Quotation of 1MW
Quotation of 1MW
To,
Jignesh bhai
GRV Spintex Pvt Ltd
Executive Summary
Alfa energy offers end to end solar EPC solutions, grid-connected solar PV
systems, off-grid solar PV systems, solar power plants, rooftop solar PV systems
as well as integrated PV systems. Our experience of engineering and installing
high quality solar power systems and our uncompromising service is what makes
us a strong player. As a professional solar photovoltaic system supplier, we
monitor the project closely; provide on-time delivery, and accountability
throughout the life of the system.
1MW Capacity
On – grid POLYCAB / ABB
Efficiency > 98%
Inverter / Delta / 1 No.
5 years manufacturer warranty waree
Module
ISI approved GI Pipe
Mounting As
120 kmph wind load Capable N.A. Required
Structure
As Per
IP 65 Junction box with required
DCDB Industry Standard Design
switch gear protection
As Per
IP 65 Junction box with required
ACDB Industry Standard Design
switch gear protection
Lightning As per
Surge protection & lightning devices Industry Standard
arrestor design
3 Scope of Work
Feasibility Study:
- Alfa team shall survey the site and measure the available floor / roof
space suitable for pv modules installation.
- The Electrical layout of the Building site will be properly studied and also needed
information will be checked.
- Application for approval of project to respective authorities
Design:
- SSPL team shall suitably design the system to optimize the system performance and
Client’s investment.
- Basic civil structure and mounting structure will be designed.
Installation:
- Documents submission for registration of the plant and subsidy
- Installation of Mounting structures
- Installation of PV Modules on Mounting structures, cabling & wiring to connect
Modules to Inverters, connection of inverters to Inter- connection point, connection
of Inverters.
- Installation of protection devices like SPD, Lightning arrestors, etc
wherever required.
- Termination of Inverter Connections at Distribution Panel
Commissioning:
- Test report preparation and submission
Training of Personnel:
- SSPL team will train the Personnel / team nominated by the Client for
maintaining the Plant on day to day basis and to handle emergency situations.
Notes:
- Customer will appoint a single point of contact person for all tasks related to
installation and commissioning of the project. Permission to the building rooftop,
arranging necessary approvals at customer end, decisions about placing of
equipments and any other help required will be his responsibility.
- Arranging the accessibility to the roof is customer’s responsibility.
- Any civil work required additionally other than mentioned in this proposal will
be customer’s responsibility.
4 Quotation
Payment Terms:
Price is exclusive of applicable taxes (5%)
Transportation will be borne by customer as per actual
Payment schedule:
o 25% Advance Upon award of Contract
o 50 % against dispatch of material
o 25% Complete the inspection (throughout power on grid)
The Proposal is valid for 30 days from the date of issue
Any charges levied by DISCOM, Electrical Inspector and Nodal Agencies will
be borne by the customer as per Actual
All cheques / DDs are to be in favor of “Alfa energy, payable
at Rajkot
5 ROI Calculation
Below table provides an estimation of return of investment from the project:
Pay-Back Period
Notes:
SSPL requires all documents duly signed by customer in order to submit
the applications respective authorities.
The installation of project depends on the size of the project and
availability of material.
Inspections from CEI and installation of net/bidirectional meter from
Discom is done by respective authorities. Hence SSPL does not guarantee
the timelines for the same.
7 Terms and Conditions
All standard manufacturer warranties shall be transferred to the Client
Govt. Charges for registration of the project for the subsidy will be charged
extra
SSPL shall raise Invoice to the Client as per registration of project.
Company works under corporate ethics “Beneath it All”. Please refer in case of
any query.
Customer should not default in payment terms as per agreement,
otherwise bank interest would be charged after credit period.
Delay in project execution due to customer or act of God will not be waived.
SPP contains electronics parts, to be operated in SOC (Standard Operating
Conditions), defaulting such may result in withdrawal of warranty or termination
of Service Contract.
System Specifications may vary due to continuous development in Technology.
8x6 technical support provided from Alfa energy
8 Benefits of proposed solution