Transit Camp BOQ 14-05-2019
Transit Camp BOQ 14-05-2019
Transit Camp BOQ 14-05-2019
Sr.
Item Code
No.
Architectural BOQ
1 33.18
2 33.27
3 33.67
4 33.24
5 33.38
6 33.48
7 35.21
8 35.13
9 36.11
As per wording
of the item and
10
as directed by
PMC/Client
11 27.16+32.11
12 R2-CS-WW-31
13 39.10
14 39.02
15 39.58
16 39.68
17 39.37
Structural BOQ for 34 Un
Structure - Ground + 22 Floor
Approximate Construction Area in Sf
Sr No
1.0
1.1
i
ii
iii
iv
1.2
i
ii
iii
iv
1.3
1.3.1
1.3.2
2.0
2.1
2.2
3.0
i
ii
iii
iv
v
vi
vii
viii
ix
x
3.1
i
ii
iii
3.2
3.2.1
i
3.2.2
i
ii
iii
iv
v
vi
vii
viii
ix
x
xi
3.2.3
3.2.4
4.0
a
b
c
d
e
i
ii
iii
iv
v
vi
vii
viii
ix
x
5.0
6.0
i
ii
iii
iv
v
vi
vii
viii
ix
6.1
6.2
i
ii
ii
7.0
i
ii
8.0
i
ii
iii
a.
b.
c
8.1
8.2
i
ii
8.3
a.
i
ii
iii
b.
i
ii
iii
c
i
ii
iii
iv
v
8.4
i
ii
iii
8.5
i
ii
iii
8.6
i
ii
iii
8.7
i
ii
iii
8.7
9.0
9.1
9.2
i
ii
iii
iv
v
NAME OF WORK :- TRANSIT CAMP
Particulars
Architectural BOQ
PAVING FLOOR FINISHING AND DADO
Providing and laying machine cut machine polished machine cut Kota
Providing
stone slabs and20laying
to 25 ceramic
mm thicktiles for having
treads andsize risers
30 cm.ofxsteps
60 cm. and confirming
staircases, towith
Providing
corresponding
rounded nosingand laying
I.S.
for forAntiskid
the dado
treads Ceramic
and a bedtiles
onskirting of approved
in1:4
of required
cement quality
position
mortar withof readymade
size 30
including cm xadhesive
cement 30 cm
float,
Providing
and
mortar and
confirming laying
of approved
filling joints to
with neatIS ceramic
15622-2006
quality
cement tiles
on slurry,of having
(Group-B
plastercuring, size
IIA)
of 1:2 cement 30
for cm x
antiskid
polishingmortar 30 cm
flooring
including
and cleaning in required
joint
etc. position
filling with
complete.
Providing
confirming
laid
white/ and
on colour
a bed preparing
to of
I.S.15622/2006
1:4 cement
cement kitchen
slurry mortarottaincluding
(group
cleaning up to 75
D II-A)
curing cmcomplete.
and
cement
etc. width,made
7 tofloat,
8 mm up joint
thick
filling from 30 mm
for with thick and
cement
Providing
75
flooring
slurry highand
cm cleaning fixing
vertical
in required
curing green
support
position marble
for of
laidkadppa
etc. complete. 18
on a bed to
at of20
1 m. mm
1:4c/c thick for
of 25 mortar
cement door frame/ dado/
mm thick both side polished window
COLOUR-WASHING,
boxing
kadappa
including etc. On C.M.
middle
cement shelf1:6
float, WHITE-WASHING
and including
bottom
filling filling
joint of AND
joints
20 white/colour
with mm thick DISTEMPERING
with polymer
one base
slurryfiller
side polished
cement nosingwith
kadappa / facia
Providing
moulding
patti
cleaningof 20 and
the
x 50
curing applying
sharp
mm edges
etc. priming
kadappa
complete.wherevercoat necessary,
including on all
concrete/
material masonary/
curing,
labour etc. Asbestos
complete.
cutting fixing with cement
Providing
Cement
mortar and and applying
plastered
araldite twopolished
surfaces
curing coats of and
including water proof if
scaffolding
cleaning cement paintpreparing
necessary,
etc. complete. of approved themanufacture
surface by
Providing
and
thoroughly and
of approved applying
cleaning oil,washable
colour to oil-bound
the plastered
grease, dirt distemper
and surfaces
other of
including
foreign approved
matter scaffoldingcolour
and sand and shade
ifpapering
necessary, as to
Wall
old
cleaning
requiredPartition
and new
etc. surfaces
and preparing
complete. inthe
twosurface,
coats including
wateringscaffolding,
for two days preparing the surfaces.
etc. complete. (External
Sandwich
Painting) panel
(excluding cement
the primer board
coat.) Aerocon
etc. or similar
complete. (Internalmaterial 75mm thk (Internal) with
Painting)
Birla
OR Putty
External Facade
AAC blockwork 150 thick including external plaster (External) and Birla putty Inside
Item Description
Important Note -
Carrying out excavation in all types of soil viz dense, loose and sof murrum, carrying out demolition of any
existing
The scope concrete
shall also portion,
include if encountered
any other related usingactivities
suitable involved,
mechanical excavator
material, and manually
resource wherever
not specifically described
required up to required level for casting of Basement as shown in
herein below but essential for satisfactory & timely completion of the entire alloted works. the drawing to the satisfaction of EIC.
Adequate
Earth workprecaution
Obtaining (Excavation
necessary need to be
& Back
statutory taken by/ covering
filling)
approvals permissions the viz
loaded vehicle
drainage with plastic
approval, royaltyor permission,
tarpauline before
debrisgetting
out of site so as to avoid fall and spread of any excavated material on road. Vehicle
management plan for excavation shall form part of excavation contractor's scope of work. The scope of work tyres shall be cleaned
before
Carrying vehicle
shall also out
includemovement
excavation out
cartinginaway ofand
all typessite.of The
soilscontractor
disposingincluding to make
dense
of the debris proper
soil,
muck filled arrangements
at anupapproved
earth, clayee andsoil,
locationshall provide
sandy
as soil, by the
approved
necessary
localized shoring
regulatoryboulders,
authorityetc& shrutting
andand to
in carrying avoid
consultation any soil
out demolition collapse. For measurement
of any existing
with the Engineer In Charge concrete purpose,
portion,
(EIC). The plan area
shallxtake
if encountered,
contractor depth. All
using
into
safety
suitablenorms
account mechanical & regulation
installation, excavator shall
maintainance be
withandstrictly
a bucketfollowed. General
attachment
operation house
or manually
of approved keeping
dewatering and
wherever
system surrounding
required area
up toto
as required shall
required be
ensure level
clear
From
kept
for
working-0.00
neat
casting m basement
and
of
area. to -1.50
clean
During on maraf
level.
regular
excavation basis.
as shown
all in therecords,
related drawinglevels
to theshall
satisfaction of Project
be maintained Manager.
by the contractor.
From -1.50 m to -3.00 m level.
From -3.00 m to -4.50 m level.
From -4.50 m to -6.00 m level.
Excavation item same as 1.1 but in all types of hard rock / basaltic / granitic rocks using the breaker
attachment only to excavate through up to required level & depth as shown in the drawing.
From -0.00 m to -1.50 m level.
From -1.50 m to -3.00 m level.
From -3.00 m to -4.50 m level.
Backfilling
From -4.50with m tosoil / sand
-6.00 / murrum available within the plot at founding level & in & around the pile cap,
m level.
behind tank
Backfilling wall etc as shown
Backfilling using approved quality on thesoil drawing
/ murrum laid in layers
brought of not
from exceeding
outside, 300 mm
atfounding thick
level, in including
& aroundbreaking
the pile
clods,
cap, behind tank wall etc.. as shown on the drawing laid in layers of not exceeding 300 mm thickdensity
watering, compacting each layers with vibratory compactor to achieve 90 to 95% proctor includingat
optimum moisture content. At an unaccesible place the compaction shall
breaking clods, watering, compacting each layers with vibratory compactor to achieve 90 to 95% proctor be done using wooden / steel
rammers.
density at The
optimumscopemoisture
of work shall include
content. necessary
At an leadsplace
unaccesible and the
lifs,compaction
cost of conveyance of all using
shall be done materials
wooden within
/
Total
the for
site Excavation
premises, & Backfilling
required labour, Works
testing, machinery etc complete.
steel rammers. The scope of work shall include necessary leads and lifs, cost of conveyance of all materials
within the site
Antitermite premises,:-required
Treatement Providinglabour, testing,treatment
Antitermite machinery in etc complete.
accordance with stipulations laid down by IS
Miscellaneous
6313-part II by Items
approved at ground
agency level
with minimum of 10 years of
Rubble soling :- Providing and laying in position 225 mm thk rubble soling above murumguarantee including the cost of chemical,
filling as shown in
precautionary measures etc. as per standard practice. For measurement purpose,
structural drawing using approved quality stone of appropriate thickness provided as shown in the drawing area of treatment is
considered flat area at plinth level & area of treatment is considered as
including the cost of base preparation by mechanical compaction, using hand broken metal/ Rubble and 2.0 m wide strip up to 1.50 m depth
all around
smaller the
Total forpebbles U.G.tank wall
for void Works
Miscellaneous at ground level.
filling, murum for binding as directed by the Engineer-in-charge including watering,
packing, compaction etc.complete. The item includes all lead & lif.
Plain Cement Concrete (PCC), and General Reinforcement Cement Concrete (RCC) Works.
The unit rate shall
On clearance of thetake
area into
by account the following
the excavation ….. any fissure, crevices encountered in the rock strata at
contractor,
Contractorlevel
founding is advised
shall betotreated
study the drawings
as per before
Structural submissionspecifications
Consultant’s of the quote.using M 20 grade concrete &
nominal reinforcement (8 mm Tor @ 250 c/c in both direction in single layer) if required, including clearing of
The
For
muck mix
mix design of
& design
cleaning shall be affected
allthe
of carriedgrades,
concrete out in fly
accordance
portion. ash
The(PFA) to the shall
content
contractor relevant
shall ISthis
not
take Codes,
exceed ina maximum
activity approved lab
into accountof and
25 %the
whileOR same
GGBSshall
quoting up
for
Designing
be
to
PCC.40 %. Admixture as approved by the consultant which the contractor may intend to use to enhancelocation,
approvedof the
by mix,
the batching,
Structural mechanical
Consultant. mixing, transport, pumping and placing at all heights and
all shapes and
workability, sizes, laying
plasticizers to required
or retarders slopes,
to limit thevibrating,
water cementcuringratio,
and finishing,
all as per scaffolding, hacking
the design mix, the concrete
approved by the
surface, plant
consultant. and
Nothing machinery,
extra shallhire
be and
paid fuel,
for incidental
use of such charges, deshuttering,
admixtures. cutting of formwork for passing
Contractor shall maintain
services, conduits, dowelsa etc certified testing
complete lab at the
to finish sitework
with .a minimum facilities / equipments as decided by
the Project
Contractor Manager
For Generalshall for
rectifyWorks
Concrete conducting
all water Cube
leakages
-Concrete tests, sieve
in concrete
supplied through analysis
withRMC and
proper slump
can grouting
be used.cone
andtest.
shall deem to be included in
the unit rates.
scopequoted
The rates shall also
shallinclude
include protecting, curing
construction of concreteconstruction
of expansion surfaces as directed.
joint / expansion strips as directed by
the client. Prividing water stopper / water bar shall form contractors scope of work under respective
The scope also
concreting itemincludes necessaryshall
& the contractor surface preparation
quotehis providing and applying Aqua bond 150 or equivalent as
rates accordingly.
a bonding agent and cement 1:1 proportion for construction joints as per manufacturer specifications.
PCC :- Providing and Laying M 15 grade PCC, specified thickness as shown in the drawing including
Plain Cementcuring,
compaction, Concrete (PCC) Works.
vibration etc complete. On clearance of the area by the excavation contractor, including
clearing of muck & cleaning of the affected portion. The contractor shall take this activity into account while
quoting
75 mm thkfor PCC
PCC.below
Minimum cementitious
the pile cap & plinthcontent
beamshall be 325 Kg/m³.Concrete mix design shall be approved by
the consultant. In no case the maximun percentage of fly ash shall exceed 25%.
100mm thk at plinth level
150mm thk below U.G.tank
Total for PCC
Providing Works
& laying plant mixed design mix reinforced cement concrete conforming to grades as specified in (IS
456 - 2000) and as per specifications mentioned below at all levels using 20mm & down size aggregates, fine
aggregates,OPC,
Reinforced Cement necessary
Concrete admixtures approved by Consultants, including designing the mix, trial
(RCC) Works.
cubes,acelerated
General Notes for curing, weigh
RCC works… batching, mechanical mixing, transporting, pumping and placing at all levels,
Cost to include
excluding appropriate
the cost dewatering wherever
of steel reinforcement, necessary,
centering, cost
shuttering ofinclusive
but all materials, labours,
of cost towardsall pumping
lead and lifs,
using
tools,
line pump or boom placer, scaffolding, compacting with vibrators,construction joint treatments,specifications,
plant and machinery, hire and fuel charges and all other incidental charges etc., all as per curing and
drawings
hacking andexposed
the as directed.
surfaces wherever required to receive plasterwith
or floated steelcementitious
troweled surface whenever
Ready mix
Manufactured concrete of
sandshall
fromM approved
40 grade for various
makes can concrete elements
be considered. minimum
Therecesses
scope also includes content
for providing shall
cover to
specified. The rate
be 490 Kg per Cu.m. include cost of arrangements to provide to slabs, columns, walls and placing
reinforcement.
and securing
Column properly
& Shear within
wall from the formwork
foundation sleeves
to 11th floor and / or opening in slabs, construction joints, laying to
Ready mixshape,
required concrete of Mslope
size and 30 grade
all asfor
pervarious concrete elements with minimum cementitious content shall
drawings.
be 410 Kg per Cu.m.
Pile cap
Plinth beam
Column & Shear wall from 12th floor to Terrace floor
Beam at all levels
Slab at all levels
Deck slab concrete
Staircase Slab at all levels
Rcc pardi for lif formation
O.H.tank
U.G.tank (Notional qty)
For Miscellanious Works
Ready mix concrete of M 25 grade for various concrete elements with minimum cementitious content shall
be 385mix
Ready Kg per Cu.m. of
concrete (Notional quantities)
M 20 grade for various concrete elements with minimum cementitious content shall
be 350 Kg per Cu.m. (Notional quantities)
Total for Concreting (PCC & RCC) Works
Good quality wood, props and spans, film coated plywood only shall be used for shuttering works. Shuttering
Shuttering
& deshuttering & Formwork
sequence shall be 100%, 80% & 40% from the slab to be cast respectively depending on the
General Notes
progress. The same - is as per the details enumerated in General Notes. Contractors shall submit drawings
Cost to include
showing the double
scheme of&formwork
triple height staging,
including backsupporting
propping system,
and bracings, platforms required for variousand
Formwork
elements shallstepped
like be designed for close
foundations, jointed
etc. at rigid,
various durable
heights andproper
and shall have
levels .
sequence
adequate
Minimum
of removal
of strength,
150 mm
ofwater
formwork
high tightness
back
and propping
ensure soremoval
easy that theetc.,
structural
Props, slab will not
shorings and bebracings
overloaded
shall due
be toin
all construction
steel or slabsMS
loads. AllFormwork
Aluminium.
frame
shall be
works is required
progressively DE for kickers
shuttered and
and starters
back and
propped. formwork design calculations including re-propping
The scope
designed
arrangements shall include
with needs
proposed providing
materials
to resting
be submitted and
(to for approved prior to making) shall be able to retain its shape, line, on
applying
be approval.It is compulsory
approved form to
oil provide
on all adequate
surfaces of back props
formwork to the
coming slab
in
which
All
contact the supports
with concrete are as per before
dimension, level within the allowable limitsareas,
necessary treatment to honey combed
specificationstaking ofupvariations.
and concreting
drawings work
uneven concrete
and for every
surfaces
as directed
Necessary byslab.
shall
arrangement beshall
made beproper
Engineer-in-charge. as per
Doka,
envisaged the
tocuplock
structural
system or consultant
equivalent without
formwork an extra
as
provide camber in beams or slabs as per design. to becost
adopted & in no case wooden supports shall be permitted. Area of
formwork in contact with concrete shall be measured for payment. Area of any stop boards for construction
Pile cap
joints shall not be measured. Stagging height shall be as shown in the drawing. The unit cost shall also include
Plinthofbeam
cost deshuttering.
Column & Shear wall at all levels
Beam at all levels
Slab at all levels
Staircase Slab at all levels
Rcc pardi for lif formation
U.G.tank (Notional qty)
O.H.tank
Providing, supplying,
For Miscellanious collecting, fabricating & fixing in position reinforcement for RCC work and structural
Works
steel encasing works with high yield strength ribbed cold twisted tor steel (HYSD) bar of various diameters and
grade of steel at all levels conforming to IS specification including transporting from yard, decoiling,
Reinforcementcutting,
straightening, works bending,
- hoisting, fabricating, and placing in position according to drawings and
binding
Cost the
to include reinforcement
Fixing with
of foundation GI annealed binding wirewith
of double fold templates
of 18 gauge and providing PVC Note:
Contractor
cover blocks, shall
for prepare
placing the bendingbolts
bar reinforcements in the
schedule in
pedastal
and fabrication
position and for
necessary
shall be carried
maintaining theout asper
as
cover
perbar
GFC drawings.
bending
specified and/or
fixing of foundation bolts should be match with fabricated building members. Supply of bolts cost shall be
schedules.
according to relevant
paid in structural steelISitem
codes.
6.1.The
Costrate shall include
to include Supplycost of bindingaswire,
of template chairs, spacers
per requirement of which
projectwill not be
manager.
measured
Cost separately for payment etc complete all as per design, specifications
to include all necessary welding of reinforcement bars to the sturctural steel & reinformcent bar laps and drawings, with all lead &
Fe500
lif for all materials & labour and as directed, at all heights & locations.
with
Totalweld, where ever necessary
for Reinforcement Works and as requried by the project manager.
Waterproofing
Notes for weatherproof/waterproofing
All the work has to be carried out by approved specialist agency
Ten years performance guarantee on stamp paper has to be furnished by the main contractor along with the
final bill of this item
Unless otherwise specified, the rate quoted shall include for the following:
Material, labour, workmanship and sequence of operation as specified by the specialist agency and approval
of Engineer-in-
Only plan area will charge / PMC / Owners
be measured & paid for terraces. No extra will be paid for forming concave chamfers at
the junction of slab and
Waterproofing work shall be carried outwall / parapet / column
strictly in accordence to the manufacturer's specofications and as per
drawings attached, detailing the watereproofing treatment for relevant areas.
Integral Waterproofing Admixture for Concrete :
Providing & mixing
First part consist Formdex
of all Admixture
surface area or Bluecleaned
should HY B a chloride free admixture
up toproviding
visible ofand @ 0.8
hairapplying
cracks % cementitious
/ Vandex
aggregate content
The second
(including part
flyash) consist
to a of Cleaning
maximum of the%
1.2 surface
per thoroughly,
100 kgs of cement to increase workability, BBtexture.
White /&Blue
compressive
Lift
dex pit
Cleaning Waterproofing
white ofwaterproofing
RCC member system should be in done by hacking
two coats tool, wire
@ 4kgs/sqm brush, wireasgrinder
by trowelling & air blower specifications.
etc. Open
flexural
cracks strength
&coat
construction & waterproofing
joints should properties
be sealed and
withto reducemortar
cement permeability, as per
with additive. per manufacturer’s
the recommended
All clean & treated doses by
area the
The
the 1st
manufacturers.of Vandex(For BB White
Pile cap, / Blue
below dex
stiltwhite
column,White shall
U.g. tank be applied
or any to
other the prepared
structural surface.
element in Whilst
contact on
should
1st coattested still for
isface,in wateratighness
“green” second by flooding
coat comprising water.
of All wet spots
Vandex & water
BB White / Blueleakage area should
dex white. The slurrymark for
coatings
external
treatment. close vicinity of soil )
shall
Toilet
The be applied
Waterproofing
Second part with a stiff
consist masonaryand
of Providing brush or stiffproprietary
applying broom and100% worked intobased
water every elastomeric
irregularity on the surface
Polyisoprene
Providing
shall be doneand Applying
by means waterproofing
of trowelling and
or by filling
spray for
only.Toilet in following
Treatment to floorparts as shall
slabs per the
be specifications
carried out bylisted
trowelby
membrane
The
below First
and partwaterproofing
as consist
approved of byall withProject
surface
the minimum
area elongation
should
Manager. cleaned 500%
up toUV Resistance
visible hairwith
ofincluding one/ aggregate
cracks coat of primer followed
texture.
application
two coatsofofRCCusing a steel
polyisoprene trowel into
Membrane hardenced
Formak concrete
629 / Blue slab surface curing, cleaning etc complete.
Flooring
Cleaning member should be done by hacking tool,Deck waterproofing
wire brush, membrane
wire grinder wateproofing
& air blower etc. Open
system and should have following properties:
cracks & construction joints should be sealed with cement mortar with additive. All clean & treated area
i) Solid tested
should % Vol: for (70water
± 3) tighness by flooding water. All wet spots & water leakage area should mark for
The
ii)
The Second
Tensile part
Strength consist
Third Part consisting > 11.0ofMPaofProviding
(ASTMand
providing applying
D412)
and proprietary
laying avg. 100%CM
25mm thick, water based elastomeric
1:4 screed admixed with Polyisoprene
Integral
treatment.
membrane waterproofing with minimum elongation 500% UV Resistance with one coat of primer followed by
iii)
The Elongation
Waterproofing >
First part consist 500%
Compound (ASTM D412)
of all surface
of approved area makes
should as cleaned up to visible ofspecifications
per manufacturer's hair cracks / aggregate texture.
two
Wall
iv) coats
Shore Aof polyisoprene
Hardness - 70 ±Membrane
5 (ASTM Formak
D2240) 629 / Blue Deck waterproofing
Cleaning of RCC member should be done by hacking tool, wire brush, wire grinder & air blower etc. Open membrane wateproofing system
and
v) UV should
Resistancehave following
- Excellent properties:
(ASTM C-822)
cracks & construction joints should be sealed with cement mortar with additive. All clean & treated area
i) Solidbetested
shall
should %applied
Vol: for (70as±per
3) manufacture
water specification.
tighness by flooding water. All wet spots & water leakage area should mark for
ii)
The Tensile
Third
treatment. Strength
part for > 11.0
walls MPa
consist (ASTM
of D412) and applying one coat of plaster CM 1:4 of 10-12mm thick and
Providing
iii) Elongation
adding conplast > 500%
WL or(ASTM D412)waterproofing compound and curing the same thoroughly.
equivalent
Treatement
iv) Shore A Hardnessto Core Cut - 70areas
± 5 (ASTM D2240)
Sealing of Core cutting
v) UV Resistance areas(ASTM
- Excellent with microC-822)concrete in the sequence below to ensure water tightness at the
junctions.
shall cuting
be applied
Core and as per manufacture
hacking to be done by specification.
the main contractor.
Wash thoroughly this hacked off areas to expose the clean concrete surfaces between outlet pipe and
concrete.
Place and fix the pipe mechanically make necessary shuttering from the bottom.
Pour micro concrete, 4 parts micro concrete and 1 part of water to fix and seal the pipe. Remove the
shuttering afer one day / two day and curing done for 7 days.
Detailing around the pipe -
Providing & fixing deck web of required size around the pipe sandwitched with waterproofing membrane.
Note: Only treatment to periphery of the pipe shall be done, core cut filling to be done by the Main
Contractor.
Refuge slab Waterproofing
Providing
All surfaceand areaApplying waterproofing
should cleaned for Balcony
up to visible of hair/ cracks
Deck //Service slabtexture.
aggregate in following partsofasRCC
Cleaning permember
the
specifications listed below and as approved by the engineer-in-charge
should be done by hacking tool, wire brush, wire grinder & air blower etc. Open cracks & construction joints
should be sealed with cement mortar with additive. All clean & treated area should tested for water tighness
by flooding water. All wet spots & water leakage area should mark for treatment.
Providing and Applying "TRAFFIGARD / BLUEGARD" membrane waterproofing system, in three layer, apply
primer coat dilute TRAFFIGARD / BLUEGARD with water (4 volumes TRAFFIGARD / BLUEGARD and 1 volume
water) at a coverage 9 sqmt per litre and allow to dry. Apply one body coat over primer at coverage of 2.5
sqmt /ltrs. and while it is wet, unroll fibreglass mat over it. Immediately apply a second body coat over
dibreglass
Laying avg.mat 50 mm at coverage
thick, screed of 2.5concrete
Sqmt/ltr.toensuring that thewith
slope admixed fibreglass
Integralmat is fully immersed
Waterproofing Compound with the of
TRAFFIGARD/BLUEGARD get. Leave
approved makes as per manufacturer's specifications. till dry. TRAFFIGARD/BLUEGARD shall be brought up 300mm onto parapet
Terrace
Providing
walls andSlab
andWaterproofing.
kerbs Applying
to form "TRAFFIGARD
skirting including / BLUEGARD"
preparing the membrane
substrate waterproofing system, in three layer, apply
to receive TRAFFIGARD/BLUEGARD
Providing
All surface
primer
treatment. coatand
area Applying
dilute should waterproofing
cleaned
TRAFFIGARD up for Terraces
to visible
/ BLUEGARD of by
hairwater
with following
cracks (4/volumes methods
aggregate as perCleaning
texture.
TRAFFIGARD the specifications
/ BLUEGARD of RCCand listed
member1 volumebelow
and
should Testing
be of
done treatment
by hacking as per
tool, the
wirerequirements.
brush, wire grinder & air blower
water) at a coverage 9 sqmt per litre and allow to dry. Apply one body coat over primer at coverage of 2.5 etc. Open cracks & construction joints
should
sqmt /ltrs.be sealed
and while withitcement mortarfibreglass
is wet, unroll with additive. mat overAll clean & treated area
it. Immediately applyshould
a second testedbody forcoat
waterover tighness
by
The flooding
dibreglass water.
slope making All
mat at coverage wet
part consistsspots
of 2.5& water
of Sqmt/ltr. leakage
providingensuring area
and laying should
that
ofthe
screedmark for
fibreglass
concrete treatment.
matofisM20fullyinimmersed with the thick
slope (115-125mm
The
at Second
centre & 75part
TRAFFIGARD/BLUEGARD mm consisting get.
thick towards ofLeave
Providing andTRAFFIGARD/BLUEGARD
till dry.
drain point) applying proprietary 100%
as per manufacturers shallwater based elastomeric
be brought
specification. up 300mm Polyisoprene
onto parapet
Lmr
walls /
membrane
Providing
The Staircase
and
First kerbs
and
part Cabin
waterproofing
to
Applying
consist form Top / OHT
with
skirting
waterproofing
of all of surface Top
minimumSlab
including for
area should Waterproofing.
elongation
preparing
O.H. TANK the
cleaned &500% UV
substrate
LMR
up Top Resistance
by
to visible to receive
following
of hair with one coat
TRAFFIGARD/BLUEGARD
methods as
cracks / aggregate of
per primer
the followed by
texture.
The
two Fourth
coats
treatment.
specifications ofPart consisting
polyisoprene
listed below withProviding
Membranea minimum and warranty
Formak filling
629 brick
or / block
Blue
period Deckof bat coba
waterproofing
10 years waterproofing
and membrane
Testing of treatment
(0.4
treatment Lit
asto
/ specified
sqm
per /
the
Cleaning
areas viz of RCC member
terrace, canopies, should
chajjas,be exposed
done by hackingslabs etc.tool,
The wire
slab brush,
shall be wire
laid grinder
over & air
with blower
brick / etc.bats
block Open coba
Coat) wateproofing
requirements.
cracks & construction system
joints and should
should have
be sealed following properties:
laid
i) & joints
Solid % Vol:filled in
(70water with
± 3) cement mortar 1:5 inwith
truecement
lines &mortar with additive.
levels gradient with avg All thickness
clean & treated of 110mm area and
should
required tested for tighness by flooding water. All wet spots & water leakage area should mark for
ii) Tensileslope
treatment. Strengthat rain> 4.5overMPa let (ASTM
(for easyD412)flow of water/rain water) Finally the top surface of brick / block bat
coba shall
iii) Elongation be laid over
> 550%of and
(ASTM joints finished
D412)area should with waterproofing layer with CM 1:4 and admixture finished
The
smooth Firstwith
partcement
consist all surface
slurry. The treated surface cleaned
afer 12uptoto 15visible of hair cracks
hrs. thereafer shall /be
aggregate
kept texture.
ponded forsystem in
Water
The Retaining
Second
iv) Shore of
Cleaning part
A Hardness
RCC Structures
consist
member of
- 55should - U.G
providing
± 5 (ASTM /O.H.Tank
be and
D2240)
done applying
by hacking Vandex
tool, BB
wire White
brush, / wire
Blue grinder
dex white& waterproofing
air / water blower etc.
Providing
continuous
two coats and
by
v) UV Resistance Applying
period
trowellingof 7
- Excellent waterproofing
days
as perto detect any
manufacturer’s
(ASTM C-822) for Water
seepage/ Tank by
leakage/
specifications. following
dampness
The 1st methods
coatif any,
of as
the
Vandexper the
surface
BB specifications
then
white orshall
Blue be
Dexlisted
Treated
below
cleaned honeycomp
with
to a minimum
withstand area should
guarantee
weather be checked.
period
and domestic of All
10
use. cracks
years which
and are
Testing more
of than
treatment in 1mm
as perin width
the and
requirements.
white
Food shall
shall Grade
be
construction be
applied applied
Epoxy
joints asCoating
per
shouldtomanufacture
the:- prepared
open Providing surface
specification.
"v"110mm
shape.andOpen at cracks
applyingcoverage
2 coats ofof1 ECW
kg/sqmt.
& construction Whilst
130joints
or the 1st
equivalent,
should coat
beepoxy
sealed is coating
still
with“green” by -a
micro
(Max
second
mixing avg. 110mm
coat comprising
2 components thick and
of
usingAll above
Vandex
slow BB
speed white shall
or
heavy duty be
Blue charged
Dex white extra.)
drilling tested at
machine a coverage of 1 kg/Sqmt shall be applied.
concrete / acrylic polymer. clean & treated area should forfixed
waterwith mixingbypaddle,
tighness flooding applying
water. All firstwet
The
spotsslurry
coat using
& watercoatings
brush or shall
leakage roller be
area andapplied withit for
allowing
should mark atostiff
dry masonry
for 16-18Ifbrush
treatment. hrs, or stiff
areabroom
applying
the wet second
observed,and
coatworked into
and allowing
it should every
it to dry
be treated as above
irregularity
completely,
procedure till on the
etcthe and surface
area complete by means
should as
getper of toweling
tight. or byspecification.
manufacturer's
water spray only. Treatment
[The properties to floor ofslabs
membraneshall beare:-carried out
Pot life
Sealing
by trowel
: 30 min; of Tie
theMixed Rod
application
periphery Holes:
density in 2.0 kg/Sqmt
of sockets,
: 1.45 –grooves coverage
1.55 Gms/ml of Vandex
with "Powergrout BB white
at 27° C; Time/ between or
B 30 NontheBlue Dex
Shrink
coats white
Grout", using a steel
or equivalent
: 6-8 Hrs; trowel
Walkabilityto be into
: 24
hardened
placed
Hrs; Fullincureconcrete
between slab Bond
form
: 7 days; surface including
worksstrength
before : >curing,
1.5 N /cleaning
concreting, preferably
Sqmm; Dry etcplaced
complete.in the centre
film thickness : 130ofmicrons;]
the wall thickness, one no
for
Total each buried or embeded
of Waterproofing WorksTie Rod. At all heights and levels of RCC wall.
Breaking & demolition of reinforced cement concrete of any dimension and at any level, manually or by
mechanical means as the case may be with necessary tools and plants, scaffolding .The scope includes
Breaking & debris,
Miscellaneous
removal of demolition
Works of brick work
it's disposing / block work
at approved (plastered
location, loadingorand
unplastered)
unloading of any
and dimension
making and at good
the surface any
level, manually or by mechanical means as the case may be with necessary tools and plants, scaffolding.
etc.complete. The contractor shall cut of steel rods of any dia using gas cutter, stack and hand over the steel Theto
scope includes removal of debris, it's disposing at approved location, loading and unloading
Clients. The entire breaking / dismantling operation shall be carried out as per specific instructions & and making the
surface good
directions etc.complete.
of EIC. (This itemTheshallentire breakingonly
be operated / dismantling operation
in view of any changesshall be carried&out
in drawings as perbreaking
thereby specific of
instructions & directions of
structural member is necessary) EIC. (This item shall be operated only in view of any changes in drawings & there
Total (Itemof1structural
by breaking to 9) member is necessary.)
Add for Taxes
Total Amount for Civil Work, including taxes.
Notes:-
Contractor to take approval for mix design from Consultant.
The above quantities are based on our structural Tender drawing BDD/MCPL/STR/recd dated R0 17.01.19 . Archit
In the absence of drawing or detail of U.G tank , we have calculated quantities based on the architectural drawin
In the absence of drawing or detail of LMR /O.H.tank , we have calculated quantities based on the Terrace floor &
Above quantities are excluding elevational features like cornices, elevational column, band, elevational detail abo
extra over & above these quantities as per the actuals.
Quantity Unit Rate Amount
5800.00 Sqm
6700.00 Sqm
2040.00 Sqm
13500.00 Sqm
1350.00 Sqm
2340.00 Sqm
53940.00 Sqm
12300.00 Sqm
53940.00 Sqm
20200.00 Sqm
12290.00 Sqm
250.00 Sqm
1570.00 Sqm
32.00 Cum
2830.00 Sqm
405.00 Sqm
1180.00 Sqm
0
Cu.m 1611
Cu.m 770
Cu.m 305
Cu.m 55
Cu.m R.O
Cu.m R.O
Cu.m R.O
Cu.m R.O
Cum 755
Cum 505
Sq.m 1444
Sq.m 1123
Cum 47
Cum 118
Cum 34
Cum 1160
Cum 520
Cum 36
Cum 1170
Cum 55
Cum 8
Cum 2233
Cum 256
Cum 9
Cum 40
Cum 291
Cum 50
Cum 50
Cum 50
Sqm 665
Sqm 320
Sqm 15580
Sqm 635
Sqm 46
Sqm 1280
Sqm 115
Sqm 830
Sqm 302
Sqm 100
MT 465
MT 847
Sq.m 14100
Sq.m 4068
Sqm 24540
MT 13
Cu.m 900
Sq.m 103
Sq.m 2890
Sq.m 9062
Nos R.O
Sq.m 128
Sq.m 1014
Sq.m 103
Sq.m 103
Sq.m 831
Sq.m 831
Nos 100
Cu.m R.O
Cu.m R.O
Architectural BOQ
Notes:-
i Contractor to take approval for mix design from Consultant.
The above quantities are based on our structural Tender drawing BDD/MCPL/STR/recd dated R0 23.01.19 . Architectural
ii drawing dated 18.12.18.
iii In the absence of drawing or detail of U.G tank , we have calculated quantities based on the architectural drawing..
In the absence of drawing or detail of LMR /O.H.tank , we have calculated quantities based on the Terrace floor & architectura
iv sections....
Above quantities are excluding elevational features like cornices, elevational column, band, elevational detail above terrace
v floor, pediments etc. Its quantities shall be extra over & above these quantities as per the actuals.
Rate Amount
2970 15681600
1530 8445600
1440 2426400
1440 16416000
9900 10989000
2394 4428900
36 1625400
90 994500
180 8127000
2430 39657600
1170 15081300
18000 4500000
1260 1631700
99000 2673000
3330 7758900
4500 1507500
5400 5346000
108000 87480000
1630 34882000
2160 2862000
272514400
232044
Rate Amount
504 771120
504 383040
603 162810
1440
1800
288 208800
900 432900
1958670
189 240030
720 684000
924030
5590 240370
5590 559000
5590 190060
989430
8710 9842300
8390 3993640
8390 285260
8390 8775940
8390 461450
8390 67120
8390 15689300
8390 2147840
8390 75510
8390 335600
8390 2391150
8390 419500
8070 403500
7860 393000
45281110
720 436320
720 213840
720 11188800
720 457200
720 33120
720 921600
720 82800
720 586800
720 217440
720 72000
14209920
76715 30302425
30302425
103565 74566800
0
74566800
1440 29570400
126000 1512000
31082400
0
0
0
0
0
0
0
0
199314785
35876661.3
235191446.3
0 23.01.19 . Architectural
chitectural drawing..
the Terrace floor & architectural
vational detail above terrace
als.