Sr. No. Requirements: Ppap Check List

This document outlines the requirements for a PPAP checklist. It lists 18 requirements including design records, process documentation, test results, and samples. Key requirements include a customer drawing, process flow diagram, control plan, measurement system analysis studies, dimensional and performance test results, initial process study data, appearance approval report, and sample product. The checklist is to be prepared by a named individual and approved by a supervisor.

Uploaded by

kamlesh kuchekar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
421 views3 pages

Sr. No. Requirements: Ppap Check List

This document outlines the requirements for a PPAP checklist. It lists 18 requirements including design records, process documentation, test results, and samples. Key requirements include a customer drawing, process flow diagram, control plan, measurement system analysis studies, dimensional and performance test results, initial process study data, appearance approval report, and sample product. The checklist is to be prepared by a named individual and approved by a supervisor.

Uploaded by

kamlesh kuchekar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

PPAP CHECK LIST

Sr. No. Requirements


1 All Docs. As per index

PSW
1) Part No.
2 2) Revision No.
3) Run @ rate
4) Part Wt.
5) Signed Copy

3 Balooned Dwg./ Change request if any

PFD
4 1)Process including sub process & Supplier name
2)CC parameter must be mentioned
3)List of CC & SC parameter Siged out with weber.

PFMEA
1) As per PFD
5 2) fit from function parameter failure modes
3) correct rating & RPN
4) Top ten RPN must be need to list out.
5) Top RPN improvement Action plan from supplier.
6) SC &CC characteristics need to be highlighted.

Control Plan
1) As per PFMEA.
2) Production control plan need to submit.
3) All parameters must be included.
6 4) Correct selection of All instruments for all parameters.
5) Inspection frequency must be defined.
6) First piece inspection parameters must be same as per control plan.
7) Operation wise quality plan.
8)SC & CC parameter must be measured during first piece.If any third party inspection required so
define the frequency.

ISIR
1) all parameters including notes.
2) All dimensions must be within spec. by the correct instruments.
7 3) ISIR Summary shuold include list of nc parameters in ISIR.
4) ISIR must be signed off.
5) Material Test reports ,third party & Raw material Suppliers.
6) Salt spray report if applicable.
7) Outside lab report applicable for CC & SC parameter.

SPC & MSA


8 1) Include all SC & CC parameters.
2) Ppk value must be measured <1,69
3) MSA report for SPC parameter.
9 Packaging sign off including RPO specification (MSDS & TDS)

Prepared By Approved
Mr. k kamlakar Mr. Ajay m fasge
Document Checklist
S. NO Requirements S
WEBER Specific Documents (Part of CSR)
1 Process-cum-Inspection Planning Sheet (PIPS)
2 Packaging Data Sheet - Handling
3 Operation Wise Quality Plan
4 Special Process Validation
a. Qty despatched
b.Qty Rejected
5
c.CA -8D (to be submitted if Sample/Trial lot are rejected)
d. Deviation if any

PPAP Checklist
S. NO Requirements S
1 Customer Drawing (Design Record)
2 Engineering Change Document
3 Customer Engineering Approval
4 Design FMEA
5 Process Flow Diagram
6 Process FMEA
7 Control Plan
8 Measurement System Analysis Studies (MSA)
9 Dimensional Results
10 Material / Performance Test Results
11 Initial Process Study (SPC)
12 Quality Laboratory Documentation
13 Appearance Approval Report
14 Sample Product
15 Master Sample
16 Checking Aids
17 Customer Specific Requirements
Part Submission Warrant (PSW)
18
Bulk Material Requirement Checklist
Prepared By Approved By
Mr. S.A. Mane Mr. Atul Daptardar

S:-Submit, R:-Retain,NA:-Not Applicable