.64 11839.20
iv 300 Sqmm 7130311061 Mtr 10 626.23 6262.28
LT Distribution box suitable for transformer with
22 isolator on incoming side & SPMCCB's on
outgoing side
i 63 kVA 7131950065 Each 1 13758.00 13758.00 --
ii 100 kVA 7131950105 Each 1 17198.00 17198.00
iii 200 kVA 7131950200 Each 1 34396.00 34396.00
23 11 kV A.B. Switch 7131930221 Each -- -- 1 8675.00 8675.00 1 8675.00 8675.00
24 SUB TOTAL-1 108981.25 156815.03 206398.43 322239.05
25 Incidental Charges @ 9% : - 0.09 9808.31 0.09 14113.35 0.09 18575.86 0.09 29001.51
26 Service in lieu of concreting metal & sand only Cmt 2.1 3153.01 6621.32 2.1 3153.01 6621.32 2.1 3153.01 6621.32 2.1 3153.01 6621.32
27 Service in lieu of Earthing Coal & Sand etc No 1 5826.63 5826.63 1 5826.63 5826.63 1.0 5826.63 5826.63 1 5826.63 5826.63
28 Labour charges as per Sch. CL-3 8460.67 8887.44 8887.44 11027.94
Transport charges upto 50 Kms average lead
29 from Area stores to construction camp inc. site 4137.54 4580.53 4580.53 4580.53
transport (Transport Sch T-1)
30 SUB TOTAL-2 143835.71 196844.30 250890.20 379296.98
32 Cost per S/s for non-guaranteed works 155823.65 214093.95 273594.03 414743.27
Cost per S/s for non-guaranteed works
33 155824.00 214094.00 273594.00 414743.00
(Round off)
Note (A) :- (1) All the rates are with considering price variation clause.
(2) As per requirement 315 kVA Transformer may be used against 200 kVA schedule
RELOCATION OF 25 / 63 / 100 kVA 11/0.4 kV X-MER S/S USING H- BEAM POLE AND 3.5 CORE PVC CABLE [BASED ON COST
SCHEDULE C-7 (B-1) EXCEPT TRANSFORMER COST ]
2016-17
S. PARTICULARS New SAP Unit 25 kVA TRANSFORMER 63 kVA TRANSFORMER 100 kVA TRANSFORMER 200 kVA TRANSFORMER
No. Bin Code Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 H-BEAM 152x152 mm; 37.1 Kg /Mtr;
11.0 Mtr long i.e. 408.1 Kg/pole x 2 7130601965 Kg 816.2 32.58 26587.72 816.2 32.58 26587.72 816.2 32.58 26587.72 816.2 32.58 26587.72
Nos = 816.2 Kgs
2 DC Cross arm of 100x50 mm 8' Center
7130810517 No 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10
3 11 kV Polymer Disc Insulator 7130820010 No 3 142.00 426.00 3 142.00 426.00 3 142.00 426.00 3 142.00 426.00
4 11 kV H.W 7130820241 No. 3 116.00 348.00 3 116.00 348.00 3 116.00 348.00 3 116.00 348.00
5 11 kV Polymeric Pin Insulator with Pin
7130820008 No 6 202.00 1212.00 6 202.00 1212.00 6 202.00 1212.00 6 202.00 1212.00
(i) G.I. Pipe 40 mm 7130641396 Mtr 9 179.00 1611.00 9 179.00 1611.00 9 179.00 1611.00 9 179.00 1611.00
(ii) G.I. Wire 8 SWG 7130870043 Kg 15 52.97 794.54 15 52.97 794.54 15 52.97 794.54 15 52.97 794.54
15 Barbed Wire [@ 2 Kg/Pole] 7130610206 Kg 4 63.96 255.85 4 63.96 255.85 4 63.96 255.85 4 63.96 255.85
16 Red Oxide paint 7130211158 Ltr 1 133.00 133.00 1 133.00 133.00 3 133.00 399.00 3 133.00 399.00
S. PARTICULARS New SAP Unit 25 kVA TRANSFORMER 63 kVA TRANSFORMER 100 kVA TRANSFORMER 200 kVA TRANSFORMER
No. Bin Code Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
17 Aluminium Paint 7130210809 Ltr 1 297.00 297.00 1 297.00 297.00 3 297.00 891.00 3 297.00 891.00
18 11 kV Polymer Lightning Arrestor 7130840029 Each 3 517.00 1551.00 3 517.00 1551.00 3 517.00 1551.00 3 517.00 1551.00
19 MS Nuts & Bolts Kg 14 14 14 14
16x40 mm 7130620609 kg 1 63.00 63.00 1 63.00 63.00 1 63.00 63.00 1 63.00 63.00
16x65 mm 7130620614 kg 4 62.00 248.00 4 62.00 248.00 4 62.00 248.00 4 62.00 248.00
16x140 mm 7130620625 kg 4 61.00 244.00 4 61.00 244.00 4 61.00 244.00 4 61.00 244.00
16x200 mm 7130620631 kg 5 61.00 305.00 5 61.00 305.00 5 61.00 305.00 5 61.00 305.00
20 TPN switch fuse unit (63 Amps) 7131920254 No 1 1628.00 1628.00 -- -- --
21 PVC insulated 4 Core cable
i 16 Sqmm (Armoured) 7130311084 Mtr 30 52.16 1564.68 --
ii 70 Sqmm 7130311054 Mtr -- 30 114.08 3422.46 30 114.08 3422.46
iii 150 Sqmm 7130311057 Mtr -- 10 394.64 3946.40 30 394.64 11839.20
iv 300 Sqmm 7130311061 Mtr 10 626.23 6262.28
22 LT distribution box suitable for
transformer with isolator on incoming
side & SPMCCB's on outgoing side
i 63 kVA 7131950065 Each 1 13758.00 13758.00 -- --
ii 100 kVA 7131950105 Each 1 17198.00 17198.00
iii 200 kVA 7131950200 Each 1 34396.00 34396.00
23 11 kV A.B. Switch 7131930221 Each -- -- 1 8675.00 8675.00 1 8675.00 8675.00
24 SUB TOTAL-1 58807.25 72795.03 89716.43 117647.05
25 Incidental Charges @ 9% : - 0.09 5292.65 0.09 6551.55 0.09 8074.48 0.09 10588.23
26 Service in lieu of concreting metal &
Cmt 2.1 3153.01 6621.32 2.1 3153.01 6621.32 2.1 3153.01 6621.32 2.1 3153.01 6621.32
sand only
27 Service in lieu of Earthing Coal & Sand
No 1 5826.63 5826.63 1 5826.63 5826.63 1.0 5826.63 5826.63 1.0 5826.63 5826.63
etc
28 Labour charges as per Sch. CL-3 8460.67 8887.44 8887.44 11027.94
29 Transport charges upto 50 Kms
average lead from Area stores to
construction camp incl. site transport 4137.54 4580.53 4580.53 4580.53
(Transport Sch T-1)
30 SUB TOTAL-2 89146.05 105262.50 123706.82 156291.70
31 Overhead Charges @ 11% [Market
Fluctuation, Service Tax, Contractor's 0.11 6468.80 0.11 8007.45 0.11 9868.81 0.11 12941.18
profit etc.]
32
Cost per S/s for non-guaranteed works 95614.85 113269.95 133575.63 169232.87
S. New SAP 25 kVA TRANSFORMER 63 kVA TRANSFORMER 100 kVA TRANSFORMER 200 kVA TRANSFORMER 315 kVA TRANSFORMER
PARTICULARS Unit
No. Bin Code Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 LT Distribution Box
25 kVA No 0 0.00 0.00
63 kVA 7131950065 No 1 13758.00 13758.00
100 kVA 7131950105 No 1 17198.00 17198.00
200 kVA 7131950200 No 1 34396.00 34396.00
315 kVA 7131950207 No 1 45861.00 45861.00
2 PVC Insulated 4 core cable
25 kVA (70 sq mm) 7130311054 Mtr 30 114.08 3422.46
63 kVA (70 sq mm) 7130311054 Mtr 30 114.08 3422.46
100 kVA (70 sq mm) 7130311054 Mtr 30 114.08 3422.46
100 kVA (150 sq mm) 7130311057 Mtr 10 394.64 3946.40
200 kVA (150 sq mm) 7130311057 Mtr 30 394.64 11839.20
200 kVA (300 sq mm) 7130311061 Mtr 10 626.23 6262.28
315 kVA (150 sq mm) 7130311057 Mtr 30 394.64 11839.20
315 kVA (300 sq mm) 7130311061 Mtr 10 626.23 6262.28
3 Earthing set (Pipe earth as
per drg no. G/008) (Material +
services)
(i) GI Pipe 40 mm 7130641396 Mtr 9 179.00 1611.00 9 179.00 1611.00 9 179.00 1611.00 9 179.00 1611.00 9 179.00 1611.00
(ii) GI Wire 8 SWG 7130870043 Kg 15 52.97 794.54 15 52.97 794.54 15 52.97 794.54 15 52.97 794.54 15 52.97 794.54
4 SUB TOTAL-1 5828.00 19586.00 26972.40 54903.02 66368.02
5 Incidental Charges @ 9% : - 0.09 524.52 0.09 1762.74 0.09 2427.52 0.09 4941.27 0.09 5973.12
6 Service in lieu of earthing
Nos 1 5826.63 5826.63 1 5826.63 5826.63 1 5826.63 5826.63 1 5826.63 5826.63 1 5826.63 5826.63
coal & sand
7 Labour charges as per Sch.
3510.17 4141.29 5277.15 6246.08 6246.08
CL-7 (B-1)B
8 Transportation charges LS 4137.53 4580.53 4580.53 4580.53 4580.53
9 SUB TOTAL-2 19826.85 35897.18 45084.22 76497.52 88994.37
Overhead Charges @ 11%
10 [Market Fluctuation, Service 0.11 641.08 0.11 2154.46 0.11 2966.96 0.11 6039.33 0.11 7300.48
Tax, Contractor's profit etc.]
11 Grand Total 20467.93 38051.64 48051.18 82536.85 96294.85
12 Grand Total (Round off) 20468.00 38052.00 48051.00 82537.00 96295.00
COST SCHEDULE C-7 (B-2)
11/0.4 kV OUT DOOR SUB-STATION (USING H-BEAM POLE FOR 25 / 63 / 100 / 200 kVA TRANSFORMER AND SINGLE CORE CABLE)
2016-17
S. New SAP Bin 25 kVA TRANSFORMER 63 kVA TRANSFORMER 100 kVA TRANSFORMER 200 kVA TRANSFORMER
PARTICULARS Unit
No. Code Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Transformer 11/0.4 kV (Conventional)
(i) 25 kVA TRANSFORMER (4 STAR) 7132210008 Each 1 50174.00 50174.00
1 (ii) 63 kVA TRANSFORMER (4 STAR) 7132210009 Each 1 84020.00 84020.00
(iii) 100 kVA TRANSFORMER (4 STAR) 7132210010 Each 1 116682.00 116682.00
(iv) 200 kVA TRANSFORMER (4 STAR) 7132210011 Each 1 204592.00 204592.00
H-BEAM 152x152 mm 37.1 Kg /Mtr 11.0
2 Mtr long i.e. 408.1 Kg/pole x 2 Nos = 816.2 7130601965 Kg 816.2 32.58 26587.72 816.2 32.58 26587.72 816.2 32.58 26587.72 816.2 32.58 26587.72
Kgs
3 DC Cross arm of 100x50 mm 8' Center 7130810517 No 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10
11 kV Polymer Disc Insulator 7130820010 No 3 142.00 426.00 3 142.00 426.00 3 142.00 426.00 3 142.00 426.00
4
11 kV H.W 7130820241 No. 3 116.00 348.00 3 116.00 348.00 3 116.00 348.00 3 116.00 348.00
5 11 kV Polymeric Pin Insulator with Pin 7130820008 No 6 202.00 1212.00 6 202.00 1212.00 6 202.00 1212.00 6 202.00 1212.00
11 kV DO fuse & LA mounting DC Cross
6 7130810509 No 1 2745.63 2745.63 1 2745.63 2745.63 1 2745.63 2745.63 1 2745.63 2745.63
arm (75x40 mm)
7 11 kV DO Fuse unit 7131930412 Each 3 1199.00 3597.00 3 1199.00 3597.00 3 1199.00 3597.00 3 1199.00 3597.00
MS Angle 50x50x6 mm for X-mer Clamping
8 7130600023 kg 20 33.24 664.72 20 33.24 664.72 20 33.24 664.72 20 33.24 664.72
set
(i) Stay Set 16 mm 7130860032 No 4 345.00 1380.00 4 345.00 1380.00 4 345.00 1380.00 4 345.00 1380.00
9 (ii) Stay Wire 7/10 SWG @ 5.5 Kg per stay 7130860077 Kg 22 59.23 1302.95 22 59.23 1302.95 22 59.23 1302.95 22 59.23 1302.95
(iii) Stay Clamp for "H" Beam 7130810692 No 4 249.66 998.64 4 249.66 998.64 4 249.66 998.64 4 249.66 998.64
Concreting of supports @ 0.6 Cmt/pole &
@ 0.2 Cmt/Stay & base padding @ 0.05 Cmt 2.1 2.1 2.1 2.1
10 Cmt per pole
(i) Cement @ 208 Kg/Cmt 7130200401 Kg 437 4.90 2141.30 437 4.90 2141.30 437 4.90 2141.30 437 4.90 2141.30
Transformer belting with 50x50x6 mm angle
11 7130600023 Kg 34 33.24 1130.02 34 33.24 1130.02 34 33.24 1130.02 34 33.24 1130.02
with 2 cross fixing channel.
Transformer mounting Cross arm 100x50
12 7130850201 Set 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10 1 3758.10 3758.10
mm channel.
13 Danger Board 7130880041 Each 1 62.00 62.00 1 62.00 62.00 1 62.00 62.00 1 62.00 62.00
Earthing set (Pipe earth as per drg. No.-
G/008) (material + Services)
14
(i) G.I.Pipe 40 mm 7130641396 Mtr 9 179.00 1611.00 9 179.00 1611.00 9 179.00 1611.00 9 179.00 1611.00
S. New SAP Bin 25 kVA TRANSFORMER 63 kVA TRANSFORMER 100 kVA TRANSFORMER 200 kVA TRANSFORMER
14 PARTICULARS Unit
No. Code Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount
(ii) G.I.Wire 8 SWG 7130870043 Kg 15 52.97 794.54 15 52.97 794.54 15 52.97 794.54 15 52.97 794.54
15 Barbed Wire [@ 2 Kg/Pole] 7130610206 Kg 4 63.96 255.85 4 63.96 255.85 4 63.96 255.85 4 63.96 255.85
16 Red Oxide Paint 7130211158 Ltr 1 133.00 133.00 1 133.00 133.00 3 133.00 399.00 3 133.00 399.00
17 Aluminium Paint 7130210809 Ltr 1 297.00 297.00 1 297.00 297.00 3 297.00 891.00 3 297.00 891.00
18 11 kV Polymer Lightning Arrestor 7130840029 Each 3 517.00 1551.00 3 517.00 1551.00 3 517.00 1551.00 3 517.00 1551.00
MS Nuts & Bolts Kg 14 14 14 14
16x40 mm 7130620609 Kg 1 63.00 63.00 1 63.00 63.00 1 63.00 63.00 1 63.00 63.00
19 16x65 mm 7130620614 Kg 4 62.00 248.00 4 62.00 248.00 4 62.00 248.00 4 62.00 248.00
16x140 mm 7130620625 Kg 4 61.00 244.00 4 61.00 244.00 4 61.00 244.00 4 61.00 244.00
16x200 mm 7130620631 Kg 5 61.00 305.00 5 61.00 305.00 5 61.00 305.00 5 61.00 305.00
20 TPN switch fuse unit (63 Amps) 7131920254 No 1 1628.00 1628.00 -- -- --
21 Single Core cable
i 16 Sqmm 7130311008 Mtr 120 14.82 1778.28 -- --
ii 35 Sqmm 7130310021 Mtr -- 80 24.98 1998.08
iii 50 Sqmm 7130311009 Mtr -- 40 34.52 1380.68 120 34.52 4142.04
iv 70 Sqmm 7130311010 Mtr 40 46.36 1854.56 120 46.36 5563.68
v 150 Sqmm 7130311011 Mtr 40 87.50 3500.08
LT distribution box suitable for transformer
22 with isolator on incoming side & SPMCCB's
on outgoing side
i 63 kVA 7131950065 Each 1 13758.00 13758.00 --
ii 100 kVA 7131950105 Each 1 17198.00 17198.00
iii 200 kVA 7131950200 Each 1 34396.00 34396.00
23 11 kV A.B. Switch 7131930221 Each -- -- 1 8675.00 8675.00 1 8675.00 8675.00
24 SUB TOTAL-1 109194.85 156771.33 205026.17 313201.33
25 Incidental Charges @ 9% : - 0.09 9827.54 0.09 14109.42 0.09 18452.35 0.09 28188.12
Service in lieu of concreting metal & sand
26 Cmt 2.1 3153.01 6621.32 2.1 3153.01 6621.32 2.1 3153.01 6621.32 2.1 3153.01 6621.32
only
27 Service in lieu of Earthing Coal & Sand etc. No 1 5826.63 5826.63 1 5826.63 5826.63 1.0 5826.63 5826.63 1 5826.63 5826.63
Note (A) :- (1) All the rates are with considering price variation clause.
(2) As per requirement 315 kVA Transformer may be used against 200 kVA schedule
Note (B) :- A Capacitor is to be installed of appropriate capacity on the transformer in case of estimate
prepared for Irrigation Pump.
S. New SAP Bin 25 kVA TRANSFORMER 63 kVA TRANSFORMER 100 kVA TRANSFORMER 200 kVA TRANSFORMER
PARTICULARS Unit
No. Code Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount Qty. Rate Amount
1 Km OF 11 kV LINE ON 365 kG 11 Mtr. LONG PCC POLE USING RACCOON / DOG CONDUCTOR
MAXIMUM SPAN 80 METER.
2016-17
Note: All the rates are with considering price variation clause.
PCC Pole using
PCC Pole using
S. New SAP Bin Raccoon
PARTICULARS Unit Rate Dog Conductor
No. Code Conductor
Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9
1 KM OF 11 kV LINE ON H-BEAM 152x152 MM 37.1 Kg /MTR. 13.0 MTR. USING RACCOON / DOG
CONDUCTOR MAXIMUM SPAN 80 MTR.
2016-17
H-Beam using
H-Beam using Dog
S. New SAP Bin Raccoon
PARTICULARS Unit Rate conductor
No. Code conductor
Qty. Amount Qty. Amount
1 2 3 4 5 6 7 8 9
H-BEAM 152x152 mm 37.1 Kg /Mtr 13.0 Mtr long i.e.
1 7130601958 Kg 32.58 5788 188544.10 5788 188544.10
482.3 Kg/pole x 12 Nos = 5788 Kgs
2 11 kV 'V' Cross arm with back clamp 7130810495 No 866.17 12 10394.04 12 10394.04
3 Back Clamp for Cross Arm 7130810361 No 239.47 12 2873.64 12 2873.64
4 11 kV Top clamp 7130810679 No 242.99 12 2915.88 12 2915.88
5 Earthing Set (Coil earth as per Drawing No.-G/007) 7130870013 No 97.00 12 1164.00 12 1164.00
6 11 kV Polymeric Pin insulator with Pin 7130820008 No 202.00 36 7272.00 36 7272.00
7 ACSR Raccoon conductor with 3% sag 7130830060 Mtr 42.12 3100 130556.50
8 ACSR Dog conductor with 3% sag 7130830063 Mtr 54.89 3100 170143.50
Jointing Sleeves suitable for Raccoon / Dog ACSR
9 7130830051 No 118.00 6 708.00 6 708.00
Conductor
(i) Stay set 20 mm 7130860033 No 629.00 4 2516.00 4 2516.00
(ii) Stay Wire 7/8 SWG @ 8.5 Kg per stay 7130860076 Kg 58.65 34 1994.10 34 1994.10
10
(iii) Stay Clamp
(I) Stay Clamp for "H" Beam 7130810692 No 249.66 4 998.64 4 998.64
Concreting of support @ 0.6 Cmt/pole, @ 0.2 Cmt/stay
Cmt 9.0 9.0
11 & base padding @ 0.05 Cmt /pole
Cement @ 208 Kg/Cmt 7130200401 Kg 4.90 1872 9172.80 1872 9172.80
12 Red Oxide paint 7130211158 Ltr 133.00 2 266.00 2 266.00
H-Beam using
H-Beam using Dog
S. New SAP Bin Raccoon
PARTICULARS Unit Rate conductor
No. Code conductor
Qty. Amount Qty. Amount
1 2 3 4 5 6 7 8 9
13 Aluminium Paint 7130210809 Ltr 297.00 2 594.00 2 594.00
14 Barbed Wire [@ 2 Kg/Pole] 7130610206 Kg 63.96 24 1535.11 24 1535.11
15 Danger Board 7130880041 Each 62.00 12 744.00 12 744.00
16 Binding wire and tape 7130830006 Kg 130.00 6 780.00 6 780.00
MS Nuts and Bolts Kg 24 24
16x40 mm 7130620609 Kg 63.00 1 63.00 1 63.00
17
16x65 mm 7130620614 Kg 62.00 12 744.00 12 744.00
16x140 mm 7130620625 Kg 61.00 11 671.00 11 671.00
18 SUB TOTAL-1 364506.81 404093.81
19 Incidental Charges @ 9% : - 0.09 32805.61 36368.44
20 Service in lieu of concreting metal & sand only Cmt 3153.01 9.0 28377.09 9.0 28377.09
21 Labour charges as per Sch No. CL-4 41477.57 42757.87
Transport charges upto 50 Kms average lead from Area
22 stores to construction camp including site transport 7191.70 7191.70 7191.70
(Transport Sch T-1)
23 SUB TOTAL-2 474358.79 518788.92
Overhead Charges @ 11% [Market Fluctuation, Service
24 0.11 40095.75 44450.32
Tax, Contractor's profit etc.]
25 Cost per Km for non-guaranteed works 514454.54 563239.24
Cost per Km for non-guaranteed works (Rounded
26 514455.00 563239.00
off)
Note: All the rates are with considering price variation clause.
Earlier Qty. was 1 kG because @2 kg per pole
COST SCHEDULE C-9 (A)
2016-17
H BEAM 152X152 MM 37.10
S. New SAP
PARTICULARS Unit KG / MTR 13.0 MTR LONG
No. Bin Code
Qnty Rate Amount
1 2 3 4 5 6 7
1 H-BEAM 152x152 mm; 37.1 Kg /Mtr 13.0 Mtr long i.e.
7130601958 kg 482.3 32.58 15710.92
482.3 Kg/pole
2 11 kV "V" cross arm 65x65x6 mm angle type with back
7130810495 No 1 866.17 866.17
cleat
3 Cross Arm Clamp
(i) Stay Clamp For "H" Beam 7130810692 No 1 249.66 249.66
4 11 kV Top Clamp Angle type with cleat 7130810679 No 1 242.99 242.99
5 Earthing Set (Coil earth as per Drawing No:-G/007 7130870013 No 1 97.00 97.00
6 11 kV Polymeric Pin Insulator with Pin 7130820008 No 3 202.00 606.00
7 Concreting of supports H-Beam @ 0.6 Cmt. Per Pole &
@ 0.2 Cmt. Per Stay and 0.05 Cmt per pole for base Cmt. 0.65
padding
Cement @ 208 Kg/Cmt 7130200401 Kg 135.2 4.90 662.48
8 Barbed Wire [@ 2 Kg/Pole] 7130610206 Kg 2 63.96 127.93
9 Danger Board 7130880041 Each 1 62.00 62.00
10 MS Nuts and Bolts
16x40 mm 7130620609 Kg 0.25 63.00 15.75
16x65 mm 7130620614 Kg 0.6 62.00 37.20
H BEAM 152X152 MM 37.10
S. New SAP
10 PARTICULARS Unit KG / MTR 13.0 MTR LONG
No. Bin Code
Qnty Rate Amount
1 2 3 4 5 6 7
16x140 mm 7130620625 Kg 0.55 61.00 33.55
11 SUB TOTAL-1 18711.65
12 Incidental Charges @ 9% : - 0.09 1684.05
13 Service in lieu of concreting metal & sand only Cmt. 0.65 3153.01 2049.46
Labour charges as per Sch No.- CL-4 (revised based on
14 1988.48
one pole)
15 Transport charges upto 50 Kms average lead from Area
stores to construction camp inc. site transport (Transport 359.65
Sch T-1) - Taken 5% of
16 SUB TOTAL-2 24793.28
17 Overhead Charges @ 11% [Market Fluctuation, Service
0.11 2058.28
Tax, Contractor's profit etc.]
18 Cost per Pole for non-guaranteed works 26851.56
19 Cost per Pole (Rounded off) 26852.00
Earlier Qty. was 1 kG because @2 kg per pole
COST SCHEDULE C-10
AUGMENTATION OF 11/0.4 kV SUB-STATION CAPACITY (ASSUMING 25 YEARS OF LIFE & 10 YEARS IN SERVICE)
2016-17
S. New SAP Bin 25 kVA to 63 kVA 63 kVA to 100 kVA 100 kVA to 200 kVA
PARTICULARS Unit Rate
No. Code Qty. Amount Qty. Amount Qty. Amount
1 2 3 4 5 6 7 8 9 10 11
1 11/0.4 kV 63 kVA X-mer (4-STAR) 7132210009 Each 84020.00 1 84020.00
2 11/0.4 kV 100 kVA X-mer (4-STAR) 7132210010 Each 116682.00 1 116682.00
3 11/0.4 kV 200 kVA X-mer (4-STAR) 7132210011 Each 204592.00 1 204592.00
R.S. Joist (175X85) mm 11 Mtr. Long i.e. 19.495
4 7130600675 Kg 32.58 857.8 27942.84 857.8 27942.84
kg/mtr x 11 mtr = 214.44 kg x 4 No = 857.8 Kgs
(i) Stay set 16 mm 7130860032 No 345.00 4 1380.00 4 1380.00
5 (ii) Stay Wire 7/10 SWG @ 5.5 Kg/Stay 7130860077 Kg 59.23 22 1302.95 22 1302.95
(iii) Stay Clamp for R.S. Joist 7130810216 No. 239.47 4 957.88 4 957.88
Concreting of support @ 0.3 Cmt/pole, @ 0.2
Cmt 1.5 1.5
6 Cmt/stay & base padding @ 0.05 Cmt/pole
Cement @ 208 Kg/Cmt 7130200401 Kg 4.90 312 1528.80 312 1528.80
7 Earthing Set (Coil earth as per Drawing No.-G/007) 7130870013 No 97.00 1 97.00 1 97.00
8 Red Oxide Paint 7130211158 Ltr 133.00 1 133.00 1 133.00
9 Aluminium Paint 7130210809 Ltr 297.00 1 297.00 1 297.00
10 Barbed Wire [@ 2 Kg/Pole] 7130610206 Kg 63.96 8 511.70 8 511.70
MS Nuts & Bolts Kg 14 14 14
16x40 mm 7130620609 Kg 63.00 1 63.00 1 63.00 1 63.00
11 16x65 mm 7130620614 Kg 62.00 4 248.00 4 248.00 4 248.00
16x140 mm 7130620625 Kg 61.00 4 244.00 4 244.00 4 244.00
16x200 mm 7130620631 Kg 61.00 5 305.00 5 305.00 5 305.00
70 Sqmm Single core XLPE insulated unarmoured Al.
12 7130310007 Mtr 39.44 120 4732.20 120 4732.20 120 4732.20
Conductor cable
150 Sqmm Single core XLPE insulated unarmoured
13 7130310041 Mtr 97.44 40 3897.40
Al. Conductor cable
14 11 kV A.B. Switch 7131930221 Each 8675.00 1 8675.00
S. New SAP Bin 25 kVA to 63 kVA 63 kVA to 100 kVA 100 kVA to 200 kVA
PARTICULARS Unit Rate
No. Code Qty. Amount Qty. Amount Qty. Amount
1 2 3 4 5 6 7 8 9 10 11
LT Distribution box suitable for transformer with
15 isolator on incoming side & SPMCCB's on outgoing
side
i 63 kVA 7131950065 No 13758.00 1 13758.00
ii 100 kVA 7131950105 No 17198.00 1 17198.00
iii 200 kVA 7131950200 No 34396.00 1 34396.00
16 SUB TOTAL-1 103370.20 173623.37 291303.77
17 Incidental Charges @ 9% : - 0.09 9303.32 15626.10 26217.34
18 Labour charges as per Sch. CL-10(B) 13858.47 15810.93 17522.02
19 Transportation charges 4137.53 4580.54 4580.54
20 SUB TOTAL-2 130669.52 209640.94 339623.67
Overhead Charges @ 11% [Market Fluctuation,
21 0.11 11370.72 19098.57 32043.41
Service Tax, Contractor's profit etc.]
22 SUB TOTAL-3 142040.24 228739.51 371667.08
2016-17
SCHEDULE FOR 11 kV UNDERGROUND CABLE CROSSING UNDER EXISTING RAILWAY TRACK / ROAD FOR 60
MTR. LONG CORRIDOR / ROUTE LENGTH OF HDPE PIPE, UNDER 2.5 MTR. DEEP FROM GROUND LEVEL SINGLE
FEEDER LINE.
2016-17
Using Pipe
Using HDD
S. New SAP Bin Pushing
PARTICULARS Unit Rate Qty. Technique Method
No. Code
Amount Amount
1 2 3 4 5 6 7 8
1 HDPE Pipe 200 mm ID; 240 mm OD 7132461004 Mtr 1020.00 120 122400.00 122400.00
2 Jointing arrangement of HDPE Pipe 7132461005 No 371.00 18 6678.00 6678.00
3 11 kV XLPE 240 sqmm 3 core UG Cable 7130310079 Mtr 922.53 180 166055.40 166055.40
4 End terminating jointing kit for 240 sqmm XLPE cable 7130352041 Set 10751.00 4 43004.00 43004.00
5 GI pipe 200 mm for cable support at D.P. 7130640027 RM 929.00 24 22296.00 22296.00
Caping of HDPE Pipe on both end of pipe using circular PVC plate of thickness
6 10 mm of size equivalent to O.D. of HDPE Pipe and using M-seal to avoid No. 1500.00 4 6000.00 6000.00
ingrace of moisture, insects, rats etc. to avoid damage to cable.
7 M.S.Flat (50x6) mm 7130600173 kg 34.15 100 3414.90 3414.90
Supplying & erection of cement cable route marker with colour painting &
8 naming the work duly embossed complete size of concrete 600 mm x 225 mm No. 556.00 4 2224.00 2224.00
x 100 mm
9 Cable covering tiles 250x250x40 mm 7130201343 No 10.42 80 833.84 833.84
10 Sand 7132498006 Cmt 670.00 1.2 804.00 804.00
11 11 kV Polymer Lightning Arrestors 7130840029 Each 517.00 6 3102.00 3102.00
12 Aluminium conductor Raccoon for jumpering of L.A. 7130830060 Mtr 42.12 18 758.07 758.07
13 Aluminium clamp suitable for Dog / Raccoon conductor for connecting L.A 7130830585 No. 223.00 6 1338.00 1338.00
GI earthing pipe 40 mm dia 3.0 mtr long, 4 mm thick with 12 mm holes at 18
14 7130642039 No 770.00 10 7700.00 7700.00
places in each pipe at equal distance tapered casing at lower end. *
Using Pipe
Using HDD
S. New SAP Bin Pushing
PARTICULARS Unit Rate Qty. Technique Method
No. Code
Amount Amount
1 2 3 4 5 6 7 8
Sundries for meeting out the expenses towards processing fees, submission / LS LS LS 25000.00 25000.00
15 approval of drawing using AutoCAD obtaining permission, from railway / Road
constructing authorities including liaisoning work etc.
* 4 Nos earthings are required for cable & 6 Nos. for 2 DP's
** Horizontal Directional Drilling (HDD) Technique
The rates mentioned at S.No.1, 2 & 3 are applicable for 60 Mtr Corridor of Railway crossing. Estimate may be prepared
based on actual length of corridor.
*** The charges to be paid for according railway permission shall be made as per actuals i.e. based on the demand note /
payment received for the same.
Using Pipe
Using HDD
S. New SAP Bin Pushing
PARTICULARS Unit Rate Qty. Technique Method
No. Code
Amount Amount
1 2 3 4 5 6 7 8
NEW ADDED
NEW ADDED
NEW ADDED
NEW ADDED
NEW ADDED
NEW ADDED
2016-17
S. New SAP
PARTICULARS Unit Rate Qnty. Amount
No. Bin Code
1 2 3 4 5 6 7
1 RCC pipe Type NP - 3 (2.5 mtr long)
i 600 mm 7130640030 Each 3857.00 50 192850.00
ii 900 mm 7130640036 Each 7661.00
2 11 kV 3 Core 240 sqmm XLPE UG Cable 7130310079 Mtr 922.53 50 46126.50
11 kV Jointing and cable termination kit for 240 sqmm
3 7130352041 Set 10751.00 2 21502.00
XLPE cable
Cable separator in RCC pipe with Angle Cross of 50x50x6
4 No 495.00 40 19800.00
mm Angle @ 2 No. in one pipe
5 G.I. Pipe 200 mm for 400 sq.mm Cable of dia. 105 mm 7130640027 RM 929.00 12 11148.00
6 GI bend 200 mm 7130640028 No 805.00 2 1610.00
Caping of RCC pipe on both end of pipe with Concreting
7 Cmt 3220.00 0.5 1610.00
and Bricks work
8 Sundries (Please specify the items) LS LS LS 2200.00
9 SUB TOTAL-1 296846.50
10 Incidental Charges @ 9% : - 0.09 26716.19
S. New SAP
PARTICULARS Unit Rate Qnty. Amount
No. Bin Code
1 2 3 4 5 6 7
Labour Charges as per Schedule CL-10 (Schedule is for
11 9799.66
1 km line, same has been revised as per 50 Mtrs.)
12 SUB TOTAL-2 333362.34
Overhead Charges @ 11% [Market Fluctuation, Service
13 0.11 32653.12
Tax, Contractor's profit etc.]
Municipality Charges for reinstatement of Road as per
14 LS 112000.00
Nagar Nigam
15 Cost per 50 Mtr for non guaranteed works 478015.46
16 Total (Round Off) 478015.00
17 Transportation Charges as per Schedule 72354.02
18 Grand Total 550369.02
19 Grand Total (Round Off) 550369.00
COST SCHEDULE C-13
SINGLE POLE MOUNTED LOW CAPACITY THREE PHASE 11/0.4 kV DISTRIBUTION TRANSFORMER SUB-
STATION
2016-17
S. 16 kVA Three Phase
PARTICULARS Bin Code No Unit Qty.
No. Rate Amount
1 2 3 4 5 6 7
1 Transformer 11/0.4 kV (Conventional) [4 STAR] 7132210007 No. 1 41602.00 41602.00
2 200 Kg 8.0 Meter long PCC Pole 7130800033 No. 1 1782.00 1782.00
3 11 kV 'V' Cross arm with clamp (instead of DC Cross arm) 7130810495 No 1 866.17 866.17
4 11 kV Top clamp with cleat 7130810679 No 1 242.99 242.99
5 11 kV Polymeric Pin insulator with Pin 7130820008 No 3 202.00 606.00
6 11 kV Polymer Disc Insulator 7130820010 No 3 142.00 426.00
7 11 kV Strain Hardware 7130820241 No 3 116.00 348.00
11 kV D.O. Fuse and L.A. mounting DC channel size 75x40x6 mm length 860
8 7130810509 No 1 2745.63 2745.63
mm
9 11 kV D.O. Fuse unit for Three phase X-mer 7131930412 Each 3 1199.00 3597.00
10 MS angle for transformer clamping set size 50x50x6 mm 7130600023 Kg 20 33.24 664.72
(i) Stay set 16 mm 7130860032 No 4 345.00 1380.00
11 (ii) Stay wire 7/10 SWG @ 5.5 Kg per stay 7130860077 Kg 22 59.23 1302.95
(iii) Stay clamp 7130810026 No 4 120.59 482.36
Concreting of supports @ 0.5 Cmt per pole and @ 0.2 Cmt per stay & base
Cmt 1.35
12 padding @ 0.05 Cmt/pole
Cement @ 208 kg per Cmt 7130200401 Kg 281 4.90 1376.90
13 Transformer mounting DC Cross arm size 65x65x6 channel length 800 mm Set. 1 1452.66 1452.66
Bracket angle for Transformer mounting supports size 50x50x6 mm length 645
14 No. 2 688.35 1376.70
mm
S. 16 kVA Three Phase
PARTICULARS Bin Code No Unit Qty.
No. Rate Amount
1 2 3 4 5 6 7
15 Danger Board 7130880041 Each 1 62.00 62.00
S. 16 kVA Three Phase
PARTICULARS Bin Code No Unit Qty.
No. Rate Amount
1 2 3 4 5 6 7
16 Barbed Wire [@ 2 Kg/Pole] 7130610206 Kg 2 63.96 127.93
Earthing set (pipe earth as per drawing)
17 (i) G.I. Pipe 40 mm 7130641396 Mtr 9 179.00 1611.00
(ii) G.I. Wire 8 SWG 7130870043 Kg 15 52.97 794.54
18 Red Oxide Paint 7130211158 Ltr 1 133.00 133.00
19 Aluminium Paint 7130210809 Ltr 1 297.00 297.00
20 11 kV Polymer Lightning Arrestor 7130840029 Each 3 517.00 1551.00
M.S. Nuts and Bolts
(i) 16x40 mm 7130620609 Kg 1 63.00 63.00
21 (ii) 16x65 mm 7130620614 Kg 4 62.00 248.00
(iii) 16x140 mm 7130620625 Kg 4 61.00 244.00
(iv) 16x200 mm 7130620631 Kg 5 61.00 305.00
22 TPN switch fuse unit (32 Amps) 7131920253 No 1 678.00 678.00
23 GI pipe size 1 inch. for movement of LT cable from X-mer Mtr. 10 181.09 1810.90
24 XLPE insulated 4 core 16 sq mm armoured cable for 3 phase X-mer 7130311084 Mtr. 30 52.16 1564.68
25 LT Feeder Piller box 1 phase 8 Way for distribution of service connection 7130890004 No. 1 3858.00 3858.00
26 SUB TOTAL-1 73600.12
27 Incidental Charges @ 9% : - 0.09 6624.01
28 Back filling of poles with boulders @ 0.3 Cmt per pole. No. 1 218.61 218.61
29 Service in lieu of concreting metal and sand Cmt 1.35 3153.01 4256.56
30 Labour charges as per Schedule No. CL-8 (G-1) 5848.85
Transport charges upto 50 Kms. Average lead from area store to const.
31 2387.68
camping site transport
32 SUB TOTAL-2 92935.83
Overhead Charges @ 11% [Market Fluctuation, Service Tax, Contractor's profit
33 0.11 8096.01
etc.]
34 Cost per Km. for Non-guaranteed works 101031.84
S. 16 kVA Three Phase
PARTICULARS Bin Code No Unit Qty.
No. Rate Amount
1 2 3 4 5 6 7
35 Cost per Km. for Non-guaranteed works (Rounded off) 101032.00
Single Pole Mounted 5 kVA & 10 kVA 11/0.4
kV X-mer S/s has been DELETED
Single Pole Mounted 5 kVA & 10 kVA 11/0.4
kV X-mer S/s has been DELETED
S. New SAP Bin 63 kVA X-MER 100 kVA X-MER 200 kVA X-MER
PARTICULARS Unit Rate
No. code No. Qty Amount Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9 10 11
RS Joist (175X85) mm 11 Mtr Long i.e.
1 19.495 Kg/mtr x 11 mtr. = 214.44 kg x 2 No = 7130600675 Kg 32.58 429 13974.68 429 13974.68
428.89 Kgs
H-BEAM 152x152 mm 37.1 Kg /Mtr 13.0 Mtr
2 7130601958 Kg 32.58 964.6 31421.85
long i.e. 482.3 Kg/pole x 2 Nos = 964.6 Kgs
Transformer 11/0.4 kV (Conventional)
63 kVA (4-STAR) 7132210009 Each 84020.00 1 84020.00
3 100 kVA (4-STAR) 7132210010 Each 116682.00 1 116682.00
200 kVA (4-STAR) 7132210011 Each 204592.00 1 204592.00
4 DC Cross arm 100x50 mm 8' Centre 7130810517 No 3758.10 1 3758.10 1 3758.10 1 3758.10
11 kV Polymer Disc Insulator 7130820010 No 142.00 3 426.00 3 426.00 3 426.00
5
11 kV H.W. 7130820241 No 116.00 3 348.00 3 348.00 3 348.00
11 kV DO fuse & LA mounting DC cross arm
6 7130810509 No 2745.63 1 2745.63 1 2745.63 1 2745.63
(75 x 40 mm)
7 11 kV DO Fuse Unit 7131930412 Each 1199.00 3 3597.00 3 3597.00 3 3597.00
8 M.S. Angle 50x50x6 mm 7130600023 Kg 33.24 20 664.72 20 664.72 20 664.72
(i) Stay set 16 mm 7130860032 No 345.00 4 1380.00 4 1380.00 4 1380.00
(ii) Stay wire 7/10 SWG (7.5 Kg each) 7130860077 Kg 59.23 30 1776.75 30 1776.75 30 1776.75
9
(iii) Stay clamp for R.S.Joist 7130810216 No 239.47 4 957.88 4 957.88
(iv) Stay clamp for H-Beam 7130810692 No 249.66 4 998.64
Concreting of support [0.3 Cmt per RSJ, 0.5
Cmt per H-Beam, 0.2 Cmt per stay, 9 cub.m. Kg. 10.4 10.4 10.8
10 (1.5x1.5x4 m) for X-mer plinth]
Cement @ 208 Kg/Cmt 7130200401 Kg 4.90 2163 10598.70 2163 10598.70 2250 11025.00
11 Danger Board 7130880041 Each 62.00 1 62.00 1 62.00 1 62.00
Earthing set pipe carth
12 (i) G.I. Pipe 40 mm 7130641396 Mtr 179.00 9 1611.00 9 1611.00 9 1611.00
S. New SAP Bin 63 kVA X-MER 100 kVA X-MER 200 kVA X-MER
PARTICULARS Unit Rate
No. code No. Qty Amount Qty Amount Qty Amount
12
1 2 3 4 5 6 7 8 9 10 11
(ii) G.I. Wire 8 SWG 7130870043 Kg 52.97 15 794.54 15 794.54 15 794.54
13 Barbed Wire [@ 2 Kg/Pole] 7130610206 Kg 63.96 4 255.85 4 255.85 4 255.85
14 Red Oxide Paint 7130211158 Ltr 133.00 2 266.00 2 266.00 2 266.00
15 Aluminium Paint 7130210809 Ltr 297.00 2 594.00 2 594.00 2 594.00
16 11 kV Polymer Lightning Arrestor 7130840029 Each 517.00 3 1551.00 3 1551.00 3 1551.00
M.S. Nuts & Bolts 14 14 17
16x40 mm 7130620609 Kg 63.00 1 63.00 1 63.00 1 63.00
17 16x65 mm 7130620614 Kg 62.00 4 248.00 4 248.00 4 248.00
16x140 mm 7130620625 Kg 61.00 4 244.00 4 244.00 5 305.00
16x200 mm 7130620631 Kg 61.00 5 305.00 5 305.00 7 427.00
PVC insulated 3.5 Core Cable
70 sqmm 7130311054 Mtr 114.08 40 4563.28 30 3422.46
18
150 sqmm 7130311057 Mtr 394.64 10 3946.40 30 11839.20
300 sqmm 7130311061 Mtr 626.23 10 6262.28
LT Distribution Box for X-mer
63 kVA 7131950065 No. 13758.00 1 13758.00
19
100 kVA 7131950105 No. 17198.00 1 17198.00
200 kVA 7131950200 No. 34396.00 1 34396.00
Stay Clamp for (i) R.S.Joist 175x85 mm 7130810216 No. 239.47 14 3352.58 14 3352.58
20
(ii) Stay clamp for H-Beam 7130810692 No. 249.66 14 3495.24
21 11 kV AB Switch 7131930221 Each 8675.00 1 8675.00 1 8675.00
22 ACSR Conductor Rabbit 7130830057 Mtr 28.44 30 853.20 30 853.20 30 853.20
23 SUB TOTAL-1 152768.90 200351.48 334431.99
24 Incidental Charges @ 9% : - 0.09 13749.20 18031.63 30098.88
25 Labour Charges as per Sch. CL-9. 18312.28 20216.82 22188.49
Service in lieu of concreting @ 3153.01 per
26 3153.01 10.4 32791.31 10.4 32791.31 10.8 34052.51
Cmt.
27 Transportation Charges 5730.44 5730.44 6685.51
28 SUB TOTAL-2 223352.13 277121.68 427457.38
Overhead Charges @ 11% [Market
29 Fluctuation, Service Tax, Contractor's profit 0.11 16804.58 22038.66 36787.52
etc.]
S. New SAP Bin 63 kVA X-MER 100 kVA X-MER 200 kVA X-MER
PARTICULARS Unit Rate
No. code No. Qty Amount Qty Amount Qty Amount
1 2 3 4 5 6 7 8 9 10 11
30 Grand Total 240156.71 299160.34 464244.90
31 Total (rounding off) 240157.00 299160.00 464245.00
Earlier Qty. was 2 kG because @2 kg per pole
COST SCHEDULE C-15
SCHEDULE FOR LAYING OF 1 Km LENGTH OF 11 kV, 3 CORE 95 SQMM / 240 SQMM / 400 SQMM UNDERGROUND
CABLE
2016-17
2016-17
Labour
Capacitor Incidental Charge per Cost per Cost per
New SAP Bin Capacitor
S. No. PARTICULARS Rating - Charges Capacitor Package Package
code No. cost
KVAR Bank Round Off
1 2 3 4 5 6 7 8 9
1 LT Capacitor for 25 kVA DT 7132200812 5 1637.00 147.33 200.00 1984.33 1984.00
2 LT Capacitor for 63 kVA DT 7132200813 10 3272.00 294.48 200.00 3766.48 3766.00
3 LT Capacitor for 100 kVA DT 7132200814 12 3932.00 353.88 200.00 4485.88 4486.00
4 LT Capacitor for 200 kVA DT 7132200814 12 3932.00 353.88 200.00 4485.88 4486.00
5 LT Capacitor for 315 kVA DT 7132200814 12 3932.00 353.88 200.00 4485.88 4486.00
Incidental Charges @ 9% : - 9%
COST SCHEDULE C-17
11 kV MEDP STRUCTURE ON H-BEAM POLE, 11 METER LONG (TO BE SUPPLEMENTED FOR H.T.
CONNECTION)
2016-17
S. PARTICULARS New SAP Unit H-Beam 152X152 mm 37.1
No. Bin Code Kg/Mtr 11.0 Mtr Long
Qty Rate Amount
1 2 3 4 5 6 7
1 H-BEAM 152x152 mm 37.1 Kg /Mtr 11.0 Mtr long i.e. 408.1 Kg/pole x 2
7130601965 Kg 816.2 32.58 26587.72
Nos = 816.2 Kgs
2 DC Cross Arm of 100x50 mm channel (2.7 Mtr. Long) 7130810512 Set 2 3256.41 6512.82
3 11 kV Polymer Disc Insulator 7130820010 No 6 142.00 852.00
4 11 kV Strain H.W. fitting 7130820241 No 6 116.00 696.00
5 11 kV Polymeric Pin insulator with Pin 7130820008 No 6 202.00 1212.00
6 (I) Stay set 16 mm 7130860032 No 2 345.00 690.00
(II) Stay Wire 7/10 SWG @ 8.5 Kg per stay 7130860077 Kg 17 59.23 1006.83
(III) Stay Clamp
(i) Stay Clamp for "H" Beam 7130810692 No 4 249.66 998.64
7 Concreting of pole @ 0.6 Cmt and 0.2 Cmt per stay and 0.05 Cmt for
Cmt 1.7
base padding
Cement @ 208 Kg/cmt 7130200401 Kg 354 4.90 1732.64
8 Earthing Set (Coil earth as per Drawing No.-G/007) 7130870013 No 2 97.00 194.00
9 Red Oxide Paint 7130211158 Ltr 2 133.00 266.00
10 Aluminium Paint 7130210809 Ltr 2 297.00 594.00
11 Barbed wire [@ 2 Kg/Pole] 7130610206 Kg 4 63.96 255.85
12 Danger Board 7130880041 Each 1 62.00 62.00
13 MS Nuts and Bolts Kg 6
S. PARTICULARS New SAP Unit H-Beam 152X152 mm 37.1
No. Bin Code Kg/Mtr 11.0 Mtr Long
Qty Rate Amount
1
13 2 3 4 5 6 7
16x40 mm 7130620609 Kg 0.5 63.00 31.50
16x200 mm 7130620631 Kg 5.5 61.00 335.50
GI earthing pipe of 40 mm dia. & 2.4 mm thick 3.04 mtr long with 12 mm
14 7130642039 No 2 770.00 1540.00
hole at 18 places at equal distance trapered casing at lower end.
15 G.I.Bend of 40 mm dia. Each 1 90.00 90.00
16 11 kV Polymer type Lightning Arrestor 7130840029 Each 3 517.00 1551.00
17 11 kV CTPT unit of appropriate capacity No
18 Copper control cable 10 Core 2.5 Sqmm. (armoured) 7130310660 Mtr 10 144.48 1444.77
19 H.T. Static Trivector Meter 3 Ø 4 Wire 0.5 S with DLMS Protocol category
7131310033 No 1 3434.00 3434.00
A
20 Universal Meter Box for HT meters. 7132406425 Each 1 2553.00 2553.00
21 Test terminal Box (TTB) 7131310037 Each 1 870.00 870.00
22 SUB TOTAL-1 53510.26
23 Incidental Charges @ 9% : - 0.09 4815.92
24 Service in lieu of concreting metal & sand only Cmt 1.7 3153.01 5360.12
25 Labour charges as per Sch No.- CL-5 7421.49
Transport charges upto 50 Kms average lead from Area stores to
26 2729.76
construction camp inc. site transport (Transport Sch. T-1)
27 SUB TOTAL-2 73837.55
28 Overhead Charges @ 11% [Market Fluctuation, Service Tax, Contractor's
0.11 5886.13
profit etc.]
29 Cost per DP for non-guaranteed works 79723.68
30 Cost per DP for non-guaranteed works (Rounded off) 79724.00
S. PARTICULARS New SAP Unit H-Beam 152X152 mm 37.1
No. Bin Code Kg/Mtr 11.0 Mtr Long
Qty Rate Amount
1 2 3 4 5 6 7
Note:- All the rates are with considering price variation clause.
2
60 Kg/Mtr 11.0 Mtr long Rail Pole (660 Kg each) x 2 No = 1320 Kgs 7130601072 Kg
CT used was for Current Transformers for VCB. (200/100/5 A) LT; Now changed with 11 kV
Earlier- Earthing through MS flat & GI pipe (Set of 8 earthings)
COST SCHEDULE C-19
SCHEDULE FOR INSTALLATION OF COMPACT R.M.U. 11 kV CLASS SF6 / VCB TYPE (1 INCOMING + 2 BREAKER
+ 1 OUTGOING)
2016-17
S. New SAP Bin
PARTICULARS Unit Rate Qty Amount
No. code No.
1 2 3 4 5 6 7
1 RMU (4 Way), One Incoming + Two Breakers + One Outgoing (2OD + 2 VL), 350 MVA, No 1050370.00 1 1050370.00
630 Amps.
2 Concreting of RMU Bed with CC 1:3:6 as per Labour Charges Cmt 0.37
Cement @ 208 Kg/Cmt 7130200401 Kg 4.90 76.96 377.10
3 Concreting of Foundation with Reinforcement CC 1:3:6 as per Labour Charges Cmt 1.44
Cement @ 208 Kg/Cmt 7130200401 Kg 4.90 299.52 1467.65
4 M.S.Strip 25 x 3 mm for earthing (of length 2 x 5 = 10 Mtr.) Kg 33.24 6 199.44
GI earthing pipe of 40 mm dia 3.04 mtr long with 12 mm hole at 18 places at equal 7130642039 No 770.00 2 1540.00
distance trapered casing at lower end .
5 SUB TOTAL-1 1053954.19
6 Incidental Charges @ 9% : - 0.09 94855.88
7 Labour Charges as per Sch. CL-11. 6104.00
8 Service in lieu of Concreting metal & sand only Cmt 3153.01 1.81 5706.95
9 Transportation Charges 5730.43
10 SUB TOTAL-2 1166351.45
11 Overhead Charges @ 11% [Market Fluctuation, Service Tax, Contractor's profit etc.] 0.11 115934.96
12 Grand Total 1282286.41
13 Grand Total (Rounded off) 1282286.00
S. New SAP Bin
PARTICULARS Unit Rate Qty Amount
No. code No.
1 2 3 4 5 6 7
1 2 3 4 5 6 7
1 M.S.Strip 25x3 mm (0.6 kg/Mtr.) Kg 33.24 10 332.40
2 Chem Rod Earthing electrode (Chemical Earthing) No. 9000.00 1 9000.00
3 G.I. Nuts & Bolts 16x40 mm 7130620133 Kg 87.00 1.5 130.50
4 G.I. Nuts & Bolts 16x65 mm 7130620140 Kg 87.00 1.5 130.50
5 G.I. Spring Washer 7130622922 Kg 125.00 1 125.00
6 SUB TOTAL-1 9718.40
7 Incidental Charges @ 9% : - 0.09 874.66
8 Labour Charges No. 746.84 1 746.84
9 Transportation Charges 800.00
10 SUB TOTAL-2 12139.90
11 Overhead Charges @ 11% [Market Fluctuation, Service Tax, Contractor's profit 0.11 1069.02
etc.]
12 Grand Total 13208.92
13 Grand Total (Rounded off) 13209.00
Note:- Chemical Earthing consists of Galvanized Mild Steel pipe of size 2000 mm x 50 mmn Outer
diameter or higher size as per site conditions, filled with a highly conductive material and a GI Strip
minimum 16 mm x 3 mm covering total of pipe, forming the electrode for obtaining earth
resistance less than 1 ohm.