The document provides information for an elemental cost analysis of a construction project, including project details, contract information, design and area details for the building, a summary of elemental costs broken down by category and material quantities, and a brief specification of materials and construction for each element.

Uploaded by

Janet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
151 views6 pages

ECA Sample

The document provides information for an elemental cost analysis of a construction project, including project details, contract information, design and area details for the building, a summary of elemental costs broken down by category and material quantities, and a brief specification of materials and construction for each element.

Uploaded by

Janet
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Elemental Cost Analysis - Form 1

JOB TITLE : X CLIENT : X

LOCATION : X TENDER DATE : X

INFORMATION ON TOTAL PROJECT

Project and Contract Information

Project Details and Site Conditions : Contract :

Market Conditions :
Contract Particulars : Cost Fluctuation : Competitive Tender List
Type of Contract: X Yes RM Int/JV/L

Basis of Tender: Open No x


Open/Selected
Bills of Quantities x Competition x Government

Bills of Approx. Quantity Negotiated Private x

Schedule of Rates/
Spec & Drawings Serial

Provisional Sum RM
Contract Period Stip. by Client : 1 month Prime Cost Sum RM
Contract Period Offered by Builders : x Preliminaries RM
Number of Tenders Issued : X Contingencies RM
Number of Tenders Received : X Contract Sum RM X

ANALYSIS OF SINGLE BUILDING


Design/Shape Information
Accommodation and Design Features : PG 4 - CL 3 (Design/shape information for single buildings)
Functional Unit : Design/Shape : PG 4 - CL 3
Areas : Percentage of Gross Floor Area
Lower Ground Floor m2
Ground Floor X m2 a) Below Ground Floor
Upper Floor m2 External Wall Area = X Construction %
GROSS FLOOR AREA - m2 Gross Floor Area X
= X b) Single-storey
Usable Area m2 Construction %
Circulation Area m 2

Ancillary Area m2 Storey Heights : c) 2-Storey


Internal Division m2 Construction %
GROSS FLOOR AREA m2 Av. Below Grd Floor -m
d) 3-Storey
Floor Space NOT Enclosed :Did not specify in the manual m2 At Ground Floor -m Construction %

Roof Area : m2 Above Ground Floor -m e) 4 - Storey


(Structural and Plant Rooms) Construction %

Brief Cost Information


Contract Sum RM X Functional Unit Cost excluding external
Provisional Sum RM Works :
Prime Cost Sum RM
Preliminaries RM being --- % of remainder
Contingencies RM being --- % of contract Sum
Contract Sum
less Contingencies RM X

*** PG - PAGE
CL - CLAUSE
Elemental Cost Analysis - Form 2 0
(As per Form1)
SUMMARY OF ELEMENTAL COSTS
GROSS FLOOR AREA: 6 m2 (For One Typcial Block) TENDER DATE :
Preliminaries Shown Separately
Element Total Cost Cost/m2 Elemental Elemental Element Reinforced Reinforcement Formwork
Of Element GFA Unit Unit Rate Ratio Concrete
RM RM Quantity RM per m2 GFA m3 kg m2
1 Substructure
1A Piling
1B Work Below Lowest Floor Finis #REF! #REF! X X X
Group Elemental Total #REF! #REF!
2 Superstructure
2A Frame #REF! #REF! X X X
2B Upper Floors X X X
2C Roof x x
2D Stairs
2E External Walls #REF! #REF!
2F Windows & External Doors X X
2G Internal Wall & Partitions
2H Internal Doors
Group Element Total - -
3 Finishes
3A Internal Wall Finishes X X
3B Internal Floor Finishes X X
3C Internal Ceiling Finishes X X
3D External Finishes X X
Group Element Total X
4 Fittings and Furnishings
5 Services
5A Sanitary Appliances X X
5B Plumbing Installation
5C Refuse Disposal
5D Air Conditioning & Ventilation Requirement given
System
5E Electrical Installation
5F Fire Protection Installation
5G Lift & Conveyor Installation
5H Communication Installation
5J Special Installation
5K Builder's Profit & Attendance
on Services
5L Builder's Work In Connection
With Services
Group Element Total X
Sub-total exc. External Works,
Preliminaries & Provisional Sum
6 External Works
6A Site Work
6B Drainage
6C External Services
6D Ancillary Buildings
6E Recreational Facilities

Group Elemental Total

Preliminaries

TOTAL (less provisional sum)

***PG - PAGE
CL - CLAUSE
Elemental Cost Analysis - Form 3

BRIEF SPECIFICATION
GROSS FLOOR AREA : (As per Form 1) TENDER DATE :
ELEMENT SPECIFICATION
1 Substructure
1A Piling
1B Work Below Lowest Floor Finish x

2 Superstructure
2A Frame x
2B Upper Floors Not applicable
2C Roof x
2D Stairs Not applicable
2E External Walls x
2F Windows & External Doors x
2G Internal Wall & Partitions
2H Internal Doors

3 Finishes
3A Internal Wall Finishes x
3B Internal Floor Finishes x
3C Internal Ceiling Finishes
3D External Finishes x

4 Fittings & Furnishings

5 Services
5A Sanitary Appliances x
5B Plumbing Installation
5C Refuse Disposal
5D Air Conditioning & Ventilation System
5E Electrical Installation
5F Fire Protection Installation
5G Lift & Conveyor Installation
5H Communication Installation
5J Special Installation
5K Builder's Profit & Attendance on Services
5L Builder's Work In Connection With Services

6 External Works
6A Site Work
6B Drainage
6C External Services
6D Ancillary Buildings
6E Recreational Facilities

*** PG - PAGE