Method Statement For Testing & Commissioning of Central Battery System

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

METHOD STATEMENT FOR TESTING & COMMISSIONING OF

CENTRAL BATTERY SYSTEM

1. PRE-COMMISSIONING

1.1 The following to be completed before starting the Testing & Commissioning
 Insulation resistance measurement of cables.
 All Emergency & Exit luminaires to be installed.
 Central battery control panel & Battery cabinet to be installed.
 All outgoing circuit cables to be marked & terminated at panel.
 Batteries interconnection & termination.
 Main’s power supply to the panels.

1.2 INSULATION RESISTANCE MEASUREMENT


 Insulation Resistance of the mains power supply cable from SMDB/DB to Central Battery Panel
and all out going circuit cables from Central Battery Panel to luminaires must measure with
Insulation resistance tester before terminating at the panel and luminaires. The value must be
recorded by the installer.

1.3 LUMINAIRE SETTING


 Set luminaire address.
 Set luminaire mode of operation (Maintain or Non-maintain).

1.4 BATTERY CONNECTION


 Connect the batteries in series to get 216V.
 Measure the battery voltage and record the reading.

2. TESTING & COMMISSIONING

2.1 VISUAL CHECK


 Check CBS panel installation for interior / exterior damage if any.
 Check battery installation for interior / exterior damage if any.
 Check mains power supply provided from dedicated breaker.
 Check mains power supply cable termination inside the panel.
 Check termination of outgoing circuits.
 Check battery interconnection.
 Check battery cable / wire termination inside the panel.
 Check luminaire installation.

2.2 CONTROL PANEL SETTINGS


 Battery size setting.
 Maintained / Non maintained mode setting.
 Addressable or Group monitoring setting.

ERH-IECO-EL-MS-T&C-002 ISSUE NO. 01 REV. NO. 00 06-JULY-2019 PAGE 1 OF 6


2.3 SWITCHING ON THE UNIT
 Remove the battery fuses.
 Switch Off mains power supply breaker.
 Connect the battery cable with proper polarity.
 Check outgoing circuit cables for short circuit & Earth leakage faults by using digital multimeter.
 Connect mains supply cable.
 Switch ON main supply breaker.
 Check mains power supply voltage by using digital multimeter and record the value.
 Refit/ Replace the battery fuses.( Fuse can be installed with Power ON)
 Check battery voltage by using digital multimeter and record the value.

2.4 PROGRAMMING AND TESTING


 Set automatic Luminaire test time.
 Set automatic battery test duration time.
 Put the panel into auto learn mode to find the luminaires on each circuit and save it on the panel
memory.
 Check for failure of luminaire, if any.
 Check Maintained & Non Maintained Luminaire function
 Check sub circuit monitoring module (Local Controller / Intelligent controller) function
 Check normal mode operation of panel.
 Check battery mode operation of panel.
 Check battery duration test with all luminaire ON condition.
 Check battery charger operation.
 Program the central monitoring system (ACM) and check the function.

2.5. ATTACHMENTS:

 REPORTS.
 RISK ASSESSMENT

TESTING AND COMMISSIONING REPORT


CENTRAL BATTERY SYSTEM - PANEL CHECK LIST
PROJECT EXPANSION OF ROYAL HOSPITAL
PANEL LOCATION
PANEL REF. NUMBER

PANEL TYPE
OBSERVATION REMARKS
VISUAL CHECK
Check control panel installation for interior/ exterior damage
Check mains power supply & battery cable termination
Check outgoing circuits cable identification and termination
Check batteries installation for interior/exterior damage if any

Check batteries interconnection termination


Check mains power supply provided from dedicated breaker
Check Emergency and Exit light installation
Check local controller / Intelligent controller (if included in
the design) installation & termination
Check lighting DB side termination for DB power failure
monitoring
VOLTAGE MEASURMENT
Check battery voltage Voltage: _______V DC
Check mains power voltage Voltage: _______V AC
CONTROL PANEL SETTINGS
Battery size (AH) Battery: ________AH
Circuits operating mode setting (Maintained / Non maintained
mode)
Addressable or group monitoring setting
Set panel date and time
Set automatic luminaires test time Time: ______
Remarks:

Tested BY: Witnessed By: Witness&Certified By: Approved By:


Third party consultant
Supplier MEP/Main Contractor Consultant(K&A)
(Applus Velosi)
Name: Name: Name: Name:
Sign: Sign: Sign: Sign:
Date: Date: Date: Date:
TESTING AND COMMISSIONING REPORT
CENTRAL BATTERY SYSTEM - PANEL CHECK LIST

PROJECT

PANEL LOCATION

PANEL REF. NUMBER

PANEL TYPE
ACTIVITY EXPECTED RESULT OBSERVATION REMARKS
Check mains present LED
indication during mains power Mains present LED ON
present condition
Check mains present LED
indication during mains power Mains present LED OFF
failure condition
Check battery operation LED
Mains present LED OFF &
indication (switch off mains power
Battery operation LED ON
supply)
Check battery fault LED
Battery over voltage, Battery fault
indication (Disconnect battery
and Internal fault LED ON
fuse)
Check battery under voltage LED
indication (Switch off mains Battery under voltage LED ON,
power supply for few minutes and Recharge LED blinks
switch on again)
Internal fault LED indication Battery over voltage, Battery fault
(Disconnect the battery fuse) and Internal fault LED ON
External fault LED indication
( Remove one Emergency /Exit External fault LED ON after the
light from the one of the circuit test
and make manual luminaire test)
Check mains power to Battery Panel operates in battery mode
mode operation (Switch off mains also all emergency & Exit lights
power ) are ON
Check battery to mains power Panel operates in normal mode,
mode operation (Switch on mains also all Emergency lights are OFF
power ) and all Exit lights are ON
Check light fault (Remove one External fault LED ON &
Emergency / Exit light from one Respective luminaire address led
of the circuit and make manual is blinking in the panel control
luminaire test ) module
Check Emergency light operation
Respective area Emergency lights
during normal lighting DB mains
will switch on automatically
power failure condition
Remarks:

Tested BY: Witnessed By: Witness&Certified By: Approved By:


Third party consultant
Supplier MEP/Main Contractor Consultant(K&A)
(Applus Velosi)
Name: Name: Name: Name:
Sign: Sign: Sign: Sign:
Date: Date: Date: Date:

TESTING AND COMMISSIONING REPORT


CENTRAL BATTERY SYSTEM - PANEL CHECK LIST
BATTERY DURATION TEST
PROJECT
PANEL LOCATION
PANEL REF.
NUMBER
PANEL TYPE
BATTERY AH _______ Ah QTY
Battery duration time details
Start time

End time

Battery Voltage
O Mins

60 Mins

120 Mins

180 Mins

Remarks:

Tested BY: Witnessed By: Witness&Certified By: Approved By:


Third party consultant
Supplier MEP Contractor Consultant(K&A)
(Applus Velosi)
Name: Name: Name: Name:
Sign: Sign: Sign: Sign:
Date: Date: Date: Date:

You might also like