Control of Documents
Control of Documents
Procedure
Control of Documents
Revision History
Revision Description of
DATE Initiated By Completed By
No# Changes
1st Oct 2016 Management Integration for ISO Management
01 Representative 14001 and OHSAS Representative
18001
Distribution List
Sr. No/ Designation Issue Date Distributed by
Management Management
01 1st Oct 2016
Representative Representative
Management
02 CEO 1st Oct 2016
Representative
03 Management
Chairman 1st Oct 2016
Representative
Revision Document
Document Issue Revision Original Document Document
Issue Reviewed
Number Number Number Issue Date Prepared By Approved By
Date by
Management
CEO Chairman
Representative
AJB-IMS-PR-01 1.1 01 01-01-16 01-10-16
Copyright
This document contains confidential information. It may be copied in full or in parts only by Al-Jaber
International Company and only for the purpose of Al-Jaber International Company related activities.
Disclosure of any information contained within this procedure to any person (s) outside the employee of Al-
Jaber International Company without written permission of the Top Management is strictly prohibited.
Page 1 of 8
Al-Jaber International Company
System for Control of documents
Original Issue Date: Revision Issue date:
Doc. No: AJB-IMS-PR-01 Issue Number: 01 Revision Number: 01
01st January 2016 01st October 2016
Contents
This document is the property of Al-Jaber International Company. Any copying and distribution of this
document without the approval of the Management is prohibited. Page 2 of 8
Al-Jaber International Company
System for Control of documents
Original Issue Date: Revision Issue date:
Doc. No: AJB-IMS-PR-01 Issue Number: 01 Revision Number: 01
01st January 2016 01st October 2016
1. Purpose
c) To control that document requiring changes are revised and received the
required approvals.
2. Scope
The scope of this procedure is controlling various procedures, formats and all type of
This document is the property of Al-Jaber International Company. Any copying and distribution of this
document without the approval of the Management is prohibited. Page 3 of 8
Al-Jaber International Company
System for Control of documents
Original Issue Date: Revision Issue date:
Doc. No: AJB-IMS-PR-01 Issue Number: 01 Revision Number: 01
01st January 2016 01st October 2016
3. Responsibilities
4. Procedure
4.1 Document Coding:
Company Logo
Where:
This document is the property of Al-Jaber International Company. Any copying and distribution of this
document without the approval of the Management is prohibited. Page 4 of 8
Al-Jaber International Company
System for Control of documents
Original Issue Date: Revision Issue date:
Doc. No: AJB-IMS-PR-01 Issue Number: 01 Revision Number: 01
01st January 2016 01st October 2016
All documents will be initially provided with Rev: 00 for initial release, any further
revision will be followed by Rev. 1 for 1st revision and numerically increases for
further revisions.
We set up a limit of revision numbers and then go for a complete change of issue.
We have set the limit of 05 revisions in any documents, the first issue having an
issue no. 01, and revision 00, then till revision no 05, the same issue no. 01 will be
continued. Immediately the revision no. reaches 06, we will do an issue change
and the current status of the document will be Issue no. 02 and revision no. 00.
AAA-BB-XX-YY-ZZ
e.g.: (AJB-HR-FM-01-01)
Where:
AAA is the code of the Company Name .
BB is the code of the Department / Section.
XX is the abbreviation of Form.
YY is code of Procedure.
ZZ is Form Number
This document is the property of Al-Jaber International Company. Any copying and distribution of this
document without the approval of the Management is prohibited. Page 5 of 8
Al-Jaber International Company
System for Control of documents
Original Issue Date: Revision Issue date:
Doc. No: AJB-IMS-PR-01 Issue Number: 01 Revision Number: 01
01st January 2016 01st October 2016
4.3 Document Approval (Level 1, 2):
Documents are written by the appropriate person, involved with the activity.
Approvals:
a) IMS (QHSE) Policies, Objectives, Manuals and Procedures are approved by the
Managing Director.
b) Other than above mention documents, all documents are approved by the MR /
MD / HOD
The original document, signed and dated, retained in the Main IMS Files. These
Master files and comprises separate folders for each department, containing all
the IMS system documents for that department.
All documents are recorded on a “Master List of Controlled Documents”, (AJB-
IMS-FM-01-01.
4.1.2 Changes in the documents are necessitated under the following circumstances:
This document is the property of Al-Jaber International Company. Any copying and distribution of this
document without the approval of the Management is prohibited. Page 6 of 8
Al-Jaber International Company
System for Control of documents
Original Issue Date: Revision Issue date:
Doc. No: AJB-IMS-PR-01 Issue Number: 01 Revision Number: 01
01st January 2016 01st October 2016
4.2.1 All documents having with old revisions are either disposed-off or kept in a record
for fixed time duration wherever applicable.
The procedures with related formats are distributed among all concerned departments
for reference purpose and there record is entered in “Documents Distribution List”
(AJB-IMS-FM-001-03).
4.5Minor Changes:
This document is the property of Al-Jaber International Company. Any copying and distribution of this
document without the approval of the Management is prohibited. Page 7 of 8
Al-Jaber International Company
System for Control of documents
Original Issue Date: Revision Issue date:
Doc. No: AJB-IMS-PR-01 Issue Number: 01 Revision Number: 01
01st January 2016 01st October 2016
5. RELATED RECORDS:
a) Master List of Controlled Documents AJB-IMS-FM-001-01
b) Master List of External Origin Documents AJB-IMS-FM-001-02
c) Document Distribution Lists AJB-IMS-FM-001-03
d) Change / Disposition Form AJB-IMS-FM-001-04
This document is the property of Al-Jaber International Company. Any copying and distribution of this
document without the approval of the Management is prohibited. Page 8 of 8