Steel Framing For Service Yard
Steel Framing For Service Yard
Steel Framing For Service Yard
STEEL PORTAL
COVERING 1. Do not scale from the drawing
FRAMES
RIDGE OF NOTE :
PORTAL FRAME
BEAM CUTTINGS
TYPES OF PORTAL
WELDED TO
UNDER SIDE
FRAME :
OF RAFTER SHORT-SPAN PORTAL FRAME
SPAN : UP TO 15M
SPACING : 3M TO 5M
END PLATES WELDED
MEDIUM-SPAN PORTAL FRAME
TO RAFTERS & BOLTED
TOGETHER
SPAN : 16M TO 35M
SPACING : 4M TO 8M
STIFFING AT RIDGE OF STEEL PORTAL FRAME (1:10)
LONG-SPAN PORTAL FRAME
SPAN : 36M TO 60M
SPACING : 8M TO 12M
GROUT BETWEEN BASE PLATE & CONCRETE DISHED PACKING COLUMN TO ROOF TRUSS JOINT FRAME (1:10)
PIECE BETWEEN PLATES
WEB STIFFENER
WELDED TO TOP
BEAM CUTTING
OF POST
WELDED TO
PINNED BASE TO STEEL PORTAL FRAME (1:10) PURLIN SPACING = SPAN OF ROOF DECKING: 1220 T0 1520
UNDER SIDE
OF RAFTER
BOLTED CONNECTION
CHANNEL OR END PLATES WELDED
'Z'- SHAPE TO RAFTERS & BOLTED
PURLINS TO POST
WEB STIFFENER
BOLTED CONNECTION WELDED TO POST
RAFTERS & POSTS FROM REHABILITATION WORKS FOR TOYOTA GHANA YARD
SAME SECTION OF STEEL BEAM
FRAMES PROVIDED RESISTANCE TO LATERAL FORCES IN THEIR PLANES; THEY MUST
BE BRACED IN A DIRECTION PERPENDICULAR TO THE FRAME.
ADJUMA CRESCENT,ACCRA
SHORT SPAN STEEL PORTAL FRAME (1:200)
CHANNEL OR
'Z' SHAPE
GIRTS FRAMING IS TYPICALLY CLAD WITH CORRUGATED METAL ROOFING AND SIDIND
RIDGE DEPTH :
SPAN /40
AS SHOWN
PITCH: 1:12 TO 4:12
TYPICAL SPAN:
16M TO 36M
ADJUMA CRESCENT STREET
WALL HEIGHT:
2440 TO 9050
ACCRA,GHANA
1 : 100
BASE :
200 TO 510
11th July,2019
MEDIUM SPAN STEEL PORTAL FRAME (1:200) Emmanuel
HOLDING
AT SHORTER SPAN SECTIONS DOWN BOLTS MEDIUM SPAN STEEL PORTAL FRAME (1:200)
GROUT BETWEEN BASE PLATE & CONCRETE Emmanuel
Mr.Wu
CONCRETE BASE
TO PORTAL FRAME