Gantt Chart

This Gantt chart outlines a 12-week project plan divided into 6 main tasks: analysis, design, development, testing, implementation, and completion. It details the subtasks and timelines for each main task, including required meetings, documenting the current system, designing the database and software, developing and integrating system modules, performing testing, installing the system on-site, and final evaluation and maintenance.

Uploaded by

Walter Peralta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views1 page

Gantt Chart

This Gantt chart outlines a 12-week project plan divided into 6 main tasks: analysis, design, development, testing, implementation, and completion. It details the subtasks and timelines for each main task, including required meetings, documenting the current system, designing the database and software, developing and integrating system modules, performing testing, installing the system on-site, and final evaluation and maintenance.

Uploaded by

Walter Peralta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Gantt Chart

Weeks
Task
1 2 3 4 5 6 7 8 9 10 11 12
1. Analysis
Required Meeting
Document Current System
Finished Analysis
2. Design
Design Data Base
Software Design
Interface Design
Create Design Specification
Design Finished
3. Development
Develop System Module
Intergrate System Module
Perform Initial Testing
Development Finished
4. Testing
Perform System Testing
Document Issues Found
Correct Issues Found
Testing Finished
5. Implementation
On-site Installation
Support Plan for the System
6. Completion
System Maintenance
Evaluation
Finished