Quick Navigation: For (GCMS-QP2010 Ultra / SE)
Quick Navigation: For (GCMS-QP2010 Ultra / SE)
Quick Navigation
For (GCMS-QP2010 Ultra / SE)
This document provides quick and easy operational guidelines for GCMSsolu-
tion Ver. 2.6. Please keep this document beside your GC/MS in order to quickly
Please do not shut down GC/MS system because several hours will be required /P 0QFSBUJPO %FTDSJQUJPO
for starting-up. The PC can be switched off except during analysis. The CRT can 0/ Turn the CRT ON.
be switched on and off whenever required.
$MJDL Cancel the ecology mode.
2 Executing Autotuning GCMS Data Acquisition Program
Set the method file you are going to use for the analysis. After the GC/MS system r&YFDVUJOH"VUPUVOJOH
is ready for the analysis, perform autotuning.*1*2 /P 0QFSBUJPO %FTDSJQUJPO
$MJDL Open the [Peak Monitor] sub-window.
*1 Execute autotuning after creating the method file if it has not already been created. *3 To check the results of autotuning, refer to the
*2 Whenever autotuning is executed, calibration curves must be newly created. Operation Guide "2.7.3 Checking Autotuning Results".
Quick Navigation GPS ($.4216MUSB4&
Files with file types in the figure on the right will be created after analysis. rBOE'JMF/BNFT
%JTQMBZFE*DPOT
Create a new folder in order to save those files in the same folder.
/P 0QFSBUJPO %FTDSJQUJPO
Data file
$MJDL Open the [Create New Project (Folder)] sub-window.
*OQVU Enter the folder name.
Method file
$MJDL Select the files to copy to the new folder.
$MJDL The new folder is created.*1
Report format file
*1 A new folder is created on the same level of the currently opened folder in Data Explorer.
For detailed procedure to open the target folder, please refer to the Operation Guide "Appendix C Using Data Explorer".
Batch file
Please modify the previously created batch file for easy operation.
For details on how to create method files and batch files, refer to the Operation Guide “4.1 Creating a
Method File”, “5.1 Creating a Method File”, “4.3.1 Creating a Batch File”and “5.2.1 Creating a Batch File”.
/P 0QFSBUJPO %FTDSJQUJPO
*1 For details on how to edit batch table, refer to the Operation Guide “4.3.2 Editing a Batch File”.
*2 This setting can be cancelled by repeating operation 5, but always leave it set.
Quick Navigation GPS ($.4216MUSB4&
Display the mass spectra for chosen peak and perform library search.
Register the results in the spectrum prodcess table. It allows referencing
the results later or printing out the report.
*1 For details on how to create reports, refer to the
Operation Guide “4.5 Printing Qualitative Analysis Reports”.
The range dragged with
the mouse is displayed
enlarged in the MC window.
At peak top
/P 0QFSBUJPO %FTDSJQUJPO
Quick Navigation GPS ($.4216MUSB4&
Identification mark
r$IFDLJOHBOE.PEJGZJOH$BMJCSBUJPO$VSWFT
/P 0QFSBUJPO %FTDSJQUJPO
r2VBOUJUBUJWF$BMDVMBUJPOPG6OLOPXO4BNQMFT
/P 0QFSBUJPO %FTDSJQUJPO
$IFDL Check that the window is the [Data Analysis] window in the quantitative processing mode.
%PVCMFDMJDL Open the data file.
$MJDL Load the method file used for creating the calibration curve.
$MJDL Perform quantitative peak integration.
$MJDL Check the quantitative results.
$MJDL Select the target row.
$IFDL Check the chromatogram of the target component.*3
.PEJGZ Perform manual peak integration and manual identification as required.
$MJDL Overwrite and save the data file.
$MJDL Create a report.*1
Quick Navigation GPS ($.4216MUSB4&
How to Perform Manual Peak Integration Appendix. Performing Maintenance GCMS Data Acquisition Program
r4UBSUJOH6Q.BJOUFOBODF)FMQ
/P 0QFSBUJPO %FTDSJQUJPO
How to Perform Manual Identification
4ZSJOHF Thoroughly rinse with solvent before data acquisition. During operation
4FQUVN Replace every 100 data acquisitions. Easy sTop
·Replace according to the injection mode (split, splitless).
*OTFSU Easy sTop
·Replace when the peak shape has deteriorated or peak intensity has decreased.
·Check separation between the target component and other peaks, and replace the column
$PMVNO with the ideal column. Vacuum system stopped
·Perform maintenance when the peak shape has deteriorated or peak intensity has decreased.
'JMBNFOU
·Replace when the trap current insufficient message is displayed. Vacuum system stopped
·Replace burned out filaments.
Replace every 3000 hours of operation. Vacuum system stopped
0JMGPSUIFSPUBSZQVNQ