BJM EC 20 DS 009 A4 Rev - 0 Datasheet Premium Pertamax Tank 5000 KL
BJM EC 20 DS 009 A4 Rev - 0 Datasheet Premium Pertamax Tank 5000 KL
BJM EC 20 DS 009 A4 Rev - 0 Datasheet Premium Pertamax Tank 5000 KL
LEMBAR REVISI
SUPPLIER’S
NO. DESCRIPTION UNIT REQUIREMENT
RESPONSE
DATA SHEET FOR
PREMIUM / PERTAMAX / SOLAR
1 1
STORAGE TANK
NOTES:
1.
2. .
DOCUMENT NO.:
DATASHEET FOR
PREMIUM/PERTAMAX/SOLAR TANK BJM-EC-20-DS-009-A4
PAGE : 4 of 5
PAGE : 5 of 5
TBA
JASA KONSULTASI PENYUSUNAN FEED UNTUK
PENGEMBANGAN TERMINAL BBM BANJARMASIN 0 07-Mar-19 AGG ISSUED FOR APPROVAL DATE REVISION
REV. DATE BY DESCRIPTION 07-Mar-19 0
TAG NO. : 20-T-21 CONTRACTOR COMPANY
SERVICE : Premium/Pertamax/Solar Storage Tank ORIGINATOR: CHECKED: APPROVED: APPROVED:
AGG NDP NDP
1 CONSTRUCTION DETAILS (CONTINUED)
2
3 SCHEDULE OF APPURTENANCES
4
5 SIZE ANSI FLANGE
MARK DESCRIPTION QTY. REMARKS
6 (in) CLASS TYPE
7 N1 Inlet Nozzle 1 8 #150 RFWN c/w diffuser
8 N2 Outlet Nozzle 1 10 #150 RFWN c/w Fortex Breaker
9 N3 Spare 1 2 #150 RFWN c/w Blind Flange
10 N4A/B Level Switch Low Low 2 2 #150 RFWN
11 N5A/B Level Switch High High 2 2 #150 RFWN
12 N6A Water Drain 1 4 #150 RFWN to Open Ditch, c/w Internal Pipe
13 N6B Drain 1 4 #150 RFWN to Tank Drainage, c/w Internal Pipa
14 N7 Level Indicator Transmitter (ATG) 1 6x8 #150 RFWN c/w Stilling Well
15 N8 Temperature Indicator 1 2 #150 RFWN
16 N9 Slot Dipping Device 1 4 #150 RFWN c/w Gauge Hatch and Stilling Well
17 N10 Roof Spare 1 4 #150 RFWN c/w Blind Flange
18 N11 Inlet 1 4 #150 RFWN
19 N12 Nozzle Foam Chamber 1 10 #150 RFWN c/w Platform for Maintenance
20 M1A/B Manhole 2 24 #150 RFWN c/w Blind Flange
21 M2A/B Roof Manhole 2 24 #150 RFWN c/w Davit
22 V Vent 1 4 #150 RFWN c/w Flame Arrestor
23 Sketch :
24
25 V
26
N9 N10
27 M2
N8
N7 A/B
28
29
30
31 N5B
32
N5A
33
N12
34
35 N3
36
37 N4B
38
N11 N4A
39 N1 N2
M1A/B
40
N6B N6A
41
42
43 slope 1 : 120
44
45 Notes :
46 1. Specification for this tank should be refer to BJM-EC-20-SP-001-A4 Spesifikasi Umum Tangki Timbun Bahan Bakar
47 2. All materials used in construction, fabrication and assembly shall conform to all applicable ANSI and ASTM listed publications.
48 3. All weld joints must conform to the applicable listed AWS publications & API 650 12 th ed. 2013
49 4. All tank connections shall conform to ANSI B16.5
50 5. Refer to API 650 12 th ed. 2013
51 6. Grating should be hot dip galvanized
52 7. Tank fabricator / manufacturer should determined details engineering stage before construction phase
53 8. Refer to ASTM materials standard
54 9. BJM-EC-10-DG-010-A3 P & ID Diagram Premium Storage Tank
55 10. VTA/(*) = Vendor To Advice
56 11. Painting:
57 External : LS 11
58 Internal : Epoxy Resin 250 Micron
59 Underside Tank : Coal Tare Epoxy 1000 Micron
60
61