0% found this document useful (0 votes)
106 views

Tie in Procedure

metode penyambungan untuk pipa existing
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
106 views

Tie in Procedure

metode penyambungan untuk pipa existing
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 9
Total Sheet_9 Sheet Subcontractorname PT. Sepuluh Sumber Anugerah COMPANY's name PT PERTAMINA (Persero) Contractor JGC Consortium Plant Location Cilacap, Central Java, Indonesia Project name Cilacap Blue Sky Project Purchase Order No. _0-7289-2-P-3162-001-AE Equipment/Material name Piping and Tank Field installation Work Item number Document title Tie-In Procedure ee oe eee eee Teioei7 TTT ‘lacap Blue Sky Project (JOB No. : 07289-20000) No Comment ? ? from Owner y (EXT STATUS: FIFA FC, AB, NA PTMIYhw z ( 20DES BUT ESUBMISSION DATE, ¢ H See FESPONSIGLE DEPTIPERSON CPR EVIEW DATE CisoeC DT ‘Rpproved ‘Approved except Minor Comment Not Subject to Review purchase ORIG. PURCHASE ORDERNO, SERIAL REV, V- 3162-001-AE 610 3 PROMIS 28/03/2018 — 03:29PM 7. SEPULUH fea @ CILACAP BLUE SKY PROJECT UMBER ANUGERAH TIE-IN PROCEDURE Date: 13-00-17 | Page 20t9 REVISION LIST TABLE ‘The revisions ited Below have boon incorporated in ths copy ofthe document. revo. |seorion | PASE DESCRIPTION OF CHANGES 2 7 _|-7_[Wets in Deng or Coupon not ros sie pe 3 7 | fncororating FTR-PIP- 0037003005108

You might also like