Zed Purlin
Zed Purlins
and
Cee Sections
Manufactured to Your Satisfaction
Steel Sections
Steel Sections is one of the leading Contents
independent manufacturers of rollformed
section with over 40 years experience 3 Product Range
4 Zed Section Properties
Steel Sections offer Zed Purlins, Cee
Sections and Eaves Beams manufactured 5 Cee Section Properties
to customers specification, supplied cut to 6 Zed & Cee Systems
length and fully pierced.
7 Typical Purlin Layouts
Also available is a full range of accessories 8 Side Rail Restraint Systems
including Anti-Sag rods, Side Rails, Cleats
etc. 9 Purlin Cleats
Load Tables
Single point contact with our Sales and
Production team gives you the flexibility 10-11 Zed Purlin - Sleeved
and reassurance to amend and track the
12-13 Zed Purlin - Butted
progress of your order.
14-15 Zed Side Rails - Sleeved
Our expert knowledge, commitment to
quality, excellent service and competitive 16-17 Zed Side Rails - Butted
prices offer products second to none. 18 Cee Side Rails - Sleeved
19 Cee Side Rails - Butted
Accreditations
20-21 Eaves Beams
All of our Structural products are
22 Mezzanine Floors
CE marked
Our commitment to quality
is maintained by ISO:9001
accreditations
We are registered members of the
British Standards Institute
Advanced Steel
Product Range
Zed Purlin
Purlin Sleeve
System
Anti-Sag Rods
Eaves Beam
Side Rail
Butt System
Zed Purlin
Side Rail
3
Zed Section Properties
Y
X X D
Section Depth Thick- Top Bottom Top Bottom Wt/m. Area Major Axis Minor Axis Major Axis Minor Axis Major Axis Minor Axis Major Axis Minor Axis
Ref ness Flange Flange Lip Lip lxx lyy Zxx Zyy rgx rgy Mcx Mcy
P121-16 121 1.6 55 50 18 16 3.19 4.06 94.56 27.59 15.25 5.26 4.83 2.61 6.68 2.24
P140-14 140 1.4 55 50 18 16 3.00 3.83 116.82 24.46 16.3 4.64 5.3 2.54 6.7 2.11
P140-16 140 1.6 55 50 18 16 3.42 4.36 132.67 27.6 18.51 5.25 5.52 2.52 7.85 2.17
P140-18
140 1.8 55 50 18 16 3.84
4.89
148.32 30.65 20.7 5.84 5.51 2.50 9.19 2.48
P140-20 140 2 55 50 18 16 4.25 5.42 163.75 33.62 22.85 6.42 5.50 2.49 10.45 2.78
P140-25 140 2.5 55 50 18 16 5.28 6.73 201.45 40.68 28.11 7.8 5.47 2.46 13.44 3.49
P177-14 177 1.4 55 50 18 16 3.41 4.35 202.35 24.47 22.39 4.63 6.82 2.37 8.30 1.72
P177-16 177 1.6 55 50 18 16 3.89 4.95 229.99 27.61 25.45 5.23 6.81 2.36 10.15 2.03
P177-18 177 1.8 55 50 18 16 4.36 5.56 257.31 30.67 28.47 5.82 6.80 2.35 11.93 2.34
P177-20 177 2 55 50 18 16 4.84 6.16 284.32 33.64 31.46 6.4 6.79 2.34 13.63 2.64
P177-25 177 2.5 55 50 18 16 6.01 7.65 350.48 40.7 38.77 7.77 6.77 2.31 17.72 3.36
P200-14 200 1.4 61 55 17 17 3.78 4.82 285.53 31.65 28.07 5.36 7.70 2.56 9.59 1.89
P200-16 200 1.6 61 55 17 17 4.32 5.5 324.7 35.75 31.92 6.07 7.69 2.55 11.91 2.26
P200-18 200 1.8 61 55 17 17 4.84 6.17 363.47 39.74 35.73 6.75 7.68 2.54 14.17 2.62
P200-20
200 2 61 55 17 17 5.37
6.84
401.84 43.64 39.5 7.43 7.66 2.53 16.35 2.97
P200-25 200 2.5 61 55 17 17 6.67 8.5 496.04 52.94 48.75 9.05 7.64 2.50 21.54 3.82
P235-14 235 1.4 65 60 20 18 4.31 5.49 441.39 40.55 36.94 6.44 8.96 2.72 11.52 2.10
P235-16 235 1.6 65 60 20 18 4.92 6.27 502.24 45.84 42.03 7.29 8.95 2.70 14.54 2.55
P235-18 235 1.8 65 60 20 18 5.52 7.03 562.55 51.01 47.08 8.13 8.94 2.69 17.51 2.98
P235-20 235 2 65 60 20 18 6.12 7.8 622.32 56.06 52.08 8.94 8.93 2.68 20.41 3.41
P235-25 235 2.5 65 60 20 18 7.61 9.7 769.37 68.18 64.38 10.92 8.91 2.65 27.32 4.44
P265-14 265 1.4 65 60 20 18 4.64 5.91 587.81 40.55 43.67 6.43 9.97 2.62 12.82 1.94
P265-16 265 1.6 65 60 20 18 5.3 6.75 669.04 45.85 49.71 7.28 9.96 2.61 16.30 2.39
P265-18 265 1.8 65 60 20 18 5.95 7.57 749.6 51.02 55.69 8.11 9.95 2.60 19.74 2.83
P265-20 265 2 65 60 20 18 6.59 8.4 829.48 56.07 61.62 8.93 9.94 2.58 23.11 3.26
P265-25 265 2.5 65 60 20 18 8.2 10.45
1026.25 68.19 76.24 10.9 9.91 2.55 31.22 4.29
All sections are manufactured from pre-hot dipped galvanised steel coil to
BS EN 10346 with a minimum yield strength of 450 N/mm2 and Z275 coating.
4
Cee Section Properties
Y
a
X X
D
Section Depth Thick- Top Bottom Top Bottom Wt/m. Area Major Axis Minor Axis Major Axis Minor Axis Major Axis Minor Axis Major Axis Minor Axis
Ref ness Flange Flange Lip Lip lxx lyy Zxx Zyy rgx rgy Mcx Mcy
C140-14 140 1.4 65 65 15 15 3.24 4.12 132.12 23.86 18.87 5.37 5.66 2.41 6.61 2.40
C140-16 140 1.6 65 65 15 15 3.69 4.70 150.10 26.99 21.44 6.08 5.65 2.40 8.20 2.73
C140-18 140 1.8 65 65 15 15 4.14 5.27 167.86 30.05 23.98 6.77 5.64 2.39 9.77 3.05
C140-20 140 2 65 65 15 15 4.58 5.84 185.40 33.05 26.49 7.45 5.63 2.38 11.27 3.35
C140-25 140 2.5 65 65 15 15 5.69 7.25 228.29 40.27 32.61 9.08 5.61 2.36 14.74 4.09
C177-14 177 1.4 65 65 15 15 3.64 4.64 226.56 25.68 25.60 5.51 6.99 2.35 8.50 2.47
C177-16 177 1.6 65 65 15 15 4.15 5.29 257.59 29.05 29.11 6.24 6.98 2.34 10.59 2.80
C177-18 177 1.8 65 65 15 15 4.66 5.94 288.28 32.36 32.57 6.95 6.97 2.33 12.65 3.13
C177-20 177 2 65 65 15 15 5.17 6.58 318.64 35.59 36.00 7.64 6.96 2.33 14.65 3.44
C177-25 177 2.5 65 65 15 15 6.42 8.18 393.11 43.36 44.42 9.31 6.93 2.30 19.32 4.19
C200-14 200 1.4 65 65 15 15 3.89 4.96 301.05 26.62 30.11 5.58 7.79 2.32 9.66 2.50
C200-16 200 1.6 65 65 15 15 4.44 5.66 342.39 30.12 34.24 6.31 7.78 2.31 12.07 2.84
C200-18 200 1.8 65 65 15 15 4.99 6.35 383.33 33.54 38.33 7.03 7.77 2.30 14.45 3.16
C200-20 200 2 65 65 15 15 5.53 7.04 423.85 36.89 42.38 7.73 7.76 2.29 16.76 3.48
C200-25 200 2.5 65 65 15 15 6.87 8.75 523.37 44.95 52.34 9.43 7.73 2.27 22.23 4.24
C235-14 235 1.4 65 65 15 15 4.28 5.45 439.87 27.84 37.44 5.65 8.98 2.26 11.31 2.53
C235-16 235 1.6 65 65 15 15 4.88 6.22 500.49 31.50 42.59 6.40 8.97 2.25 14.23 2.88
C235-18 235 1.8 65 65 15 15 5.48 6.98 560.56 35.08 47.71 7.13 8.96 2.24 17.12 3.21
C235-20 235 2 65 65 15 15 6.08 7.74 620.08 38.58 52.77 7.84 8.95 2.23 19.95 3.53
C235-25 235 2.5 65 65 15 15 7.56 9.63 766.50 47.00 65.23 9.56 8.92 2.21 26.69 4.30
C265-14 265 1.4 65 65 15 15 4.61 5.87 585.32 28.73 44.17 5.71 9.98 2.21 12.58 2.56
C265-16 265 1.6 65 65 15 15 5.26 6.70 666.18 32.50 50.28 6.46 9.97 2.20 15.96 2.91
C265-18 265 1.8 65 65 15 15 5.90 7.52 746.35 36.19 56.33 7.20 9.96 2.19 19.32 3.24
C265-20 265 2 65 65 15 15 6.55 8.34 825.85 39.80 62.33 7.92 9.95 2.18 22.61 3.56
C265-25 265 2.5 65 65 15 15 8.14
10.38
1021.62 48.48 77.10 9.66 9.92 2.16 30.53 4.35
All sections are manufactured from pre-hot dipped galvanised steel coil to
BS EN 10346 with a minimum yield strength of 450 N/mm2 and Z275 coating.
5
Zed/Cee Systems
Details and Dimension
Holes and dimensions are for roof purlins and side rails, all dimensions in millimetres.
All holes 18mm for 16mm dia. bolts. Clearance joint between purlins/side rails 6mm.
‘Easy fix’ anti-sag rods may be required to give additional stability for spans over 4.5 metres.
Single Span
Bay Centre
6
32 Sleeved System
C Detailing Dimensions in mm
3 Wide Flange Wide Flange
Depth A B C D E F
B Depth
121 40 40 150 43 434 50
A
140 40 60 208 43 550 50
Narrow Flange
177 40 80 208 43 550 50
200 40 116 208 43 550 50
235 43 146 410 46 954 50
265 43 176 461 46 1054 50
Double Span
Bay Centre Bay Centre
6
32
32 32
C 70 C C
3 Wide Flange Wide Flange
With Overhang
6
70 32 32 70
C C
Wide Flange Wide Flange
Narrow Flange
Left Hand Right Hand
Overhang Overhang
B Depth
F D F
32 C 70 C 32
6
Typical Purlin Layouts
For roof slopes of 10° or more: – Sag rods should be fixed continuously over the apex
and fixed from the bottom hole to top hole down the slope. Easy-fix anti-sag rods
Below 10° pitch fixing is reversed: – Where the slope is below 10° then the sag rods
are fixed as shown below.
We also recommend that the lowest purlin is connected to the eaves structural member.
10º>
Eaves tie
<10º
7
Side Rail Restraint Systems
Side rail
support
constructed
from
45 x 45 x 2mm
angle
30 30
70 30 70
30
Bolt-On Cleat Prefix: BC Weld-On Cleat Prefix: WC
Thickness 6 6 6 6 8 8
C C Dimension A 50 50 50 50 50 50
B B
Dimension B 40 60 80 116 146 176
Hole Diameter 18 18 18 18 18 18
A A
Weld on cleats are supplied plain finish
50 75 Bolt on cleats are supplied Hot Dipped Galvanised
Weld On Cleat Bolt On Cleat
Thickness 6 6 6 6 6 6 A
Dimension A 120 120 120 120 120 120
B
Dimension B 40 40 40 40 40 40
Dimension B 30 30 30 30 30 30
Hole Diameter 18 18 18 18 18 18
36
30
10
Zed Purlin Sleeved Systems Grade S450
Span Section
UDL Allowable Loads (kN/sq.m) for Varying Purlin Centres (mm)
Metres kN 1000 1200 1375 1500 1675 1800 2000 2500
P200-16 13.92 2.32 1.93 1.69 1.55 1.39 1.29 1.16 0.93
P200-18 16.03 2.67 2.23 1.94 1.78 1.59 1.48 1.34 1.07
6.0m
P200-20 17.72 2.95 2.46 2.15 1.97 1.76 1.64 1.48 1.18
cont’d
P235-16 17.02 2.84 2.36 2.06 1.89 1.69 1.58 1.42 1.13
P235-18 20.52 3.42 2.85 2.49 2.28 2.04 1.90 1.71 1.37
P177-18 9.56 1.47 1.23 1.07 0.98 0.88 0.82 0.74 0.59
P177-20 10.56 1.63 1.35 1.18 1.08 0.97 0.90 0.81 0.65
P177-25 13.02 2.00 1.67 1.46 1.34 1.20 1.11 1.00 0.80
P200-16 12.14 1.87 1.56 1.36 1.25 1.12 1.04 0.93 0.75
P200-18 13.59 2.09 1.74 1.52 1.39 1.25 1.16 1.05 0.84
6.5m
P200-20 15.03 2.31 1.93 1.68 1.54 1.38 1.28 1.16 0.92
P200-25 18.54 2.85 2.38 2.07 1.90 1.70 1.59 1.43 1.14
P235-16 15.66 2.41 2.01 1.75 1.61 1.44 1.34 1.20 0.96
P235-18 18.89 2.91 2.42 2.11 1.94 1.74 1.61 1.45 1.16
P235-20 22.04 3.39 2.83 2.47 2.26 2.02 1.88 1.70 1.36
P265-16 17.57 2.70 2.25 1.97 1.80 1.61 1.50 1.35 1.08
P265-18 21.31 3.28 2.73 2.38 2.19 1.96 1.82 1.64 1.31
P200-16 10.41 1.49 1.24 1.08 0.99 0.89 0.83 0.74 0.59
P200-18 11.65 1.66 1.39 1.21 1.11 0.99 0.92 0.83 0.67
P200-20 12.88 1.84 1.53 1.34 1.23 1.10 1.02 0.92 0.74
P200-25 15.90 2.27 1.89 1.65 1.51 1.36 1.26 1.14 0.91
7.0m
P235-16 14.49 2.07 1.73 1.51 1.38 1.24 1.15 1.04 0.83
P235-18 17.49 2.50 2.08 1.82 1.67 1.49 1.39 1.25 1.00
P235-20 20.10 2.87 2.39 2.09 1.91 1.71 1.60 1.44 1.15
P235-25 24.85 3.55 2.96 2.58 2.37 2.12 1.97 1.77 1.42
P265-16 16.26 2.32 1.94 1.69 1.55 1.39 1.29 1.16 0.93
P265-18 19.74 2.82 2.35 2.05 1.88 1.68 1.57 1.41 1.13
P265-20 23.13 3.30 2.75 2.40 2.20 1.97 1.84 1.65 1.32
P200-18 10.08 1.34 1.12 0.98 0.90 0.80 0.75 0.67 0.54
P200-20 11.15 1.49 1.24 1.08 0.99 0.89 0.83 0.74 0.59
P200-25 13.76 1.83 1.53 1.33 1.22 1.10 1.02 0.92 0.73
7.5m
P235-16 13.48 1.80 1.50 1.31 1.20 1.07 1.00 0.90 0.72
P235-18 15.75 2.10 1.75 1.53 1.40 1.25 1.17 1.05 0.84
P235-20 17.43 2.32 1.94 1.69 1.55 1.39 1.29 1.16 0.93
P235-25 21.54 2.87 2.39 2.09 1.91 1.71 1.60 1.44 1.14
P265-16 15.13 2.02 1.68 1.47 1.34 1.20 1.12 1.01 0.81
P265-18 18.36 2.45 2.04 1.78 1.63 1.46 1.36 1.22 0.98
P265-20 21.53 2.87 2.39 2.09 1.91 1.71 1.59 1.44 1.15
P200-25 12.00 1.50 1.25 1.09 1.00 0.90 0.83 0.75 0.60
P235-16 12.29 1.54 1.28 1.12 1.02 0.92 0.85 0.77 0.61
P235-18 13.77 1.72 1.43 1.25 1.15 1.03 0.96 0.86 0.69
P235-20 15.23 1.90 1.59 1.38 1.27 1.14 1.06 0.95 0.76
8.0m
P235-25 18.83 2.35 1.96 1.71 1.57 1.40 1.31 1.18 0.94
P265-16 14.13 1.77 1.47 1.28 1.18 1.05 0.98 0.88 0.71
P265-18 17.16 2.14 1.79 1.56 1.43 1.28 1.19 1.07 0.86
P265-20 20.12 2.51 2.10 1.83 1.68 1.50 1.40 1.26 1.01
P265-23 23.34 2.92 2.43 2.12 1.95 1.74 1.62 1.46 1.17
P265-25 25.27 3.16 2.63 2.30 2.11 1.89 1.75 1.58 1.26
P235-18 12.12 1.43 1.19 1.04 0.95 0.85 0.79 0.71 0.57
P235-20 13.41 1.58 1.31 1.15 1.05 0.94 0.88 0.79 0.63
P235-25 16.57 1.95 1.62 1.42 1.30 1.16 1.08 0.97 0.78
8.5m
P265-16 13.25 1.56 1.30 1.13 1.04 0.93 0.87 0.78 0.62
P265-18 16.09 1.89 1.58 1.38 1.26 1.13 1.05 0.95 0.76
P265-20 18.00 2.12 1.76 1.54 1.41 1.26 1.18 1.06 0.85
P265-25 22.27 2.62 2.18 1.91 1.75 1.56 1.46 1.31 1.05
P235-20 11.87 1.32 1.10 0.96 0.88 0.79 0.73 0.66 0.53
P235-25 14.68 1.63 1.36 1.19 1.09 0.97 0.91 0.82 0.65
P265-16 12.47 1.39 1.15 1.01 0.92 0.83 0.77 0.69 0.55
9.0m
P265-18 14.43 1.60 1.34 1.17 1.07 0.96 0.89 0.80 0.64
P265-20 15.96 1.77 1.48 1.29 1.18 1.06 0.99 0.89 0.71
P265-25 19.75 2.19 1.83 1.60 1.46 1.31 1.22 1.10 0.88
P265-18 12.87 1.35 1.13 0.98 0.90 0.81 0.75 0.68 0.54
9.5m
P265-20 14.24 1.50 1.25 1.09 1.00 0.89 0.83 0.75 0.60
P265-25 17.61 1.85 1.54 1.35 1.24 1.11 1.03 0.93 0.74
P265-20 12.76 1.28 1.06 0.93 0.85 0.76 0.71 0.64 0.51
10.0m
P265-25 15.78 1.58 1.31 1.15 1.05 0.94 0.88 0.79 0.63
Performance
The performance of the systems shown in the table below have been
derived by calculation in accordance with BS EN 1993-1-3:2006.
Purlin load tables are valid up to and including 25° roof slopes.
Load Factors
Loading Factor
Dead load 1.40
Dead load restraining uplift or overturning 1.00
Dead load acting with wind and imposed loads combined 1.20
Imposed load 1.60
Imposed load acting with wind load 1.20
Wind load 1.40
Wind load acting with imposed load 1.20
Forces due to temperature effects 1.20
Drifting Snow 1.05
Span SectionUDL Allowable Loads (kN/sq.m) for Varying Purlin Centres (mm)
Metres kN 1000 1200 1375 1500 1675 1800 2000 2500
P121-16 6.64 1.90 1.58 1.38 1.27 1.13 1.05 0.95 0.76
P140-14 8.24 2.35 1.96 1.71 1.57 1.41 1.31 1.18 0.94
P140-16 9.36 2.67 2.23 1.94 1.78 1.60 1.49 1.34 1.07
3.5m P140-18 10.46 2.99 2.49 2.17 1.99 1.78 1.66 1.49 1.20
P140-20 11.55 3.30 2.75 2.40 2.20 1.97 1.83 1.65 1.32
P177-14 13.43 3.84 3.20 2.79 2.56 2.29 2.13 1.92 1.54
P177-16 16.29 4.65 3.88 3.38 3.10 2.78 2.59 2.33 1.86
P121-16 5.04 1.26 1.05 0.92 0.84 0.75 0.70 0.63 0.50
P140-14 6.27 1.57 1.31 1.14 1.04 0.94 0.87 0.78 0.63
P140-16 7.12 1.78 1.48 1.29 1.19 1.06 0.99 0.89 0.71
P140-18 7.96 1.99 1.66 1.45 1.33 1.19 1.11 0.99 0.80
4.0m P140-20 8.78 2.20 1.83 1.60 1.46 1.31 1.22 1.10 0.88
P177-14 10.93 2.73 2.28 1.99 1.82 1.63 1.52 1.37 1.09
P177-16 12.42 3.11 2.59 2.26 2.07 1.85 1.73 1.55 1.24
P177-18 13.90 3.47 2.89 2.53 2.32 2.07 1.93 1.74 1.39
P200-14 13.55 3.39 2.82 2.46 2.26 2.02 1.88 1.69 1.35
P200-16 16.84 4.21 3.51 3.06 2.81 2.51 2.34 2.11 1.68
P140-16 5.58 1.24 1.03 0.90 0.83 0.74 0.69 0.62 0.50
P140-18 6.24 1.39 1.15 1.01 0.92 0.83 0.77 0.69 0.55
P140-20 6.89 1.53 1.28 1.11 1.02 0.91 0.85 0.77 0.61
P140-25 8.47 1.88 1.57 1.37 1.25 1.12 1.05 0.94 0.75
P177-14 8.59 1.91 1.59 1.39 1.27 1.14 1.06 0.95 0.76
P177-16 9.76 2.17 1.81 1.58 1.45 1.30 1.21 1.08 0.87
4.5m P177-18 10.92 2.43 2.02 1.77 1.62 1.45 1.35 1.21 0.97
P177-20 12.07 2.68 2.23 1.95 1.79 1.60 1.49 1.34 1.07
P177-25 14.87 3.31 2.75 2.40 2.20 1.97 1.84 1.65 1.32
P200-14 12.01 2.67 2.22 1.94 1.78 1.59 1.48 1.33 1.07
P200-16 13.83 3.07 2.56 2.24 2.05 1.84 1.71 1.54 1.23
P200-18 15.49 3.44 2.87 2.50 2.29 2.05 1.91 1.72 1.38
P200-20 17.12 3.80 3.17 2.77 2.54 2.27 2.11 1.90 1.52
P140-20 5.52 1.10 0.92 0.80 0.74 0.66 0.61 0.55 0.44
P140-25 6.79 1.36 1.13 0.99 0.91 0.81 0.75 0.68 0.54
P177-14 6.91 1.38 1.15 1.01 0.92 0.83 0.77 0.69 0.55
P177-16 7.86 1.57 1.31 1.14 1.05 0.94 0.87 0.79 0.63
5.0m P177-18 8.79 1.76 1.46 1.28 1.17 1.05 0.98 0.88 0.70
P177-20 9.71 1.94 1.62 1.41 1.29 1.16 1.08 0.97 0.78
P177-25 11.97 2.39 1.99 1.74 1.60 1.43 1.33 1.20 0.96
P200-16 11.15 2.23 1.86 1.62 1.49 1.33 1.24 1.11 0.89
P200-18 12.48 2.50 2.08 1.82 1.66 1.49 1.39 1.25 1.00
P200-20 13.80 2.76 2.30 2.01 1.84 1.65 1.53 1.38 1.10
12
Zed Purlin Butt Systems Grade S450
Span Section
UDL Allowable Loads (kN/sq.m) for Varying Purlin Centres (mm)
Metres kN 1000 1200 1375 1500 1675 1800 2000 2500
P140-25 5.54 1.01 0.84 0.73 0.67 0.60 0.56 0.50 0.40
P177-16 6.44 1.17 0.98 0.85 0.78 0.70 0.65 0.59 0.47
P177-18 7.20 1.31 1.09 0.95 0.87 0.78 0.73 0.65 0.52
P177-20 7.96 1.45 1.21 1.05 0.96 0.86 0.80 0.72 0.58
5.5m
P177-25 9.81 1.78 1.49 1.30 1.19 1.06 0.99 0.89 0.71
P200-16 9.16 1.66 1.39 1.21 1.11 0.99 0.92 0.83 0.67
P200-18 10.25 1.86 1.55 1.36 1.24 1.11 1.04 0.93 0.75
P200-20 11.33 2.06 1.72 1.50 1.37 1.23 1.14 1.03 0.82
P200-25 13.98 2.54 2.12 1.85 1.69 1.52 1.41 1.27 1.02
P177-20 6.62 1.10 0.92 0.80 0.74 0.66 0.61 0.55 0.44
P177-25 8.16 1.36 1.13 0.99 0.91 0.81 0.76 0.68 0.54
P200-16 7.64 1.27 1.06 0.93 0.85 0.76 0.71 0.64 0.51
P200-18 8.55 1.42 1.19 1.04 0.95 0.85 0.79 0.71 0.57
6.0m
P200-20 9.45 1.57 1.31 1.15 1.05 0.94 0.87 0.79 0.63
P200-25 11.66 1.94 1.62 1.41 1.30 1.16 1.08 0.97 0.78
P235-14 10.47 1.75 1.45 1.27 1.16 1.04 0.97 0.87 0.70
P235-16 11.91 1.99 1.65 1.44 1.32 1.19 1.10 0.99 0.79
P235-18 13.34 2.22 1.85 1.62 1.48 1.33 1.24 1.11 0.89
P200-18 7.22 1.11 0.93 0.81 0.74 0.66 0.62 0.56 0.44
P200-20 7.98 1.23 1.02 0.89 0.82 0.73 0.68 0.61 0.49
P200-25 9.84 1.51 1.26 1.10 1.01 0.90 0.84 0.76 0.61
P235-14 8.86 1.36 1.14 0.99 0.91 0.81 0.76 0.68 0.55
P235-16 10.08 1.55 1.29 1.13 1.03 0.93 0.86 0.78 0.62
P235-18 11.29 1.74 1.45 1.26 1.16 1.04 0.97 0.87 0.70
6.5m
P235-20 12.49 1.92 1.60 1.40 1.28 1.15 1.07 0.96 0.77
P265-16 13.51 2.08 1.73 1.51 1.39 1.24 1.15 1.04 0.83
P265-18 15.14 2.33 1.94 1.69 1.55 1.39 1.29 1.16 0.93
P200-25 8.40 1.20 1.00 0.87 0.80 0.72 0.67 0.60 0.48
P235-16 8.63 1.23 1.03 0.90 0.82 0.74 0.68 0.62 0.49
P235-18 9.66 1.38 1.15 1.00 0.92 0.82 0.77 0.69 0.55
7.0m
P235-20 10.69 1.53 1.27 1.11 1.02 0.91 0.85 0.76 0.61
P265-16 11.58 1.65 1.38 1.20 1.10 0.99 0.92 0.83 0.66
P265-18 12.97 1.85 1.54 1.35 1.24 1.11 1.03 0.93 0.74
P265-20 14.35 2.05 1.71 1.49 1.37 1.22 1.14 1.03 0.82
P235-16 7.45 0.99 0.83 0.72 0.66 0.59 0.55 0.50 0.40
P235-18 8.34 1.11 0.93 0.81 0.74 0.66 0.62 0.56 0.44
P235-20 9.23 1.23 1.03 0.89 0.82 0.73 0.68 0.62 0.49
7.5m
P235-25 11.40 1.52 1.27 1.11 1.01 0.91 0.84 0.76 0.61
P265-16 10.01 1.34 1.11 0.97 0.89 0.80 0.74 0.67 0.53
P265-18 11.22 1.50 1.25 1.09 1.00 0.89 0.83 0.75 0.60
P265-20 12.41 1.66 1.38 1.20 1.10 0.99 0.92 0.83 0.66
P265-25 15.35 2.05 1.71 1.49 1.36 1.22 1.14 1.02 0.82
P235-25 9.92 1.24 1.03 0.9 0.83 0.74 0.69 0.62 0.50
P265-16 8.73 1.09 0.91 0.79 0.73 0.65 0.61 0.55 0.44
8.0m
P265-18 9.78 1.22 1.02 0.89 0.81 0.73 0.68 0.61 0.49
P265-20 10.82 1.35 1.13 0.98 0.90 0.81 0.75 0.68 0.54
P265-25 13.38 1.67 1.39 1.22 1.12 1.00 0.93 0.84 0.67
P235-25 8.68 1.02 0.85 0.74 0.68 0.61 0.57 0.51 0.41
P265-16 7.66 0.90 0.75 0.66 0.60 0.54 0.50 0.45 0.36
8.5m
P265-18 8.58 1.01 0.84 0.73 0.67 0.60 0.56 0.50 0.40
P265-20 9.49 1.12 0.93 0.81 0.74 0.67 0.62 0.56 0.45
P265-25 11.74 1.38 1.15 1.00 0.92 0.82 0.77 0.69 0.55
P265-18 7.57 0.84 0.70 0.61 0.56 0.50 0.47 0.42 0.34
9.0m
P265-20 8.37 0.93 0.78 0.68 0.62 0.56 0.52 0.47 0.37
P265-25 10.36 1.15 0.96 0.84 0.77 0.69 0.64 0.58 0.46
P265-20 7.42 0.78 0.65 0.57 0.52 0.47 0.43 0.39 0.31
9.5m
P265-25 9.18 0.97 0.81 0.70 0.64 0.58 0.54 0.48 0.39
P265-20 6.61 0.66 0.55 0.48 0.44 0.39 0.37 0.33 0.26
10.0m
P265-25 8.17 0.82 0.68 0.59 0.54 0.49 0.45 0.41 0.33
Types of Cladding
The loads shown relate directly to metal cladding and allowance for
its weight has been made. Figures shown are for horizontal wind
pressure and assume 1 row of side rail supports at mid span up to
6 metres and 2 rows for larger spans.
For suction multiply values by a factor of 0.8.
Span Section
UDL Allowable Loads (kN/sq.m) for Varying Purlin Centres (mm)
Metres kN 1000 1200 1375 1500 1675 1800 2000 2500
P121-16 15.72 4.49 3.74 3.27 2.99 2.68 2.49 2.25 1.80
P140-14 18.01 5.15 4.29 3.74 3.43 3.07 2.86 2.57 2.06
3.5m
P140-16 21.97 6.28 5.23 4.56 4.18 3.75 3.49 3.14 2.51
P140-18 24.69 7.05 5.88 5.13 4.70 4.21 3.92 3.53 2.82
P121-16 11.99 3.00 2.50 2.18 2.00 1.79 1.67 1.50 1.20
P140-14 14.85 3.71 3.09 2.70 2.48 2.22 2.06 1.86 1.49
4.0m
P140-16 16.87 4.22 3.51 3.07 2.81 2.52 2.34 2.11 1.69
P140-18 18.85 4.71 3.93 3.43 3.14 2.81 2.62 2.36 1.89
P121-16 9.43 2.10 1.75 1.52 1.40 1.25 1.16 1.05 0.84
P140-16 13.28 2.95 2.46 2.15 1.97 1.76 1.64 1.48 1.18
4.5m
P140-18 14.85 3.30 2.75 2.40 2.20 1.97 1.83 1.65 1.32
P140-20 16.39 3.64 3.04 2.65 2.43 2.17 2.02 1.82 1.46
P177-14 17.75 3.94 3.29 2.87 2.63 2.35 2.19 1.97 1.58
P177-16 21.79 4.84 4.03 3.52 3.23 2.89 2.69 2.42 1.94
P140-14 9.44 1.89 1.57 1.37 1.26 1.13 1.05 0.94 0.75
P140-16 10.71 2.14 1.79 1.56 1.43 1.28 1.19 1.07 0.86
P140-18 11.97 2.39 2.00 1.74 1.60 1.43 1.33 1.20 0.96
5.0m
P140-20 13.22 2.64 2.20 1.92 1.76 1.58 1.47 1.32 1.06
P177-14 15.82 3.16 2.64 2.30 2.11 1.89 1.76 1.58 1.27
P177-16 18.67 3.73 3.11 2.72 2.49 2.23 2.07 1.87 1.49
P140-14 7.76 1.41 1.18 1.03 0.94 0.84 0.78 0.71 0.56
P140-16 8.81 1.60 1.33 1.16 1.07 0.96 0.89 0.80 0.64
P140-18 9.85 1.79 1.49 1.30 1.19 1.07 0.99 0.90 0.72
5.5m
P140-20 10.87 1.98 1.65 1.44 1.32 1.18 1.10 0.99 0.79
P177-14 13.53 2.46 2.05 1.79 1.64 1.47 1.37 1.23 0.98
P177-16 15.38 2.80 2.33 2.03 1.86 1.67 1.55 1.40 1.12
P177-18 17.20 3.13 2.61 2.27 2.09 1.87 1.74 1.56 1.25
P140-16 7.36 1.23 1.02 0.89 0.82 0.73 0.68 0.61 0.49
P140-18 8.22 1.37 1.14 1.00 0.91 0.82 0.76 0.69 0.55
P140-20 9.08 1.51 1.26 1.10 1.01 0.90 0.84 0.76 0.61
P177-14 11.33 1.89 1.57 1.37 1.26 1.13 1.05 0.94 0.76
6.0m
P177-16 12.87 2.14 1.79 1.56 1.43 1.28 1.19 1.07 0.86
P177-18 14.40 2.40 2.00 1.75 1.60 1.43 1.33 1.20 0.96
P200-14 15.03 2.50 2.09 1.82 1.67 1.50 1.39 1.25 1.00
P200-16 18.24 3.04 2.53 2.21 2.03 1.81 1.69 1.52 1.22
P177-14 9.61 1.48 1.23 1.07 0.99 0.88 0.82 0.74 0.59
P177-16 10.91 1.68 1.40 1.22 1.12 1.00 0.93 0.84 0.67
P177-18 12.21 1.88 1.57 1.37 1.25 1.12 1.04 0.94 0.75
6.5m
P177-20 13.49 2.08 1.73 1.51 1.38 1.24 1.15 1.04 0.83
P200-14 13.62 2.10 1.75 1.52 1.40 1.25 1.16 1.05 0.84
P200-16 15.48 2.38 1.99 1.73 1.59 1.42 1.32 1.19 0.95
P200-18 17.33 2.67 2.22 1.94 1.78 1.59 1.48 1.33 1.07
P200-20 19.16 2.95 2.46 2.14 1.96 1.76 1.64 1.47 1.18
14
Zed Side Rail Sleeve Systems Grade S450
Span Section
UDL Allowable Loads (kN/sq.m) for Varying Purlin Centres (mm)
Metres kN 1000 1200 1375 1500 1675 1800 2000 2500
P177-16 9.36 1.34 1.11 0.97 0.89 0.80 0.74 0.67 0.53
P177-18 10.47 1.50 1.25 1.09 1.00 0.89 0.83 0.75 0.60
P177-20 11.56 1.65 1.38 1.20 1.10 0.99 0.92 0.83 0.66
7.0m
P200-16 13.29 1.90 1.58 1.38 1.27 1.13 1.05 0.95 0.76
P200-18 14.88 2.13 1.77 1.55 1.42 1.27 1.18 1.06 0.85
P200-20 16.44 2.35 1.96 1.71 1.57 1.40 1.31 1.17 0.94
P235-14 15.61 2.23 1.86 1.62 1.49 1.33 1.24 1.11 0.89
P235-16 19.76 2.82 2.35 2.05 1.88 1.69 1.57 1.41 1.13
P177-18 9.06 1.21 1.01 0.88 0.81 0.72 0.67 0.60 0.48
7.5m
P177-20 10.01 1.33 1.11 0.97 0.89 0.80 0.74 0.67 0.53
P200-16 11.52 1.54 1.28 1.12 1.02 0.92 0.85 0.77 0.61
P200-18 12.89 1.72 1.43 1.25 1.15 1.03 0.96 0.86 0.69
P200-20 14.25 1.90 1.58 1.38 1.27 1.13 1.06 0.95 0.76
P200-25 17.59 2.34 1.95 1.71 1.56 1.40 1.30 1.17 0.94
P235-16 17.40 2.32 1.93 1.69 1.55 1.39 1.29 1.16 0.93
P235-18 19.49 2.60 2.17 1.89 1.73 1.55 1.44 1.30 1.04
P200-16 10.07 1.26 1.05 0.92 0.84 0.75 0.70 0.63 0.50
P200-18 11.27 1.41 1.17 1.02 0.94 0.84 0.78 0.70 0.56
8.0m
P200-20 12.45 1.56 1.30 1.13 1.04 0.93 0.86 0.78 0.62
P200-25 15.37 1.92 1.60 1.40 1.28 1.15 1.07 0.96 0.77
P235-16 15.23 1.90 1.59 1.38 1.27 1.14 1.06 0.95 0.76
P235-18 17.05 2.13 1.78 1.55 1.42 1.27 1.18 1.07 0.85
P265-14 15.18 1.90 1.58 1.38 1.27 1.13 1.05 0.95 0.76
P265-16 19.42 2.43 2.02 1.77 1.62 1.45 1.35 1.21 0.97
P200-18 9.91 1.17 0.97 0.85 0.78 0.70 0.65 0.58 0.47
P200-20 10.96 1.29 1.07 0.94 0.86 0.77 0.72 0.64 0.52
P200-25 13.52 1.59 1.33 1.16 1.06 0.95 0.88 0.80 0.64
P235-16 13.42 1.58 1.32 1.15 1.05 0.94 0.88 0.79 0.63
8.5m
P235-18 15.03 1.77 1.47 1.29 1.18 1.06 0.98 0.88 0.71
P235-20 16.62 1.96 1.63 1.42 1.30 1.17 1.09 0.98 0.78
P235-25 20.54 2.42 2.01 1.76 1.61 1.44 1.34 1.21 0.97
P265-16 18.16 2.14 1.78 1.55 1.42 1.28 1.19 1.07 0.85
P265-18 20.78 2.44 2.04 1.78 1.63 1.46 1.36 1.22 0.98
P265-20 22.99 2.70 2.25 1.97 1.80 1.61 1.50 1.35 1.08
P200-20 9.70 1.08 0.90 0.78 0.72 0.64 0.60 0.54 0.43
P235-16 11.91 1.32 1.10 0.96 0.88 0.79 0.73 0.66 0.53
P235-18 13.33 1.48 1.23 1.08 0.99 0.88 0.82 0.74 0.59
9.0m
P235-20 14.74 1.64 1.37 1.19 1.09 0.98 0.91 0.82 0.66
P235-25 18.22 2.02 1.69 1.47 1.35 1.21 1.12 1.01 0.81
P265-16 16.47 1.83 1.53 1.33 1.22 1.09 1.02 0.92 0.73
P265-18 18.45 2.05 1.71 1.49 1.37 1.22 1.14 1.03 0.82
P265-20 20.41 2.27 1.89 1.65 1.51 1.35 1.26 1.13 0.91
P265-25 25.25 2.81 2.34 2.04 1.87 1.67 1.56 1.40 1.12
P235-18 11.89 1.25 1.04 0.91 0.83 0.75 0.70 0.63 0.50
P235-20 13.15 1.38 1.15 1.01 0.92 0.83 0.77 0.69 0.55
9.5m
P235-25 16.24 1.71 1.42 1.24 1.14 1.02 0.95 0.85 0.68
P265-16 14.71 1.55 1.29 1.13 1.03 0.92 0.86 0.77 0.62
P265-18 16.48 1.73 1.45 1.26 1.16 1.04 0.96 0.87 0.69
P265-20 18.23 1.92 1.60 1.40 1.28 1.15 1.07 0.96 0.77
P265-25 22.55 2.37 1.98 1.73 1.58 1.42 1.32 1.19 0.95
P235-20 11.78 1.18 0.98 0.86 0.79 0.70 0.65 0.59 0.47
P235-25 14.56 1.46 1.21 1.06 0.97 0.87 0.81 0.73 0.58
10.0m
P265-16 13.20 1.32 1.10 0.96 0.88 0.79 0.73 0.66 0.53
P265-18 14.79 1.48 1.23 1.08 0.99 0.88 0.82 0.74 0.59
P265-20 16.36 1.64 1.36 1.19 1.09 0.98 0.91 0.82 0.65
P265-25 20.23 2.02 1.69 1.47 1.35 1.21 1.12 1.01 0.81
Types of Cladding
The loads shown relate directly to metal cladding and
allowance for its weight has been made. Figures shown
are for horizontal wind pressure and assume 1 row of
side rail supports at mid span up to 6 metres and 2 rows
for larger spans.
For suction multiply values by a factor of 0.8.
Span Section
UDL Allowable Loads (kN/sq.m) for Varying Purlin Centres (mm)
Metres kN 1000 1200 1375 1500 1675 1800 2000 2500
P121-16 7.99 2.28 1.90 1.66 1.52 1.14 0.92 0.76 0.45
P140-14 9.91 2.83 2.36 2.06 1.89 1.41 1.14 0.94 0.56
3.5m
P140-16 11.25 3.21 2.68 2.34 2.14 1.60 1.30 1.07 0.64
P140-18 12.58 3.59 2.99 2.61 2.40 1.79 1.45 1.20 0.72
P177-14 17.14 4.90 4.08 3.56 3.27 2.44 1.98 1.63 0.97
P177-16 19.57 5.59 4.66 4.07 3.73 2.78 2.26 1.86 1.11
P121-16 6.08 1.52 1.27 1.11 1.01 0.76 0.61 0.51 0.30
P140-16 8.57 2.14 1.79 1.56 1.43 1.07 0.87 0.71 0.43
P140-18 9.58 2.39 2.00 1.74 1.60 1.19 0.97 0.80 0.48
4.0m
P140-20 10.58 2.64 2.20 1.92 1.76 1.32 1.07 0.88 0.53
P177-14 13.14 3.29 2.74 2.39 2.19 1.63 1.33 1.10 0.65
P177-16 14.94 3.73 3.11 2.72 2.49 1.86 1.51 1.24 0.74
P177-18 16.71 4.18 3.48 3.04 2.78 2.08 1.69 1.39 0.83
P140-14 5.93 1.32 1.10 0.96 0.88 0.66 0.53 0.44 0.26
P140-16 6.73 1.50 1.25 1.09 1.00 0.74 0.60 0.50 0.30
P140-18 7.52 1.67 1.39 1.22 1.11 0.83 0.68 0.56 0.33
P140-20 8.30 1.84 1.54 1.34 1.23 0.92 0.75 0.61 0.37
4.5m
P177-14 10.34 2.30 1.91 1.67 1.53 1.14 0.93 0.77 0.46
P177-16 11.75 2.61 2.18 1.90 1.74 1.30 1.06 0.87 0.52
P177-18 13.15 2.92 2.43 2.12 1.95 1.45 1.18 0.97 0.58
P177.20 14.52 3.23 2.69 2.35 2.15 1.61 1.30 1.08 0.64
P200-16 16.64 3.70 3.08 2.69 2.47 1.84 1.49 1.23 0.74
P140-16 5.40 1.08 0.90 0.79 0.72 0.54 0.44 0.36 0.22
P140-18 6.04 1.21 1.01 0.88 0.81 0.60 0.49 0.40 0.24
P140-20 6.67 1.33 1.11 0.97 0.89 0.66 0.54 0.44 0.27
P140-25 8.20 1.64 1.37 1.19 1.09 0.82 0.66 0.55 0.33
5.0m
P177-14 8.33 1.67 1.39 1.21 1.11 0.83 0.67 0.56 0.33
P177-16 9.47 1.89 1.58 1.38 1.26 0.94 0.77 0.63 0.38
P177-18 10.59 2.12 1.76 1.54 1.41 1.05 0.86 0.71 0.42
P177-20 11.70 2.34 1.95 1.70 1.56 1.16 0.95 0.78 0.47
P200-14 11.81 2.36 1.97 1.72 1.57 1.17 0.95 0.79 0.47
P200-16 13.42 2.68 2.24 1.95 1.79 1.34 1.08 0.89 0.53
P200-18 15.02 3.00 2.50 2.19 2.00 1.49 1.21 1.00 0.60
P140-20 5.45 0.99 0.83 0.72 0.66 0.49 0.40 0.33 0.20
P140-25 6.71 1.22 1.02 0.89 0.81 0.61 0.49 0.41 0.24
P177-14 6.84 1.24 1.04 0.90 0.83 0.62 0.50 0.41 0.25
P177-16 7.77 1.41 1.18 1.03 0.94 0.70 0.57 0.47 0.28
P177-18 8.69 1.58 1.32 1.15 1.05 0.79 0.64 0.53 0.31
5.5m
P200-14 9.71 1.77 1.47 1.28 1.18 0.88 0.71 0.59 0.35
P200-16 11.04 2.01 1.67 1.46 1.34 1.00 0.81 0.67 0.40
P200-18 12.35 2.25 1.87 1.63 1.50 1.12 0.91 0.75 0.45
P200-20 13.65 2.48 2.07 1.81 1.66 1.24 1.00 0.83 0.49
16
Zed Side Rail Butt System Grade S450
Span Section
UDL Allowable Loads (kN/sq.m) for Varying Purlin Centres (mm)
Metres kN 1000 1200 1375 1500 1675 1800 2000 2500
P177-18 7.25 1.21 1.01 0.88 0.81 0.60 0.49 0.40 0.24
P177-20 8.01 1.33 1.11 0.97 0.89 0.66 0.54 0.44 0.27
P177-25 9.87 1.64 1.37 1.20 1.10 0.82 0.66 0.55 0.33
P200-16 9.22 1.54 1.28 1.12 1.02 0.76 0.62 0.51 0.31
6.0m
P200-18 10.31 1.72 1.43 1.25 1.15 0.86 0.69 0.57 0.34
P200-20 11.40 1.90 1.58 1.38 1.27 0.95 0.77 0.63 0.38
P235-14 12.18 2.03 1.69 1.48 1.35 1.01 0.82 0.68 0.40
P235-16 14.36 2.39 1.99 1.74 1.60 1.19 0.97 0.80 0.48
P235-18 16.08 2.68 2.23 1.95 1.79 1.33 1.08 0.89 0.53
P177-20 6.76 1.04 0.87 0.76 0.69 0.52 0.42 0.35 0.21
P177-25 8.32 1.28 1.07 0.93 0.85 0.64 0.52 0.43 0.25
P200-16 7.80 1.20 1.00 0.87 0.80 0.60 0.48 0.40 0.24
P200-18 8.72 1.34 1.12 0.98 0.89 0.67 0.54 0.45 0.27
6.5m
P200-20 9.64 1.48 1.24 1.08 0.99 0.74 0.60 0.49 0.30
P235-14 10.70 1.65 1.37 1.20 1.10 0.82 0.67 0.55 0.33
P235-16 12.17 1.87 1.56 1.36 1.25 0.93 0.76 0.62 0.37
P235-18 13.63 2.10 1.75 1.52 1.40 1.04 0.85 0.70 0.42
P235-20 15.07 2.32 1.93 1.69 1.55 1.15 0.94 0.77 0.46
P177-25 7.10 1.01 0.84 0.74 0.68 0.50 0.41 0.34 0.20
P200-18 7.46 1.07 0.89 0.77 0.71 0.53 0.43 0.36 0.21
P200-20 8.24 1.18 0.98 0.86 0.78 0.59 0.48 0.39 0.23
P200-25 10.17 1.45 1.21 1.06 0.97 0.72 0.59 0.48 0.29
P235-14 9.17 1.31 1.09 0.95 0.87 0.65 0.53 0.44 0.26
7.0m
P235-16 10.43 1.49 1.24 1.08 0.99 0.74 0.60 0.50 0.30
P235-18 11.67 1.67 1.39 1.21 1.11 0.83 0.67 0.56 0.33
P235-20 12.91 1.84 1.54 1.34 1.23 0.92 0.75 0.61 0.37
P265-14 10.52 1.50 1.25 1.09 1.00 0.75 0.61 0.50 0.30
P265-16 13.97 2 .00 1.66 1.45 1.33 0.99 0.81 0.67 0.40
P235-16 9.02 1.20 1.00 0.87 0.80 0.60 0.49 0.40 0.24
P235-18 10.10 1.35 1.12 0.98 0.90 0.67 0.54 0.45 0.27
P235-20 11.16 1.49 1.24 1.08 0.99 0.74 0.60 0.50 0.30
7.5m
P235-25 13.80 1.84 1.53 1.34 1.23 0.92 0.74 0.61 0.37
P265-16 12.10 1.61 1.34 1.17 1.08 0.80 0.65 0.54 0.32
P265-18 13.55 1.81 1.51 1.31 1.20 0.90 0.73 0.60 0.36
P265-20 14.99 2.00 1.67 1.45 1.33 0.99 0.81 0.67 0.40
P265.25 18.55 2.47 2.06 1.80 1.65 1.23 1.00 0.82 0.49
P235-18 8.80 1.10 0.92 0.80 0.73 0.55 0.44 0.37 0.22
P235-20 9.73 1.22 1.01 0.88 0.81 0.60 0.49 0.41 0.24
P235-25 12.02 1.50 1.25 1.09 1.00 0.75 0.61 0.50 0.30
8.0m
P265-16 10.56 1.32 1.10 0.96 0.88 0.66 0.53 0.44 0.26
P265-18 11.83 1.48 1.23 1.08 0.99 0.74 0.60 0.49 0.29
P265-20 13.09 1.64 1.36 1.19 1.09 0.81 0.66 0.55 0.33
P265-25 16.19 2.02 1.69 1.47 1.35 1.01 0.82 0.67 0.40
P265-16 9.28 1.09 0.91 0.79 0.73 0.54 0.44 0.36 0.22
P265-18 10.40 1.22 1.02 0.89 0.82 0.61 0.49 0.41 0.24
8.5m
P265-20 11.50 1.35 1.13 0.98 0.90 0.67 0.55 0.45 0.27
P265-25 14.23 1.67 1.39 1.22 1.12 0.83 0.68 0.56 0.33
P265-16 8.21 0.91 0.76 0.66 0.61 0.45 0.37 0.30 0.18
P265-18 9.19 1.02 0.85 0.74 0.68 0.51 0.41 0.34 0.20
9.0m
P265-20 10.17 1.13 0.94 0.82 0.75 0.56 0.46 0.38 0.22
P265-25 12.57 1.40 1.16 1.02 0.93 0.70 0.56 0.47 0.28
P265-20 9.04 0.95 0.79 0.69 0.63 0.47 0.38 0.32 0.19
9.5m
P265-25 11.17 1.18 0.98 0.86 0.78 0.59 0.48 0.39 0.23
P265-20 8.06 0.81 0.67 0.59 0.54 0.40 0.33 0.27 0.16
10.0m
P265-25 9.97 1.00 0.83 0.72 0.66 0.50 0.40 0.33 0.20
18
Cee Side Rail Butt System Grade S450
Span Section
UDL Allowable Loads (kN/sq.m) for Varying Purlin Centres (mm)
Metres kN 1000 1200 1375 1500 1675 1800 2000 2500
C140-14 11.21 3.20 2.67 2.33 2.14 1.91 1.78 1.60 1.28
3.5m
C140-16 12.73 3.64 3.03 2.65 2.43 2.17 2.02 1.82 1.46
C140-14 8.54 2.14 1.78 1.55 1.42 1.27 1.19 1.07 0.85
4.0m
C140-16 9.70 2.43 2.02 1.76 1.62 1.45 1.35 1.21 0.97
C140-14 6.71 1.49 1.24 1.08 0.99 0.89 0.83 0.75 0.60
C140-16 7.62 1.69 1.41 1.23 1.13 1.01 0.94 0.85 0.68
C140-18 8.52 1.89 1.58 1.38 1.26 1.13 1.05 0.95 0.76
4.5m
C140-20 9.41 2.09 1.74 1.52 1.39 1.25 1.16 1.05 0.84
C177-14 11.58 2.57 2.14 1.87 1.72 1.54 1.43 1.29 1.03
C177-16 13.17 2.93 2.44 2.13 1.95 1.75 1.63 1.46 1.17
C140-18 6.84 1.37 1.14 1.00 0.91 0.82 0.76 0.68 0.55
C140-20 7.56 1.51 1.26 1.10 1.01 0.90 0.84 0.76 0.60
C177-14 9.33 1.87 1.56 1.36 1.24 1.11 1.04 0.93 0.75
5.0m
C177-16 10.61 2.12 1.77 1.54 1.41 1.27 1.18 1.06 0.85
C177-18 11.87 2.37 1.98 1.73 1.58 1.42 1.32 1.19 0.95
C200-16 14.16 2.83 2.36 2.06 1.89 1.69 1.57 1.42 1.13
C140-25 7.61 1.38 1.15 1.01 0.92 0.83 0.77 0.69 0.55
C177-16 8.71 1.58 1.32 1.15 1.06 0.95 0.88 0.79 0.63
C177-18 9.75 1.77 1.48 1.29 1.18 1.06 0.98 0.89 0.71
5.5m
C177-20 10.78 1.96 1.63 1.43 1.31 1.17 1.09 0.98 0.78
C200-16 11.64 2.12 1.76 1.54 1.41 1.26 1.18 1.06 0.85
C200-18 13.03 2.37 1.97 1.72 1.58 1.41 1.32 1.18 0.95
C177-16 7.27 1.21 1.01 0.88 0.81 0.72 0.67 0.61 0.48
C177-18 8.13 1.36 1.13 0.99 0.90 0.81 0.75 0.68 0.54
6.0m
C177-20 8.99 1.50 1.25 1.09 1.00 0.89 0.83 0.75 0.60
C200-16 9.72 1.62 1.35 1.18 1.08 0.97 0.90 0.81 0.65
C200-18 10.88 1.81 1.51 1.32 1.21 1.08 1.01 0.91 0.73
C200-20 12.03 2.01 1.67 1.46 1.34 1.20 1.11 1.00 0.80
C200-16 8.22 1.27 1.05 0.92 0.84 0.76 0.70 0.63 0.51
C200-18 9.20 1.42 1.18 1.03 0.94 0.85 0.79 0.71 0.57
6.5m
C200-20 10.18 1.57 1.30 1.14 1.04 0.93 0.87 0.78 0.63
C235-16 12.12 1.86 1.55 1.36 1.24 1.11 1.04 0.93 0.75
C235-18 13.85 2.09 1.74 1.52 1.39 1.25 1.16 1.04 0.84
C200-25 10.74 1.53 1.28 1.12 1.02 0.92 0.85 0.77 0.61
C235-16 10.39 1 .48 1.24 1.08 0.99 0.89 0.82 0.74 0.59
C235-18 11.63 1.66 1.38 1.21 1.11 0.99 0.92 0.83 0.66
7.0m
C235-20 12.87 1.84 1.53 1.34 1.23 1.10 1.02 0.92 0.74
C265-16 13.17 1.88 1.57 1.37 1.25 1.12 1.05 0.94 0.75
C265-18 15.58 2.23 1.85 1.62 1.48 1.33 1.24 1.11 0.89
C200-25 9.26 1.23 1.03 0.90 0.82 0.74 0.69 0.62 0.49
C235-18 10.06 1.34 1.12 0.98 0.89 0.80 0.74 0.67 0.54
7.5m
C235-20 11.12 1.48 1.24 1.08 0.99 0.89 0.82 0.74 0.59
C265-16 11.59 1.55 1.29 1.12 1.03 0.92 0.86 0.77 0.62
C265-18 13.49 1.80 1.50 1.31 1.20 1.07 1.00 0.90 0.72
C235-18 8.76 1.10 0.91 0.80 0.73 0.65 0.61 0.55 0.44
C235-20 9.69 1.21 1.01 0.88 0.81 0.72 0.67 0.61 0.48
8.0m
C265-18 11.78 1.47 1.23 1.07 0.98 0.88 0.82 0.74 0.59
C265-20 13.03 1.63 1.36 1.18 1.09 0.97 0.90 0.81 0.65
C235-18 7.69 0.90 0.75 0.66 0.60 0.54 0.50 0.45 0.36
C235-20 8.50 1.00 0.83 0.73 0.67 0.60 0.56 0.50 0.40
8.5m
C265-16 8.86 1.04 0.87 0.76 0.69 0.62 0.58 0.52 0.42
C265-18 10.35 1.22 1.01 0.89 0.81 0.73 0.68 0.61 0.49
C235-25 9.27 1.03 0.86 0.75 0.69 0.61 0.57 0.51 0.41
9.0m
C265-18 9.15 1.02 0.85 0.74 0.68 0.61 0.56 0.51 0.41
C265-20 10.12 1.12 0.94 0.82 0.75 0.67 0.62 0.56 0.45
C265-20 8.99 0.95 0.79 0.69 0.63 0.57 0.53 0.47 0.38
9.5m
C265-25 11.12 1.17 0.98 0.85 0.78 0.70 0.65 0.59 0.47
C265-20 8.03 0.80 0.67 0.58 0.54 0.48 0.45 0.40 0.32
10.0m
C265-25 9.92 0.99 0.83 0.72 0.66 0.59 0.55 0.50 0.40
19
Eaves Beam Grade S450
190mm deep x 2.0mm thick and has been designed to cater for spans up to
8m long, with an angled top flange from 0º to 25º
100 y
0º - 25º 19
25
Radius of Gyration
30º Major Axis Rxx cm 7.7
Minor Axis Ryy cm 3.3
Moment of Capacity
40 Major Axis Mcx kNm 21.6
Minor Axis Mcy kNm 5.8
19
34.4
100 y
BAY CENTRE
3 3
0º - 25º
FACE C 190 70
65
80 35
35 50
Holes in underside
optional for
side rail support
20
Eaves Beam Grade S450
BAY CENTRE
3 3 FACE C Roof
HOLES 18mm DIA
Slope
o o
0 - 25
FACE C
B
DEPTH
t
A
D
35 80 35 = =
Holes in underside C
optional for side rail
support
Radius of Gyration
Major Axis Rxx cm 7.8 8.7 10.5 10.5
Minor Axis Ryy cm 3.7 3.2 3.5 3.5
Moment of Capacity
Major Axis Mcx kNm 21.7 25 29.2 42.6
Minor Axis Mcy kNm 6.2 5.0 6.1 8.1
Stiffening Cleat
Counterformed
holes are available
Packer Plates
available for use with
counterformed holes
21
Mezzanine Floor Systems
Steel Sections Cee Sections have a wide range of applications, primarily for use within mezzanine floors, our Cee sections
can also be used for door framing, roof trimming, window trimming parapet rails and side rails. Our mezzanine floor beams
are available in the following depths of 140, 177, 200, 235 and 265mm. Our sections are all punched with 18mm diameter
holes as standard, with smaller hole sizes available on request along with the option of counterformed holes.
Restraint Requirements
Beam Centres
Single span cee sections are more com- Is used when floor depth isn’t an issue,
monly used due to the floor depth restric- the benefits with this system is using a
tions. The cee sections are fitted within the continuous spanning cee section will mean
depth of the primary steelwork keeping the reduced deflections and in turn will lead to
floor depth to a minimum. Our inset cleats using a reduced section size. Standard cleats
are best used for this case, please ensure can be used with this system.
the cleat projects beyond the flange of the
primary steelwork to allow an adequate
fixing to our cee section.
IDEAL FOR:
AGRICULTURAL
INDUSTRIAL &
COMMERCIAL BUILDINGS