0% found this document useful (0 votes)
137 views3 pages

5

This document contains a 10 question quiz on software engineering topics like software maintenance processes, development lifecycles, peer reviews, and software evolution. For each question there are multiple choice answers to select from. The quiz is assessing the student's knowledge on key phases, activities, and concepts in software engineering.

Uploaded by

jeancel carano-o
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
137 views3 pages

5

This document contains a 10 question quiz on software engineering topics like software maintenance processes, development lifecycles, peer reviews, and software evolution. For each question there are multiple choice answers to select from. The quiz is assessing the student's knowledge on key phases, activities, and concepts in software engineering.

Uploaded by

jeancel carano-o
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

7/6/2019 Quiz 006


Dashboard My courses CS-372-LEC-1913T Week 13: Quiz Quiz 006


Question 1 A software maintenance process wherein by confirming the

Not yet modified work with the individual who submitted the request, it
answered could ensure that the modification provided a solution.
 Marked out of
1.00
Select one:
 a. Haskell/ CoffeeScript

 b. Acceptance and modification process

c. Marketing
 d. None of the Choices

Question 2 This contains software preparation and transition activities,


Not yet such as the conception and creation of the maintenance plan.
answered

Marked out of Select one:


1.00
a. Implementation process

b. None of the Choices

c. Acceptance and modification process

d. Transition

Question 3 It is important to establish quality priorities and release criteria


Not yet for the project so that a plan is constructed to help the team
answered
achieve quality software.
Marked out of
1.00
Select one:
a. System operations and support

b. None of the Choices

c. Data migration

d. Quality and defects management

Question 4 Programming is a fraction of the total project effort, but it is


Not yet often the most visible. Other work equally important includes
answered requirements, architecture, analysis, design, and test.
Marked out of
1.00
Select one:
a. None of the Choices

b. Development process

c. Construction of code

d. System operations and support

https://blended.amauonline.com/mod/quiz/attempt.php?attempt=471057&cmid=13131 1/3
7/6/2019 Quiz 006

Question 5 A maintenance activity wherein modifying the system to cope


Not yet with changes in the software environment is done to ensure
answered
that the system is up to date.
Marked out of
 1.00
Select one:
a. Transition

b. Adaptive
 c. None of the Choices

d. Preventive


Question 6 Even with a good architecture, it is still possible to have a bad
 Not yet design. Many applications are either over-designed or under-
answered designed.
Marked out of
 1.00
Select one:

 a. Construction of code

b. None of the Choices



c. Design

d. Development process

Question 7 It is important to review other people's work. Experience has


Not yet shown that problems are eliminated earlier this way and
answered
reviews are as effective or even more effective than testing.
Marked out of
1.00
Select one:
a. Peer reviews

b. None of the Choices

c. Testing

d. Configuration management

Question 8 It is important to choose the appropriate development lifecycle


Not yet process to the project at hand because all other activities are
answered
derived from the process.
Marked out of
1.00
Select one:
a. Requirement

b. None of the Choices

c. Development process

d. Design

Question 9 A controlled and coordinated sequence of activities during


Not yet which a system is transferred progressively from the developer
answered to the maintainer.
Marked out of
1.00
Select one:
a. Marketing

b. Transition

c. None of the Choices

d. Haskell/ CoffeeScript

https://blended.amauonline.com/mod/quiz/attempt.php?attempt=471057&cmid=13131 2/3
7/6/2019 Quiz 006

Question 10 He first addressed the Software maintenance and evolution of


Not yet systems in 1969.
answered

Marked out of Select one:


 1.00
a. None of the Choices

 b. Preventive maintenance

c. Transition

d. Meir M. Lehman

 Stay in touch
 AMA EDUCATION SYSTEM
 https://amakto12.freshdesk.com/support/login

https://blended.amauonline.com/mod/quiz/attempt.php?attempt=471057&cmid=13131 3/3

You might also like