1) The document discusses problems in adopting BIM for structural rehabilitation projects in the AEC industry.
2) It analyzes the typical methods used in structural rehabilitation projects and compares them to BIM procedures. This involves examining how professionals currently assess existing structures and determine rehabilitation needs versus theoretical BIM approaches.
3) The goal is to find ways to better implement structural rehabilitation and design within BIM environments by defining current barriers and potential solutions. Understanding differences between rehabilitation and reinforcement is also important to avoid confusion.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
51 views3 pages
Chapter 5.11
1) The document discusses problems in adopting BIM for structural rehabilitation projects in the AEC industry.
2) It analyzes the typical methods used in structural rehabilitation projects and compares them to BIM procedures. This involves examining how professionals currently assess existing structures and determine rehabilitation needs versus theoretical BIM approaches.
3) The goal is to find ways to better implement structural rehabilitation and design within BIM environments by defining current barriers and potential solutions. Understanding differences between rehabilitation and reinforcement is also important to avoid confusion.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3
CHAPTER #5.11 following the actual trend of the AEC Industry.
the actual methods and methodologies used
-RXLIFMFPMSKVETL][IGERƼRHEJI[I\EQTPIW in the structural rehabilitation project and then PROBLEMS IN THE ADOPTION OF BIM FOR STRUCTURAL REHABILITATION of researches to this (Volk et al., 2014) and compare it to the BIM procedures. This analysis Víctor Fernández-Moraa; Víctor Yepesb techniques to apply point-cloud technologies1 is going to be divided in two main parts. First, Universitat Politècnica de València, Spain. a to create accurate Building Models (Jung et the methodology used by the professionals ICITECH (Instituto de Ciencia y Tecnología del Hormigón), Universitat Politècnica de València, Spain. b al., 2016) are becoming vital to gather accurate to acquire enough information about an data. Despite this, the connection between BIM existing structure. Second, the different and the rehabilitation project, has not been theoretical approaches to obtain the efforts developed by the Industry. Considering the XLEXHIƼRIXLIWXVYGXYVEPFILEZMSYVERHHIWMKR 1. Introduction matrix of the project’s data where the user can expansion that the research in BIM has had a structural reinforcement. While there can be HIƼRIERHVIPEXIRI[HMQIRWMSRWERHZEVMEFPIW The Architecture, Engineering and Construction in these last years, we can assume that there WTIGMƼG WSPYXMSRW [I [MPP GSZIV SRP] KIRIVEPP] MRWMHI XLIQ 8LIVI EVI TVIHIƼRIH HMQIRWMSRW (AEC) Industry has been changing during exist some problems which prevent this use for EHSTXIH SRIW EW XLI] ƼX FIXXIV MRXS XLI &-1 like geometry or areas, but the user can add the last years for several reasons. The &-1-RXLMWTETIV[IEVIKSMRKXSHIƼRIXLIWI environments. new ones like weight, cost or sustainability. appearance of new technologies like Building FEVVMIVW ERH XV] XS ƼRH E [E] XS [SVO EVSYRH This data forms a digital model, and it is what Information Modelling and techniques like Lean XLIQ 3YV EMQ MW XS ƼRH E [E] XS MQTPIQIRX 2.1. Structural surveys MW YRHIVWXSSH EW E ƈTVSHYGXƉ MR WSQI GEWIW Construction or life cycle analysis are creating the structural rehabilitation and design the named Building Model. To create this Building To use BIM in a satisfactory way we need to new trends and opportunities that alter the structural reinforcement into BIM. 1SHIPXLIYWIVYXMPM^IWEWTIGMƼGƈWSJX[EVIƉERH develop not only the tools, but the methodology methodologies of this industry. Moreover, in Regardless the methodology applied on a JSPPS[WEƈQIXLSHSPSK]ƉXSHIƼRIXLIQSHIPMXW to use it. For this, we need to stablish the the recent years the business model is also restoration there is a difference between variables and the connections and constraints actual methodology used by the professional suffering changes. Rehabilitation is gaining the terms rehabilitation and reinforcement among them. to determine the demands of the building more and more importance in the AEC Industry. XLEX RIIHW XS FI GPEVMƼIH XS EZSMH JYXYVI The widespread adoption of BIM is logical ERH EREP]WI LS[ MX ƼXW MRXS &-1 8S WXYH] XLI In 2001 the annual turnover in Spain was misunderstandings. Rehabilitation is the considering its capabilities and the great procedure in developing a structural survey our 77,7% from new buildings and 22,3% from reacquisition by the elements of their initial amount of advantages that it can provide. research data was collected from personal and renovation and rehabilitation, while in 2014 the capabilities, allowing them to perform the The key advantage to BIM is the accuracy in non-personal (Almeida et al., 2018) professional percentages were 44,3% and 55,7% respectively same as before they had received the damage. the geometrical representation and the other experience and from a restoration manual ƈ3FWIVZEXSVMSHI:MZMIRHE]7YIPS&SPIXʧR%RYEP -RWXIEHVIMRJSVGIQIRXMWHIƼRIHEWERMRGVIEWI TEVEQIXIVWHIƼRIHMRXLITVSNIGX8LMWWTIIHW (Vegas López-Manzanares, 2017). From there 2017,” 2017) with a total of 25.825 buildings in the structural performance of the element the processes related to the AEC Industry we have stablished common points in the under renovation on the year 2015. These (Calavera, 2005). Most of the techniques are QEOMRK XLIQ QSVI IƾGMIRX ERH MQTVSZIW XLI different processes and developed a pattern changes are not stationary and in the near future valid in both cases, but there are some that are design while detecting and solving possible that can be seen in Fig. 1 that synthetizes the the trend will continue leading the industry to not. As our focus is the structural reinforcement problems or incompatibilities (Azhar, 2011). process. RI[ LSVM^SRW %W )EWXQER WXEXIH ƈ8LMW MW ER we will be increasing the actual structural Several professional can work at the same exciting time to be an architect, an engineer, or performance of the element even if that means XMQISRE&-11SHIPERHXLIQSHMƼGEXMSRWEVI any other AEC industry professional.” (Eastman just to recover its original state. coordinated. Also, the BIM environments can et al., 2011). implement Building Performance Simulation Many authors have stated (Volk et al., 2014) 2. Methodology (BPS) tools with ease and integrate the that BIM is leading this change, but there isn’t automatization of processes to handle new The big difference between BIM applied on new WXMPPEFVSEHP]EHSTXIHHIƼRMXMSRJSV&-1[LMGL criteria like sustainability (Diao et al., 2011), buildings and rehabilitation is the existence of a HMƾGYPXW MXW YRHIVWXERHMRK F] XLI -RHYWXV] Figure 1. Process of the structural rehabilitation energy consumption or risk management (Zou building as a base point and the need to know Following the explanations given by National et al., 2017). It also provides ways to handle the how this building has been built and how to Most of the times the professional is contacted BIM Standard - United States (2016) and Black Box Effect derived from the excessive reproduce it in BIM (Almeida et al., 2018). So by the building’s responsible who exposes )EWXQER IX EP
&-1 GSYPH FI HIƼRIH automatization in processes (Fernández-Mora, far, we have proved the advantages of BIM the new needs of the building and its actual as a trichotomy of a product, a methodology 2018). This great level of automatization and to the industry and the necessity to adopt its problems. With that in mind the data collection and a software. This differentiation proves control is directly shown in the cost, producing procedures, so it is normal to assume that, in phase starts, the professional must collect that there isn’t any ontological approach to savings of up to 10% of the contract value and a fact, there exist some barriers regarding this data from the building, its state, possible XLI &-1 HIƼRMXMSR 1EXˏNOE ERH8SQIO
7% reduction in project time (Azhar, 2011). adoption and that they probably lay in the affection and if possible, historical data. Once that some professionals have a partial view BIM can also handle time-related parameters rehabilitation problem’s nature. the data is collected, it is time to create a of the concept and that the three aspects are and stablish objects that exist at some points 8SƼRHXLITVSFPIQW[IRIIHXSJYVXLIVWXYH] structural model of the building, study the new used indistinctly. This means that BIM is a mix and disappear at others. This can be used to between the three, formed by an n-dimensional implement the renovation project into BIM, 1 8LMWXIGLRSPSKMIWEVIFEWIHSRXLIYWISJ(WGERRIVWXSGVIEXIETSMRXGPSYHXSEGGYVEXIP]HIƼRIXLIKISQIXV]SJERSFNIGXERH HIƼRIE(1SHIP6IFSPNIXEP
284_block 5: building technology and advanced materials reactive proactive architecture_285
demands for the structure and determine the 3. Discussion repositioning or elimination of elements, actual trend, that in a few years we could have contribution that the existing element can make FIEQW[MXLI\GIWWMZIHIƽIGXMSRSVTVIWIRGISJ access to BIM models from the design phase of Every problem regarding the use of BIM for the to the new structure. In case that that existent compartmentation with high stiffness among existing buildings, especially in public buildings. structural rehabilitation can be summarized WXVYGXYVITVSZIWMRWYƾGMIRXJSVXLIRI[PSEHW others can alter the structural behaviour and At the end of this year 2018 the Spanish in one word: uncertainty. This concept can a reinforcement must be designed and built produce important pathologies and cracks on Ministerio de Fomento is going to require a BIM be extended to a lot of points that affect the guaranteeing the right connections between the the building. model for any public building (ITeC, 2015), this process and we are going to categorize and old and the new parts. -Uncertainty in the design: Directly related with follows an European requirement that sets this EREP]WI IEGL SRI SJ XLIQ XS FI EFPI XS HIƼRI the previous point is the structural design. To objective for 2020 (European Parliament, 2014) the problematic and study it step by step. But 2.2 Structural reinforcement design methods determine the exact design and dimensions and has been required in UK since 2016 (Chi et this does not change the fact, the uncertainty is of every element isn’t an easy task, but it is al., 2014). There are also techniques like point- To design the structural reinforcement and what is creating a gap between the rehabilitation MQTSVXERX XS ƼRH E GIVXEMR TEXLSPSK] SV XS cloud modelling that nowadays are able to input solve the problem it is necessary to understand and the different automatization processes, design the structural reinforcement. Modelling data into BIM and create accurate models. If the the building and its necessities. This makes this because as we have seen a complete this structural design can result in a challenge, need of modelling the building in BIM disappears part the most delicate one as the professional preliminary study is vital. There are several as BIM software usually is not ready to handle in the next years, it will be a great advantage to needs to combine the knowledge of the building points were this uncertainty has to be solved to small deviations in an element. It is also vital use this methodology for rehabilitation. with its necessities and determine the proper solve the structural reinforcement. XS HIƼRI RSX SRP] XLI SVMKMREP HIWMKR FYX MXW Most of this uncertainty is also a problem if using design. A lot of data has to be taken into 9RGIVXEMRX]MRXLIQEXIVMEPW8LIWTIGMƼGEXMSRW actual state and possible alterations. The use CAD software, but using BIM we get additional consideration besides the buildings geometry. of the materials used previously in the structure of point-cloud technologies can be crucial to get advantages. If using CAD the professional is in The position of the element and its importance can be unknown for the professional designing EREGGYVEXIHIƼRMXMSR-JXLIWXVYGXYVEPIPIQIRX need to maintain updated several copies of the to the global equilibrium, the warning capacity the reinforcement. This is solved with a proper presents some damage it is also necessary drawings. Instead using BIM in the renovation of the element, the live loads over the element structural study of the building developing a to estimate the affection of this damage to its project creates the opportunity to develop the and the damage that it has suffered among series of tests to determine the characteristics. structural performance. Typically, this has been TVSNIGX XLVSYKL XLI XMQI ERH HIƼRI LS[ XLI others (Calavera, 2005). BIM environments are ready to be used with left to the professional’s criteria and most of the elements change along it. This allows the user Another important part is the numerical method TVIWIRXQEXIVMEPWERHXLIYWIVGERHIƼRIRI[ time it implied to estimate that the contribution to follow the evolution of an element and locate used to design this reinforcement. On the one ones to reproduce the existing characteristics to the structural performance of the element is the different tests developed on the structure side, it has to reproduce the structural behaviour [MXLSYX XSS QYGL HMƾGYPX] 4VSFEFP] HMJJIVIRX zero and to design oversized reinforcements. and the changes for the reinforcement, avoiding of the element and its real structural capacity. materials for certain groups of elements should There exist numerical methods like Hangaru et at the same time some errors due to data On the other hand, it has to incorporate the FIHIƼRIHXSSFXEMREGGYVEXITVIHMGXMSRW8LIVI al. (1997) to estimate this damage index, but they misplacement. Additionally the introduction of state of the element and the contribution GER ETTIEV WSQI HMƾGYPXMIW [LIR QSHIPPMRK result impractical due to high computational BPS into BIM introduces analysis tools with the needed by the reinforcement. While sometimes the reinforcement design and new materials demands and the need of data from the original whole picture of the project taken into account is assumed that the existing element does not are encountered with existing ones. It is also state of the element. Calavera (2005) presents a automatizing processes and reducing costs. contribute to the structure and the structural important to note the importance to introduce table with parameters to estimate this damage reinforcement is the responsible to held the in the mathematical model the interphase index. 4. Conclusion PSEHWXLMWMWERSZIVWMQTPMƼGEXMSRXLEXPIEHWXS FIX[IIRHMJJIVIRXQEXIVMEPWXSEGGYVEXIP]HIƼRI Aside from that, there is another reason against oversized reinforcements, there are methods the reinforcement behaviour. During these last years the AEC Industry has the adoption of BIM in every rehabilitation proposed by several authors to determine -Uncertainty in the structural behaviour: This adopted BIM and made use of its advantages. project: the difference in scope. A rehabilitation the part that the existing element can handle. has to be understood from two different points. Simultaneously to this technological change does not have to affect the whole building (Calavera, 2005) (Hangaru et al., 1997) (Teng et On the one side, the structural behaviour there has been a shift in the business model neither have a great budget. But when using al., 2002) (Newman, 2001). HIƼRIH [LIR XLI SVMKMREP HIWMKR [EW QEHI as the number of rehabilitation projects have BIM, we need to create a digital model of the Nowadays, there are several materials which are Generally speaking there are three methods drastically increased. The use of BIM has building, which implies an investment in time widely being used to reinforce a structure and to do the structural design (lineal, lineal with been focused on new buildings and has been and economy by a professional. This extra different applications of them depending on the redistribution and non-linear) the application ignoring this business change, but it can also time, increases the budget and the delivery time effort to resolve. To determine these techniques of any of these generates deviations of the provide its advantages to these projects. The in small projects and it can suppose a great and the materials used we have conducted results from the others (Calavera, 2005) and problems that prevent the adoption of BIM for impact which leads to the decision of not to use a bibliographical research and extracted the can imply some mistakes when studying the the structural rehabilitation are: the BIM methodology. most common used materials and solutions to structural behaviour. On the other side, there - Lack of data of the existing building in need This is not a problem in the buildings that reinforce a structure. There are three materials MW XLI ƈVIEPƉ WXVYGXYVEP FILEZMSYV [LMGL GER SV of structural reinforcement, which makes already have a BIM model, because it can be that are broadly used to design reinforcement, can’t be the same as the original one, due to mandatory an intense data collection through updated with the current data and pathologies GSRGVIXI WXIIP ERH ƼFVI VIMRJSVGIH TPEWXMG WXVYGXYVEPQSHMƼGEXMSRWSVXSHMJJIVIRXIPIQIRXW technologies like point-cloud. and used for the new analysis regarding of its (FRP), and each one has some preferred uses. receiving structural loads. Phenomenon like - Inability of BIM software to handle small magnitude. It is not unreal to think, given the
286_block 5: building technology and advanced materials reactive proactive architecture_287
deviations among different elements (beam References Jung, J., Hong, S., Yoon, S., Kim, J., Heo, J., HIƽIGXMSRSVZIVXMGEPHIZMEXMSRW
2016. Automated 3D wireframe modeling AlAlmeida, J., Tenorio, R., Sánchez, E., Carballo, (MƾGYPX]MRHIXIVQMRMRKXLIWXVYGXYVEPHIWMKR R., n.d. BIMrras Podcast #15: BIM en of indoor structures from point clouds using and behavior. constrained least-squares adjustment rehabilitación y restauración, BIMrras - Inexistence of BPS tools destined to for as-built BIM. J. Comput. Civ. Eng. 30. Podcast. rehabilitation. https://doi.org/10.1061/(ASCE)CP.1943- Azhar, S., 2011. Building Information 5487.0000556 - Rehabilitation projects affecting only a section 1SHIPMRK &-1
8VIRHW &IRIƼXW 6MWOW 1EXˏNOE48SQIO%3RXSPSK]SJ&-1MR of a building and not justifying the creation of a and Challenges for the AEC Industry. a Construction Project Life Cycle. Procedia BIM Model of the building. Leadersh. Manag. Eng. 11, 241–252. Eng., Creative Construction Conference Despite these problems the rehabilitation https://doi.org/10.1061/(ASCE)LM.1943- 2017, CCC 2017, 19-22 June 2017, project can make use of the advantages 5630.0000127 Primosten, Croatia 196, 1080–1087. https:// provided by BIM. Due to the great adoption of Calavera, J., 2005. Patología de Estructuras doi.org/10.1016/j.proeng.2017.08.065 this methodology by the industry, in the next de Hormigón Armado y Pretensado, 2nd Newman, A., 2001. Structural renovation of Edition. ed. INTEMAC, Madrid. years the professionals will be gaining access buildings: methods, details, and design Chi, H.-L., Wang, X., Jiao, Y., 2014. BIM-Enabled to existing BIM Models when rehabilitating examples. McGraw-Hill, New York [etc.]. Structural Design: Impacts and Future a building making unnecessary the creation Observatorio de Vivienda y Suelo. Boletín Anual Developments in Structural Modelling, of the model for it and erasing some of the 2017, 2017. 96. Analysis and Optimisation Processes. problems. But further research is required to 6IFSPN ( 4Y˃OS > &EFM˃ 2˂ &M^NEO Arch. Comput. Methods Eng. 22, 135–151. integrate the structural rehabilitation as there is M., Mongus, D., 2017. Point cloud https://doi.org/10.1007/s11831-014-9127- ERIIHXSHIƼRIEHEQEKIMRHI\QIXLSHERHXS quality requirements for Scan-vs- 7 BIM based automated construction create a BPS tool able to design the structural Diao, Y., Kato, S., Hiyama, K., 2011. Development progress monitoring. Autom. Constr. reinforcement into BIM. of an optimal design aid system based 84, 323–334. https://doi.org/10.1016/j. on building information modeling. Build. autcon.2017.09.021 Simul. 4, 315–320. https://doi.org/10.1007/ Teng, J.G., Chen, J.F., Smith, S.T., Lam, L., 2002. s12273-011-0054-3 FRP-strengthened RC structures. John Eastman, C.M., Teicholz, P., Sacks, R., Liston, Wiley & Sons, Chichester [etc.]. K., 2011. BIM handbook : a guide to Vegas López-Manzanares, F., 2017. Aprendiendo building information modeling for owners, a restaurar: un manual de restauración de managers, designers, engineers, and la arquitectura tradicional de la Comunidad contractors, 2nd ed. ed. John Wiley & Sons, :EPIRGMERE 'SPIKMS 3ƼGMEP HI %VUYMXIGXSW cop2011, Hoboken, NJ. de la Comunidad Valenciana, Valencia. European Parliament, 2014. Directiva 2014/24/ Volk, R., Stengel, J., Schultmann, F., 2014. Building UE. Information Modeling (BIM) for existing Fernández-Mora, V., 2018. Black Box Effect in buildings — Literature review and future the structural project. Archi-DOCT 10, 39– needs. Autom. Constr. 38, 109–127. https:// 52. doi.org/10.1016/j.autcon.2013.10.023 Frequently Asked Questions About the National Zou, Y., Kiviniemi, A., Jones, S.W., 2017. A review BIM Standard-United StatesTM | National of risk management through BIM and BIM- BIM Standard - United States [WWW related technologies. Saf. Sci., Risk analysis Document], 2016. URL https://www. and land use planning: managing safety on nationalbimstandard.org/faqs (accessed the short and long range 97, 88–98. https:// 3.14.16). doi.org/10.1016/j.ssci.2015.12.027 Hangaru, A.D., Barbat, A.H., Oñate, E., 1997. Metodología de evaluación del deterioro en estructuras de hormigón armado, 1st Edition. ed, Monografía CIMNE. CIMNE, Barcelona. ITeC, 2015. La implantación del BIM en España. ITeC - Inst. Tecnol. Constr.
288_block 5: building technology and advanced materials reactive proactive architecture_289