Drilling Log: Ded Pembangunan Jalan Tol

The drilling log is for hole BH1 from a drilling project in Semarang-Demak, Indonesia. Standard Penetration Tests were conducted every 1.5 meters from 0-34 meters depth. The soil consists of silty clay from the surface to 34 meters depth, ranging from very soft to stiff consistency. Groundwater was encountered at 0.5 meters below ground surface.

Uploaded by

RizalPurnama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
194 views2 pages

Drilling Log: Ded Pembangunan Jalan Tol

The drilling log is for hole BH1 from a drilling project in Semarang-Demak, Indonesia. Standard Penetration Tests were conducted every 1.5 meters from 0-34 meters depth. The soil consists of silty clay from the surface to 34 meters depth, ranging from very soft to stiff consistency. Groundwater was encountered at 0.5 meters below ground surface.

Uploaded by

RizalPurnama
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

DRILLING LOG HOLE NO.

BH1
Project DED PEMBANGUNAN JALAN TOL Type of Drilling Wash Boring Coordinat
Location Semarang - Demak Driller Nur Irwan X
Date 4-6 Nopember 2015 Supervisor Silam Y
GWL 0.5 m Z

N2 (15-30CM)

N3 (30-45CM)
SPT Curve Soil Laboratory Results

N1 (0-15CM)

N-SPT
Depth

Sampling Symbol Soil Description C


gw LL PL
Gs W % Type kg/cm f
t/m³ % %
²
0.0

0.5

1.0

1.5 UDS 1 clayey SAND, grayish brown


1.50-2.00 SC

2.0 SPT 1 silty CLAY, gray, high plasticity, medium stiff 2 3 3 6


2,00-2,45 CH
consistancy
2.5

3.0

3.5

4.0 SPT 2 grades very soft consistancy 1/45 0


4,00-4,45

4.5

5.0

5.5

6.0 SPT 3 same as above 1/30 1 1


6,00-6,45

6.5

7.0

7.5

8.0 SPT 4 same as above 1/30 1 1


8,00-8,45

8.5

9.0

9.5 UDS 2 same as above


9.50-10.00

10.0 SPT 5 same as above 1/30 1 1


10,00-10,45

10.5

11.0

11.5

12.0 SPT 6 same as above 1 1 2 3


12,00-12,45

12.5

13.0

13.5 UDS 3 same as above


13.50-
14.00
14.0 SPT 7 same as above 1/45 0
14,00-14,45

14.5

15.0

15.5

16.0 SPT 8 same as above 1/30 1 0


16,00-16,45

16.5

17.0

17.5

18.0 SPT 9 same as above 1/30 1 1


18,00-
18,45
18.5

19.0

19.5

20.0 SPT 10 silty CLAY, gray, high plasticity, very soft consistancy 1/30 1 1
20,00-20,45
Remarks : UDS (Undisturbed Sample)
DS (Disturbed Sample)
DRILLING LOG HOLE NO. BH1
Project DED PEMBANGUNAN JALAN TOL Type of Drilling Wash Boring Coordinat
Location Semarang - Demak Driller Nur Irwan X
Date 4-6 Nopember 2015 Supervisor Silam Y
GWL 0.5 m Z

N2 (15-30CM)

N3 (30-45CM)
SPT Curve Soil Laboratory Results

N1 (0-15CM)

N-SPT
Depth

Sampling Symbol Soil Description C


gw LL PL
Gs W % Type kg/cm f
t/m³ % %
²
20.0 SPT 10 silty CLAY, gray, high plasticity, very soft consistancy 1/30 1 1
CH
20,00-20,45
20.5

21.0

21.5

22.0 SPT 11 grades very soft to soft consistancy 1 1 1 2


22,00-22,45

22.5

23.0

23.5

24.0 SPT 12 grades soft consistancy 1 1 2 3


24,00-
24,45
24.5

25.0

25.5

26.0 SPT 13 grades medium stiff consistancy 2 2 3 5


26,00-
26.5 26,45

27.0

27.5

28.0 SPT 14 grades medium stiff to stiff consistancy 2 4 4 8


28,00-
28,45
28.5

29.0

29.5

30.0 SPT 15 grades stiff consistancy 3 4 5 9


30,00-30,45
30.5

31.0

31.5

32.0 SPT 16 same as above 4 5 7 12


32,00-32,45

32.5

33.0

33.5

34.0 SPT 17 same as above 3 4 6 10


34,00-34,45

34.5

35.0

35.5

36.0 SPT 18 grades brownish gray 3 4 8 12


36,00-36,45

36.5

37.0

37.5

38.0 SPT 19 same as above 3 6 9 15


38,00-
38,45
38.5

39.0

39.5

40.0 SPT 20 same as above 4 6 10 16


40,00-40,45
Remarks : UDS (Undisturbed Sample)
DS (Disturbed Sample)