Production Planning: S/4 Hana

This document outlines the process for production planning in SAP S/4 HANA. It details the prerequisites of finished goods items, raw materials, bills of material and routings. It then explains how to create a production order, complete the production order, and do a goods receipt of finished goods. Key transaction codes provided include CO01 for creating a production order, CO11N for production order completion, and MIGO for goods receipt.

Uploaded by

Veera Mani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views15 pages

Production Planning: S/4 Hana

This document outlines the process for production planning in SAP S/4 HANA. It details the prerequisites of finished goods items, raw materials, bills of material and routings. It then explains how to create a production order, complete the production order, and do a goods receipt of finished goods. Key transaction codes provided include CO01 for creating a production order, CO11N for production order completion, and MIGO for goods receipt.

Uploaded by

Veera Mani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 15

PRODUCTION PLANNING

S/4 HANA

Table of Contents

1. Overview….………………………………………………………………………………………..……………………………………………………….………………..2

2. Pre – equisites………………………………………………….………………………………………………………….……………………………………………….2

a. Finished goods items ……………………….………………………………………………………………………………………………………………….2


b. Raw Materials……………………………….…………………………………………………………………………………………..…………….……..…..2
c. Bill of Material …………………………………………………………………………………………………………………………………………………….2
d. Routing (CRM) ………………………………………………………………………………………………………………………….………….……………..2

3. Creation of Production order…………………………………………………………………………….………..…………………………………………….....3

4. Production order completion……………………………………………………………………………………………………………….……………………....4

5. Goods Receipt for Finished Goods………………………………………………………………………………………………………………………………..5

Indus Novateur Soft Tech Pvt Ltd

1
PRODUCTION PLANNING
S/4 HANA

Process Steps

1.Create Item master for Finished Goods and Raw materials using T-Code : MM01

2.Create Bill of Material for Finished goods and Semi Finished goods using T-Code: CS01

3.Create Production Order using T-Code: CO01 then use CO02N and client the Flag to realase

4.Production order Completion using T-Code : CO11N

5.Goods Receipt for FG using T-Code : MIGO.

Indus Novateur Soft Tech Pvt Ltd

2
PRODUCTION PLANNING
S/4 HANA
Bill of Material – T-Code :CS01

S/4 HAN Menu Logistics-> Produciton-> Bill of Material->Material BOM->CS01-Create

Transaction code CS01, CS02,CS03

Indus Novateur Soft Tech Pvt Ltd

3
PRODUCTION PLANNING
S/4 HANA
Press Enter

Indus Novateur Soft Tech Pvt Ltd

4
PRODUCTION PLANNING
S/4 HANA

Production order

T-Code : CO01 Create


: CO02 Change
: CO03 Display

Enter the T-Code : CO01 and press enter to create new Production order

Press enter

Indus Novateur Soft Tech Pvt Ltd

5
PRODUCTION PLANNING
S/4 HANA

Material issue

For this You should click the Green Flag

After Click the the following message will come

Production Completion

Indus Novateur Soft Tech Pvt Ltd

6
PRODUCTION PLANNING
S/4 HANA

Press Enter

Indus Novateur Soft Tech Pvt Ltd

7
PRODUCTION PLANNING
S/4 HANA

In this screen We have to fill the yield quantity and scrap

Indus Novateur Soft Tech Pvt Ltd

8
PRODUCTION PLANNING
S/4 HANA

Enter the Yeild Quantity and then Press Goods Movement option in the top

Indus Novateur Soft Tech Pvt Ltd

9
PRODUCTION PLANNING
S/4 HANA

In this screen we should select the batch for the respective items

Then press save

Then We have to use T-Code MIGO for FG goods receipt

Indus Novateur Soft Tech Pvt Ltd

10
PRODUCTION PLANNING
S/4 HANA

Press Enter key the next screen will be shown

Enter the storage location


Indus Novateur Soft Tech Pvt Ltd

11
PRODUCTION PLANNING
S/4 HANA

The item details will be shown here

Indus Novateur Soft Tech Pvt Ltd

12
PRODUCTION PLANNING
S/4 HANA

Here we have to press post button in the top

Indus Novateur Soft Tech Pvt Ltd

13
PRODUCTION PLANNING
S/4 HANA

Now press post button

Indus Novateur Soft Tech Pvt Ltd

14
PRODUCTION PLANNING
S/4 HANA

Indus Novateur Soft Tech Pvt Ltd

15