0% found this document useful (0 votes)
179 views1 page

Handover

The document is a contractor site handover certificate used by the University of Queensland. It requires the contractor to confirm that all work has been completed safely, all hazards have been controlled, and the area is safe for occupation. It also notes that the contractor is liable for any accidents until official handover takes place and both the contractor and university representative must sign acknowledging the handover.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
179 views1 page

Handover

The document is a contractor site handover certificate used by the University of Queensland. It requires the contractor to confirm that all work has been completed safely, all hazards have been controlled, and the area is safe for occupation. It also notes that the contractor is liable for any accidents until official handover takes place and both the contractor and university representative must sign acknowledging the handover.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 1

Property and Facilities Division

Form
08/10
CONTRACTOR SITE HANDOVER CERTIFICATE FORM – Minor WorksPF398

PROJECT:.....................................................................................................................................................

LOCATION:....................................................................................................................................................

CONTRACTOR NAME:.................................................................................................................................

Work has been completed and the work site is safe for occupation of UQ staff and students.

 All hazards and potential hazards resulting from this work have been controlled,

 The area has been left in a safe condition.

Until hand over has taken place, the Contractor shall be solely liable for any accidents, injury, damage or loss
to any person, or to property of any person arising from the carrying out of these works. Hand over of site
will not be effective until this form has been completed.

Please provide list of plant and or equipment installed with this project.

I.e. Auto Door, Air Conditioning Plant, Fire Detectors etc.

.........................................................................................................................................................................

.........................................................................................................................................................................

.........................................................................................................................................................................

.........................................................................................................................................................................

Contractor Site Supervisor Signature:..............................................................................................................

Contractor Site Supervisor Name:...............................................................Date: ...........................................

Signature of Project Manager/Supervisor/Officer:............................................................................................

Name:......................................................................................................... Date: ...........................................

Distribution - Contractor, Project Officer -      , MES, MS, MMC, SPFA.

You might also like