San Pedro Local Development Investment Program 2017-2022
San Pedro Local Development Investment Program 2017-2022
BY PROGRAM/PROJECT/ACTIVITY BY SEC
2017 - 2022
CITY OF SAN PEDRO
PROVINCE OF LAGUNA
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
INSTITUTIONAL SECTOR
EXECUTIVE SERVICES
1 Personal Services
Page 1
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
6 Fidelity bond of Accountable Officer OM 2017 2022 Fidelity bond paid Gen Fund
Page 2
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Other MOOE (Petty Cash Fund, other For other supplies and petty cash
19 OM 2017 2022 Gen Fund
Supplies) fund provided
Page 3
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
36 Purchase of Mini Dump Truck, Barangay OM 2019 2019 Mini Dump Truck procured 20% Fund
Riverside
37 Purchase of Mini Dump Truck, Barangay OM 2019 2019 Mini Dump Truck procured 20% Fund
Rosario
Purchase of Mini Dump Truck, Barangay
38 San Vicente OM 2019 2019 Mini Dump Truck procured Gen Fund
Page 4
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 5
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 6
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
62 Procurement of Vehicle IAS 2018 2018 Vehicle for office use procured Gen Fund
Sub-total
LOCAL GOVERNANCE SERVICES
65 Personal Services - POSO TRU/TFRB POSO/TRU 2017 2022 Overtime Pay Gen Fund
Maintenance and Other Operating Expenses
Page 7
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 8
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
74 Provision of Ammunition POSO/TMU 2018 2022 Reserved for Armament Gen Fund
75 Provision of Logistical Support POSO/TMU 2019 2022 Fuel, Oil, Lubricants, etc. paid GF/POPS
Participation on Trainings/Seminars on
76 POSO/TMU 2019 2022 Training and seminar participated GF/GAD
Safety
Capital Outlay
Computerization of POSO-TMU
Redeeming Office Redeeming office computerized for
78 POSO/TMU 2019 2019 Gen Fund
* Filtering of Records easy access of records
* Provision of Violators
Page 9
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
83 Acquisition of Motor Vehicle POSO/TMU 2018 2019 Motor vehicle procured GF/POPS
Page 10
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Capital Outlay
91 Purchase Computer Software POSO/TRU 2019 2022 Computerized system established Gen Fund
Page 11
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Procurement of Fire fighting Tools and Fire fighting Materials & Tools
100 CFAU 2019 2019 Gen Fund
Equipment acquired
Enhance Fire Safety Information
Mayor LSC Fire Brigade Olympics
Campaign thru Fire Brigade
101 CFAU 2018 2022 celebrated; Fire brigades well-trained GF/POPS
Competitions, Fire Olympics,
and equipped
Motorcade
Fire station/Electricity/Water Adequate and reliable source of water
102 CFAU 2019 2022 GF/POPS
Expenses provided
Page 12
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
109 Fire Prevention Program BFP 2019 2022 Fire Prevention program conducted GF/POPS
110 Fire Safety Awareness Campaign BFP 2018 2022 Fire awareness campaign conducted GF/POPS
112 Land (Donated by Alvarez Property) CFAU 2019 2019 Land area for Fire station donated Gen Fund
Construction of Fire Sub-station New fire station established to
113 CFAU 2018 2022 Gen Fund
in Upper Villages (Bldg.) improve reaction time efficiency
Page 13
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Procurement of Fire Fighting Tools
Firefighting materials & tools
115 and CFAU 2017 2022 GF/POPS
acquired
Equipment for fire suppression
116 Procurement of Motor Bike/Fire Bike CFAU 2019 2019 Motor vehicles purchased GF/POPS
117 Procurement of Motor Vehicle BFP 2019 2019 Motorcycle purchased GF/POPS
118 Procurement of Penetrator Truck BFP 2019 2019 2 Penetrator trucks purchased Gen Fund
Land Acquisition for the construction Lot for the Central Fire Station Bldg.
119 BFP 2019 2022 Gen Fund
of Central Fire Station acquired
Page 14
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Rehabilitation/Renovation of Fire
Rehabilitation/Renovation of Fire
126 Auxiliary Unit in Pacita or the BFP/CFAU/Eng'g 2019 2022 Gen Fund
Auxiliary or Relocation of BFP done
Relocation of BFP Unit
Sub-total
LOCAL GENDER AND DEVELOPMENT DIVISION
127 Personal Services GAD 2019 2022 Overtime and other expenses paid Gen Fund
Capital Outlay
130 Purchase of office equipment GAD 2019 2022 Office equipment procured Gen Fund
Sub-total
CIVIL SECURITY SERVICES
Maintenance and Other Operating Expenses
Page 15
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Public Attorney's Office OM/Acctg. 2017 2022 Subsidy to NGA provided Gen Fund
Fiscal's Office OM/Acctg. 2017 2022 Subsidy to NGA provided Gen Fund
Regional Trial Court OM/Acctg. 2017 2022 Subsidy to NGA provided Gen Fund
City Trial Court OM/Acctg. 2017 2022 Subsidy to NGA provided Gen Fund
Sub-total
Sub-total
Page 17
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
148 CLEAN & GREEN PROGRAM OM 2017 2022 Clean & Green Program implemented Gen Fund
Page 18
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Capital Outlay
Urban greening, beautification and
158 Urban greening and Rehabilitation SPUD 2020 2022 Gen Fund
rehabilitation done
Procurement of Handheld Radio,
159 Computer Digital SPUD 2019 2022 Other Equipment procured Gen Fund
Camera, Megaphone
25 Parks/open spaces including Pacita
160 Procurement of Landscape/Gardening Too SPUD 2019 2022 Gen Fund
Astrodome maintained
161 Procurement of Mini Dump Truck SPUD 2019 2022 Mini Dump truck procured Gen Fund
Sub-total
SOCIO-CULTURAL DEVELOPMENT SECTION
Maintenance & other Operating
162 Maintenance and other Operating Expenses OM 2019 2022 Gen Fund
Expenses paid
Sub-total
LEGISLATIVE SERVICES
Page 19
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
171 Codification of General Ordinances SP Secretariat 2019 2019 Ordinances codified Gen Fund
Capital Outlay
172 Equipment Outlay OVM 2017 2022 Equipment procured Gen Fund
173 Capital Outlay SP Legislation 2017 2022 Equipment procured Gen Fund
174 Office Equipment SP Secretariat 2017 2022 Equipment procured Gen Fund
OVM/SP
175 Purchase of new office Equipment 2019 2019 New office equipment purchased Gen Fund
Secretariat
180 Purchase of Furniture and Fixtures OVM 2019 2019 Furnitures & fixtures procured Gen Fund
Page 21
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Sub-total
Page 22
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
- Corporate Communications/Work
Ethics/Technical
Business Writing Seminar
Page 23
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Sub-total
Page 27
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
BUDGETING SERVICES
Hiring of Job Order personnel CBO 2017 2022 Job order personnel hired Gen Fund
Maintenance and Other Operating Expenses
207 Procurement of Office Supplies CBO 2017 2022 Office Supplies procured Gen Fund
208 Issuance of Budget Call CBO 2017 2022 Budget Call issued Gen Fund
209 Conduct technical budget hearing CBO 2017 2022 Technical budget hearing conducted Gen Fund
210 Prepare the Local Expenditure Program CBO 2017 2022 Local Expenditure prepared Gen Fund
Present the Budget Proposal to Local Chief Consolidated Budget Proposal
211 CBO 2017 2022 Gen Fund
Executive presented to Local Chief Executive
Submit Executive Budget to Sangguniang Executive Budget submitted to
212 CBO 2017 2022 Gen Fund
Bayan Sangguniang Bayan
Appropriation Ordinance for the
213 Budget Authorization, Review, Execution CBO 2017 2022 Gen Fund
Budget Year authorized
214 Budget Accountability CBO 2017 2022 Reports submitted Gen Fund
Preparation and issuance of Local Budget Local Budget Matrix prepared and
215 CBO 2017 2022 Gen Fund
Matrix issued
Page 28
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Sub-total
TREASURY MANAGEMENT SERVICES
Plantilla Personnel & 2 RC
222 Personal Services CTO 2017 2022 Gen Fund
compensated
Maintenance and Other Operating Expenses
Page 29
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
225 Revision of Revenue Code CTO 2019 2019 Professional Services paid Gen Fund
226 Acquired Accountable Forms CTO 2017 2022 Collections received thru A/F Gen Fund
227 Fidelity Bond of Accountable Officers CTO 2017 2022 Remitted Fidelity Bonds Gen Fund
233 Procurement of Motor Vehicle (SUV) CTO 2019 2019 Motor vehicle procured Gen Fund
234 Revision of Revenue Code CTO 2019 2019 Revenue Code revised Gen Fund
Sub-total
ACCOUNTING SERVICES
Page 30
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
235 Personal Services Acctg. Office 2017 2022 Plantilla Personnel & RC compensated Gen Fund
238 Provision of Office Supplies & Materials Acctg. Office 2017 2022 Continuous office operation Gen Fund
240 Capability building/training Acctg. Office 2019 2019 Capability building improved GAD
242 Upgrading of Office Equipment Acctg. Office 2019 2019 Office equipment upgraded Gen Fund
243 Procurement of ICT Equipment Acctg. Office 2019 2019 ICT equipment purchased Gen Fund
244 Procurement of Furnitures and Fixtures Acctg. Office 2019 2019 Furnitures & fixtures procured Gen Fund
Page 31
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
247 Financial Reporting Program Accounting 2019 2019 Financial reporting services improved Gen Fund
Sub-total
AUDITING SERVICECS - COA
255 Network Layout MIS 2019 2022 MIS Services enhanced Gen Fund
256 Database and Network Server MIS 2019 2022 Upgraded sofware procured Gen Fund
Licensing of Software
257 Operating System/Anti-Virus/MS MIS 2019 2020 Licensed software utilized Gen Fund
Office/AutoCAD/ STAAD
Page 33
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Sub-total
REAL PROPERTY TAX ASSESSMENT SERVICES
258 Personal Services Assessor 2017 2022 Plantilla Personnel & RC compensated Gen Fund
260 Training & Seminars Assessor 2017 2022 GAD Mainstreamed GAD
261 Printed Forms Assessor 2017 2022 Printed Forms procured Gen Fund
Tax Mapping Project of all Real Properties
Pre-field Activities- Personal
Services/MOOE/Capital Outlay
Field Activities- Personal
All Real Property Units within the City
262 Services/MOOE/Capital Outlay Assessor 2017 2020 Gen Fund
tax-mapped
Post-field Activities- Personal
Services/MOOE/CA
Job Order (JO) hired
Page 34
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
272 Personal Services CHRMO 2019 2022 Plantilla Personnel & RC compensated Gen. Fund
Page 36
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 37
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 38
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
294 Litigation and Case Management CLO 2019 2022 Number of cases managed Gen Fund
296 Trial Court Case Representative CLO 2019 2022 Number of trial cases represented Gen Fund
297 Administrative Proceedings CLO 2019 2022 Number of cases handled Gen Fund
Number of cases and clearances
298 Legal Assistance to Barangay Captains CLO 2019 2022 Gen Fund
prepared
299 Contract Review and Preparations CLO 2019 2022 Number of contracts reviewed Gen Fund
Capital Outlay
300 Purchase of ICT Equipment CLO 2019 2019 Office equipment procured Gen Fund
Sub-total
PUBLIC AFFAIRS AND INFORMATION
SERVICES
Plantilla Personnel and RC
301 Personal Services PAIO 2017 2022 Gen Fund
compensated
Page 39
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Layout and Production of Local News 10,000 copies of "Ang Susi" Magazine
303 PAIO 2017 2022 Gen Fund
Publication ("Ang Susi") per year
Writing news/Photo releases for 5,000 copies of annual report "Ulat ng
304 PAIO 2019 2022 Gen Fund
publication (Ulat ng Bayan) Bayan" each year
Press Releases for Local Media (Gabay ng
305 PAIO 2017 2022 Media Press releases published Gen Fund
Bayan)
306 Professional Services (Media Relation) PAIO 2017 2022 Professional Services paid Gen Fund
Advertisements in National
307 PAIO 2017 2022 Advertisement paid Gen Fund
Newspaper/Souvenir Program
Printed Programs, Certificates,
Assistance on the preparation of
308 PAIO 2017 2022 Plaques/Logos, Flyers, Brochures, Gen Fund
Events/Programs/Activities and IEC
Leaflets, etc
309 Prepares AVP / Powerpoint Presentation PAIO 2017 2022 Number of AVP/Powerpoint prepared Gen Fund
312 Web Hosting PAIO 2017 2022 Web hosting paid Gen Fund
313 Trainings & Seminars PAIO 2018 2022 Gender Sensitivity & Awareness GAD
Page 40
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Capital Outlay
Sub-total
TOTAL
SOCIAL SECTOR
PUBLIC EMPLOYMENT SERVICES
319 Personal Services PESO 2017 2022 Plantilla Personnel Compensated Gen Fund
Page 41
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
323 Labor Education for Graduating Students PESO 2017 2022 No. of sessions conducted per year Gen. Fund
333 Work Orientation Program (WOP) Seminar PESO 2017 2022 No. of monthly seminars conducted GAD
Page 42
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
337 Skills Registry System PESO 2017 2022 Skills available determined Gen Fund
338 OFW Help Desk Seminar PESO 2017 2022 OFW Help Desk established Gen Fund
Page 43
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 44
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 45
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 46
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Orientation/Seminar on Barangay
CSWD/BRGY Information dissemination of updates
372 Council for 2017 2022 GAD
LnB/DepEd re-BCPC conducted
the Protection of Children (BCPC)
Drug Abuse Rehabilitation Program- Dynamic process toward the wholistic
373 Community-based after care CSWDO 2018 2022 change of a drug dependent Gen Fund
program conducted
Page 47
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Capital Outlay
Rehabilitation Center to cater to drug
381 Construction of Rehabilitation Center CSWDO/ENG'G 2019 2022 dependents from the locality Gen Fund
established
Page 48
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
389 Daycare School Equipment CSWDO 2018 2022 Daycare school equipment procured Gen Fund
Sub-total
SOCIALIZATION OF SENIOR CITIZENS
Page 49
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 50
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
411 Legal Clinic for PWDs (RA 7277) CSWDO/PWD 2017 2022 Free Legal assistance provided PWD Fund
Education Support & Scholarship Financial assistance/ scholarships to
412 (RA 7277, CSWDO/PWD 2018 2022 PWD: Pre-school, Elementary, PWD Fund
RA1179; RA 3562, EO 417) Highschool & College granted
Page 51
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 52
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
430 Legal Programs for PWD CSWDO/PWD 2019 2022 Legal Programs for PWD provided PWD Fund
431 Symposium on the Rights of PWD CSWDO/PWD 2019 2022 Symposium for PWDs conducted PWD Fund
Life survival skills training in time of
432 PWD Life Skills Training Program CSWDO/PWD 2019 2022 disaster and other unpredicted PWD Fund
circumstances conducted
Page 53
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 54
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
445 Personal Services CUDHO/CASTF 2017 2022 Plantilla Personnel compensated Gen. Fund
Page 55
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 56
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
CUDHO/CASTF/
458 Conduct assembly/ meetings 2019 2022 Well informed illegal settlers Gen. Fund
CSWDO/Legal
CUDHO/CASTF/
459 Clearing Operations 2019 2022 Area cleared Gen. Fund
CSWDO/ENG'G
460 Information Campaign CUDHO/CASTF 2017 2022 Informal settlers informed Gen. Fund
Installation of tarpaulin
461 CUDHO/CASTF 2017 2022 Secured government spaces Gen. Fund
signages
Page 58
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
481 Personal Services DYSD 2017 2022 Plantilla Personnel compensated Gen Fund
485 Youth Festival/Youth Assembly DYSD/OM 2017 2022 City Youth Assembly conducted Gen Fund
Youth week Celebration and other
Youth Week Celebration
National &
/Int'l.
486 International Youth Celebrations & DYSD/OM 2017 2022 Gen Fund
Youth Observance Program /Int'l. &
Awareness
National Youth Awareness Program
495 Youth Summit DYSD 2018 2022 City Youth Summit conducted Gen Fund
Financial Assistance to Community
Community Youth Organizations
496 Youth DYSD/OM 2017 2022 Gen Fund
established
Organization Activities
Sports complex facilities well
Community Sports Facilities
497 2017 2022 maintained- e.g. Basketball Gen Fund
Improvement) DYSD/OM/ENG'G
Fiberglass board
Other Supplies: Sports Supplies Sports Center supplies and
498 DYSD 2017 2022 Gen Fund
and Materials materials procured
Capital Outlay
Lot Acquisition of Sports
Lot for Sports Complex
499 Complex/Evacuation DYSD/OM 2020 2020 Gen Fund
/Evacuation Center procured
Center
Sports Complex/Permanent City of San Pedro Sports Complex
500 DYSD 2020 2022 Gen Fund
Evacuation Center constructed
Sports Center facility equipment
501 Sports Center other Equipment DYSD 2017 2022 Gen Fund
procured
IT equipment and office Furniture
502 Office Equipment DYSD 2019 2019 Gen Fund
procured
503 Office Vehicle DYSD 2019 2019 Office transportation service procured Gen Fund
Sub-total
CIVIL REGISTRATION SERVICES
Plantilla Personnel compensated;
504 Personal Services LCR 2017 2022 Gen Fund
Job orders hired
Maintenance and Other Operating
Expenses
Page 61
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
514 Personal Services SPTI 2017 2022 Plantilla personnel compensated Gen Fund
Capital Outlay
523 Construction of new SPTI building SPTI 2019 2019 New SPTI building constructed 20% Fund
Barangay constituents are
Training on Wheels Program (other
524 SPTI 2017 2022 equipped with livelihood training GAD
equipment)
and development
Construction of Laboratory More trainees accommodated and
525 Rooms/Work Station SPTI/ENG'G 2019 2022 provided conducive learning Gen Fund
Classrooms (1st Phase) workshops
Purchase of additional Equipment, TESDA training and competency
526 Training SPTI/ENG'G 2019 2022 standard training materials Gen Fund
Materials and Tools complied
Sub-total
PEACE & ORDER PROGRAM
Maintenance and Other Operating
Expenses
Strengthening People's Law
Honorarium and travelling
527 Enforcement Board OM/PLEB 2017 2022 Gen Fund
expenses provided
(PLEB members)
Functionalities of CADAC/CPOC
529 Regular meetings of CADAC & CPOC OM/PNP/DILG 2018 2022 Gen Fund
strengthened
Project Double Barrel/Anti-Illegal
530 OM/PNP 2017 2022 IEC against illegal drugs conducted Gen Fund
Drug Campaign
Page 64
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 65
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
541 Subsidy to PNP and NUP Personnel PNP/OM/SP 2017 2022 Assistance to PNP provided Gen Fund
542 Training of BPATS PNP/OM/BRGY 2019 2022 BPATs strengthened Gen Fund
543 VAWC Trainings PNP/CSWD 2019 2022 VAWC Trainings conducted Gen Fund
544 Capability Building Seminar/Training PNP/OM/SP 2017 2022 Police Force strengthened Gen Fund
546 Seminar on HIV/AIDS PNP/CHO 2019 2022 HIV Awareness Seminar conducted Gen Fund
CADAC/BADAC Seminar
547 Seminar on CADAC/BADAC PNP/OM/BRGY 2019 2022 Gen Fund
conducted
548 Provision of Ammunitions PNP/OM/SP 2019 2022 Ammunitions provided to PNP Gen Fund
Anti-illegal Drugs Campaign and
549 Anti-Crime PNP/CADAC/BAD 2018 2022 90% Barangays Drug-Cleared Gen Fund
Operations AC
House to House visitation (Oplan Oplan Tokhang and Project
550 Tokhang & PNP/CADAC/BAD 2018 2022 Double Barrel Operations Gen Fund
Project Double Barrel) AC implemented
Conduct Anti-Illegal Gambling Operations against illegal
551 OM/PNP/LnB 2018 2022 Gen Fund
Operations gambling conducted
Manhunt Operations Against Most
552 Wanted and PNP 2019 2022 Manhunt Operations conducted Gen Fund
other Wanted Persons
Campaign and Operation against
553 Loose Firearms PNP 2019 2022 Oplan Katok conducted Gen Fund
(Search Warrant/Oplan Katok)
Page 66
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
564 Manhunt Operations - Survellance E PNP/CADAC/BAD 2019 2019 Surveillance equipment procured Gen Fund
AC
Law enforcement and heightened
565 Police visibility - PNP/OM 2019 2019 Police boxes provided Gen Fund
3 Police Boxes
Page 68
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
587 Greyhound Operation (Oplan Linis) BJMP/OM 2019 2022 Greyhound Operation conducted Gen Fund
Page 69
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
596 Acquisition of Long Firearms BJMP/OM 2018 2018 Long firearms procured GF / POPS
597 Construction of Roofdeck BJMP/OM 2019 2019 Roofdeck constructed Gen Fund
598 Roofing of BJMP 3rd floor BJMP/OM 2019 2019 BJMP 3rd floor roofed Gen Fund
599 Water Supply System BJMP/OM 2019 2022 Water supply provided Gen Fund
Other Equipment (Portable
Generator Set, CCTV
600 Camera, DSLR Camera, Dash Cam, BJMP/OM 2019 2019 Other equipment provided Gen Fund
Bullet Proof
Vest, Sound System)
Page 70
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 71
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
622 Foundation Day Celebration SPPC/OM 2019 2019 SPPC Foundation day celebrated Gen Fund
Orientation of students and seminars
623 Orientation and Seminar for Students SPPC/OM 2019 2022 Gen Fund
conducted
624 Provision of School and Office Supplies SPPC/OM 2019 2022 School & office supplies provided Gen Fund
Page 73
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Sub-total
HEALTH SERVICES PROGRAM - 4411
Page 75
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 76
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 77
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 78
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
668 Smoke-Free Program CHO 2019 2022 Smoke-free program implemented Gen Fund
Seminar/Training program on
Capability Building/Seminar & Advance Cardiac Life Support &
669 CHO 2017 2022 GF/GAD
Training Basic Life support participated
670 Nutrition Program CHO/Nutrition 2017 2022 Feeding Program implemented GAD
671 Nutrition Month Celebration CHO/Nutrition 2019 2022 Nutrition month celebrated Gen Fund
672 Milk Feeding Project CHO/Nutrition 2017 2022 Milk Feeding provided GAD
Nutrition and Lectures during Nutritious food and lectures
673 disasters and CHO/Nutrition 2019 2022 provided to Evacuees Gen Fund
emergencies
Kitchen for nutrition program
674 "Kusina ni Baby” (Mobile Kusina) CHO/Nutrition 2017 2022 Gen Fund
established
Lactation station at City Hall
675 Lactation Station CHO/Nutrition 2017 2022 Gen Fund
provided
Capital Outlay
676 Office Equipment CHO 2019 2019 Office equipment purchased Gen Fund
677 Medical Equipment CHO 2017 2022 Medical equipment purchased Gen Fund
678 Laboratory Equipment CHO 2019 2022 Laboratory equipment purchased Gen Fund
679 Dental Equipment CHO 2019 2022 Dental equipment purchased Gen Fund
680 Height Board CHO 2017 2022 Height board purchased Gen Fund
681 Salter Weighing Scale CHO 2017 2022 Salter weighing scale purchased Gen Fund
Page 79
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 80
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
694 Sanitation Printed Forms CHO-Sanitation 2017 2022 Sanitation forms procured Gen Fund
Page 81
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 82
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Laundry Services SPJLAEH 2018 2022 Laundry services provided Gen Fund
Linens & Curtains SPJLAEH 2018 2022 Linens & curtains provided Gen Fund
Anti-slip Rubber Matte SPJLAEH 2019 2022 Anti-slip Rubber Matte provided Gen Fund
Blood Product- Blood Station SPJLAEH 2019 2022 Blood Product provided Gen Fund
Pharmacy Unit SPJLAEH 2018 2022 Other supplies procured Gen Fund
Nutrition & Dietetics SPJLAEH 2018 2022 Medicines procured Gen Fund
Operating Unit SPJLAEH 2018 2022 Linens & cloth provided Gen Fund
ACU Wellness SPJLAEH 2018 2022 Linens & cloth provided Gen Fund
Aerobics/Zumba SPJLAEH 2018 2022 T-shirts procured Gen Fund
MIS Unit SPJLAEH 2018 2022 Other supplies procured Gen Fund
Newborn Screening
SPJLAEH 2018 2022 Filter paper procured Gen Fund
Program
Isolation Room SPJLAEH 2018 2022 Other supplies procured Gen Fund
Chemical & Filtering Supplies SPJLAEH 2018 2022 Oxygen refilled Gen Fund
Service Agreement SPJLAEH 2018 2022 Services guaranteed Gen Fund
717 Philhealth-Gov't Sponsored Program SPJLAEH 2018 2022 Services & benefits provided GF/GAD
Page 84
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 85
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Medical Equipment:
CT Scan = Php42 Million
Digital Mammogram = Php20
million
Breast Ultrasound = Php6
million
Emergency Unit = Php1 million
ECG Unit = Php70 thousand
Laboratory Unit = Php2 million
Operating Unit/OR Surgical
724 SPJLAEH 2019 2019 Medical equipment purchased Gen Fund
Instruments= Php1
million
Acu Wellness = Php750
thousand
Physical Rehab = Php100
thousand
Central Supply/ER Room = Php1
million
Isolation Room = Php30
thousand
Page 86
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Medical/Laboratory Equipment:
Hematology Analyzer
Nutrition & Dietetics, Isolation
Sterilizer/Steroid
Room, Dialysis Unit, ACU Wellness,
Phaco Machine
725 SPJLAEH 2018 2022 PRU, Specialty Clinics- Heart, Gen Fund
Nupon Air Cleaner with Filter
Ophtha, OR, Laboratory, Central
Bedside Tables and Furniture &
Supply
Fixtures
2D Echo, Treadmill Stress Test
Office Equipment:
Central Supply Room
CSR, Pharmacy, ECG Unit, Heart
Pharmacy Unit
726 SPJLAEH 2019 2019 Station, Specialty Clinic- Supplies Gen Fund
ECG Unit
and Equipment procured
Heart Station
Specialty Clinic
MIS Unit - Supplies and Equipment
727 Office Equipment - MIS Unit SPJLAEH 2019 2022 Gen Fund
procured
Physical Rehabilitation (Desktop
728 SPJLAEH 2019 2019 Desktop computer procured Gen Fund
Computer)
Mobile Mini Hospital, Motorcycle
729 Transportation Equipment SPJLAEH 2018 2022 Gen Fund
with Side Car
Ambulatory Surgical, Dialysis &
Procurement of Lot for Ambulatory Diagnostic Unit established for
730 SPJLAEH 2019 2019 Gen Fund
Surgical, expansion/uupgrading of SPJLAEH
Dialysis and Diagnostic Unit Health Services
Sub-total
GAVINO ALVAREZ LYING-IN CLINIC
(GALIC)
Page 87
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 88
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
740 Chemical & Filtering Supplies GALIC 2017 2022 Oxygen refill provided Gen Fund
741 Other MOOE GALIC 2019 2019 Other MOOE provided Gen Fund
Capability Building for GALIC
742 GALIC 2019 2022 Trainings & Serminars participated Gen Fund
personnel
Capital Outlay
Furnitures & fixtures and office
743 Furnitures & Fixtures GALIC 2018 2022 Gen Fund
equipment procured
Hospital Equipment, X-ray
744 Medical Equipment GALIC 2017 2022 Gen Fund
Equipment, Oxygen Tank
Lot acquired for LED and X-ray
745 Construction of GALIC Building GALIC 2019 Continuing GF/Continuing
Room
Establishment of GALIC Laboratory Hospital Laboratory and X-Ray
746 GALIC 2019 2022 Gen Fund
and X-Ray established
Renovation of 3rd Flr., GALIC Hospital
747 Bldg., with GALIC 2019 2019 GALIC facility renovated 20% Fund
Electricals
748 Diesel Generator for GALIC GALIC/ENG'G 2019 2019 Diesel generator provided 20% Fund
749 Upgrade Electrical System of GALIC GALIC/ENG'G 2019 2019 Electrical System upgraded 20% Fund
750 Procurement of Elevator GALIC 2018 2018 Elevator installed Gen Fund
751 Generator Set and Installation Cost GALIC 2018 2019 Generator Set installed Gen Fund
752 Expansion of GALIC Building GALIC 2019 2019 GALIC building extended Gen Fund
753 Sewerage Treatment Plant GALIC 2019 Continuing Sewerage system provided Gen Fund
Sub-total
TOTAL
ECONOMIC SECTOR
AGRICULTURAL SERVICES
Page 89
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
754 Personal Services Agriculture 2017 2022 Plantilla personnel compensated Gen Fund
Maintenance and Other Operating Expenses
Travelling expenses, Seminars,
755 MOOE Agriculture 2017 2022 Trainings and Meetings participated; Gen. Fund
Other MOOE
Demonstration area on edible
Urban Farming Demonstration Area langscaping, containerized gardening
756 Agriculture 2019 2022 Gen Fund
Project and mushroom production technology
created
Page 90
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
770 Office Equipment Agriculture 2019 2022 Office equipment procured Gen. Fund
Sub-total
VETERINARY SERVICES
Salaries & Wages and other Personnel
771 Personal Services Veterinary 2018 2022 Benefits compensated for the Plantilla Gen. Fund
personnel
Maintenance and Other Operating Expenses
Travelling Expenses, Office supplies,
772 MOOE Veterinary 2017 2022 Gasoline & Oil and other Professional Gen. Fund
Services
Page 91
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Seminars/trainings, Annual
Convention of PCMVLP( Provincial,City
Capability Building on Animal Health & Muncipal Veterinary League of the
773 Vetinerary 2018 2022 GF/GAD
Management Philippines) and PVMA (Philippine
Veterinary Medicine Association of the
Philippines attended
Page 92
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Capital Outlay
785 Lot Acquisition for Slaughterhouse Vetinerary 2019 2019 Lot for Slaughterhouse purchased Gen Fund
Construction of Slaughterhouse and Illegal slaughtering of hogs within the
786 Veterinary 2019 2019 DBM/NMIS
Wastewater Treatment Plant city eliminated
Lot Acquisition for Pet Cemetery/Animal Lot for Pet Cemetery and Animal
787 Veterinary 2019 2020 Gen Fund
Pound Pound procured
Construction of Pet Cemetery/Animal Roaming dogs along streets and
788 Veterinary 2019 2020 Gen. Fund
Pound subdivisions eliminated
Illegal slaughtering of chickens sold in
789 Veterinary 2020 2022 Gen. Fund
Construction of Poultry Dressing Plant the market eliminated
790 Procurement of Office Equipment Veterinary 2019 2022 Office equipment procured Gen. Fund
Other Equipment - Autoclave Portable
791 Vetinerary 2019 2022 Other equipment procured Gen Fund
Sterilizer
Regular monitoring of livestock even
792 Acquisition of Service Vehicle (L-300) Veterinary 2019 2019 in remote areas with unpleasant Gen Fund
condition
Sub-total
ECONOMIC ENTERPRISE & MANAGEMENT SERVICES
Page 93
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
796 Syphoning, Declogging of canal SPTC 2019 2022 Complete discharge of septic waste Gen Fund
798 Capacity Development SPTC 2018 2022 Trainings/Seminars participated Gen Fund
GAD awareness seminar for SPTC tenants
GAD awareness among tenants and
799 and SPTC 2019 2019 GAD
vendors promoted
vendors
Capital Outlay
Wastewater disposal of SPTC in
800 Construction of Sewage Treatment Plant SPTC/OM 2019 2019 compliance with DENR and LLDA Gen Fund
improved
Renovation of San Pedro Town Center
Infrastructure development of SPTC
(Ground
801 SPTC/OM 2019 2019 with site improvement and parking Gen Fund
floor and Second floor)
garage
Page 94
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
809 TCA 2019 2019 Lenten Season program conducted Gen Fund
Pabasa ng Bayan/Lenten Exhibit
Program honoring the Veterans
810 Veterans Day/Araw ng Kagitingan TCA 2017 2019 Gen Fund
conducted
811 Independence Day / Rizal Day Celebrat TCA 2017 2019 Independence day celebrated Gen Fund
812 Nutrition Month TCA 2017 2017 National Event Gen Fund
National Event participated by
813 Buwan ng Wika TCA 2017 2019 Gen Fund
students
National Event honoring the heroes
814 National Heroes Day TCA 2017 2019 Gen Fund
participated
Page 95
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
National/World Tourism/Linggo ng
Programs conducted. Tourism edge
815 Kasuotang TCA 2017 2019 Gen Fund
improved to increase Tourist visits
Pilipino
816 LSC Awards TCA 2017 2019 Recognition of Awardees conducted Gen Fund
819 Bonifacio Day TCA 2017 2019 National event celebrated Gen Fund
820 Cityhood Anniversary/Paskuhan TCA 2017 2019 Cityhood and Paskuhan celebrated Gen Fund
821 LGBT Show or other Training TCA 2017 2019 LGBT talents featured/ recognized GAD
822 Other MOOE OM/TCA 2019 2022 Other MOOE procured Gen Fund
Page 96
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Capital Outlay
828 Procurement of Office Equipment OM/TCA 2019 2019 Office equipment purchased Gen Fund
830 Establishment of Sampaguita Center OM/TCA 2019 2022 Sampaguita Center established Gen Fund
Cultural Projects:
1) Purchase of land for Sampaguita
Plantation
2) Lease, purchase of Heritage house
831 TCA 2019 2019 Different Cultural Projects conducted Gen Fund
to serve
as Restaurant and Museum
3) Sampaguita products/promotional
efforts
832 Procurement of 2 Laptop computers TCA 2019 2020 Office equipment procured Gen Fund
Adaptive Reuse of Old Municipal Hall into a SP City Cultural & Heritage Center
833 Cultural & TCA 2019 2022 Gen Fund
Heritage Center established
Construction of the Shrine of the Risen Shrine constructed to attract Local &
834 TCA/ENG'G 2020 2022 Gen Fund
Christ Foreign Tourists
Sub-total
CULTURAL PROJECTS
Maintenance and Other Operating Expenses
835 Other MOOE OM/TCA 2017 2022 Other cultural events fund provided Gen Fund
Sub-total
Page 97
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
841 Barangay Business Forum BPLO 2019 2019 Forum in 27 Barangays conucted Gen Fund
Page 98
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
844 Maintenance of new BPLS Software BPLO 2019 2019 BPLS Software well maintained Gen Fund
"Kapatid Mentor Me Project"
845 "Kapatid Mentor Me Project" BPLO 2019 2019 Gen Fund
implemented
Page 99
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Capital Outlay
852 Procurement of ICT Equipment BPLO 2019 2019 ICT Equipment purchased Gen Fund
Page 100
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
858 Repair and Maintenance of building CCLO 2019 2022 Office building repaired/ maintained Gen Fund
Page 101
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
862 Sustainable Livelihood Projects CCLO 2017 2017 Livelihood budget provided Gen Fund
Seed Money provided to established
863 Subsidies-Grants (Seed money) CCLO 2018 2022 GF/GAD
Cooperatives
864 Training on Cut Flower Livelihood Program CCLO 2017 2017 Livelihood training conducted Gen Fund
865 Seminars and Trainings/Team building CCLO 2019 2022 Seminar/Team building conducted GAD
870 Technical Review Committee/Board CCLO 2019 2019 Technical Review Board established Gen Fund
Capital Outlay
872 Procurement of Office Equipment CCLO 2019 2022 Office equipment purchased GF/GAD
Page 102
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
879 Other Supplies and Materials CENRO 2019 2022 Other supplies & materials procured Gen Fund
880 Printing and Publication CENRO 2019 2022 Printing & publication provided Gen Fund
881 General Services - JO CENRO 2019 2022 JO compensated Gen Fund
882 Livelihood Program CENRO 2019 2022 Livelihood Program availed GAD
Page 103
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Environment Compliance
Monitoring in the
Environmental compliance in the
884 implementation of ESWM (RA 9003) CENRO 2019 2022 Gen Fund
ESWM (RA 9003) implemented
and all
environmental laws
885 Monitoring on Garbage Hauling CENRO 2019 2022 8,000 Trucks monitored Gen. Fund
Intensify Information Education
Campaign (IEC)
on Solid Waste Management
(SWM)= P300,000
- Improper disposal of liquid
waste= P50,000 CENRO/Brgys, Orientations/seminars conducted. IEC
886 2017 2022 Gen. Fund
- Siltation of water waste= HOAs materials purchased/printed
P100,000
- Poor air quality= P20,000
Page 104
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Environmental Laws/Issuance of
citation tickets to violators enforced;
Implementation and Enforcement
890 CENRO, Brgys 2017 2022 Printing of new citation tickets for Gen. Fund
of
environmental enforcers; Printed
Environmental Laws
Forms provided
Environment Friendly Day/Earth Environment-Friendly Day
891 CENRO 2018 2022 Gen. Fund
Hour Program activities/IEC conducted
Regular Tree Trimming and Grass Tree Trimming and Grass Cutting
893 CENRO 2019 2019 Gen Fund
Cutting conducted
Development of Green Urban
Centers, Climate Change Adaptation and
894 CENRO 2017 2022 Gen Fund
Infrastructures, Structures and Mitigation initiative
Open Spaces
CENRO,Brgys,
De-clogging of drainage, rivers City flood management
895 NGOs and other 2019 2022 GF/CDRRMF
and creeks improved/maintained
Civic Organizations
CENRO,Brgys,
Dredging and desilting of City flood management
896 NGOs and other 2019 2022 GF/CDRRMF
rivers/creeks and waterways improved/maintained
Civic Organizations
CENRO,
Tree Planting and Pruning/DRR 300 trees planted per year to reduce
897 Brgys,SPRBC, 2019 2022 GF/CDRRMF
Equipment risk of flooding
NGOs
Page 105
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
CENRO, Brgys,
500 trees/ornamental plants planted
899 Urban Greening Program NGO. Schools and 2019 2022 Gen. Fund
every year
Civic Org.
900 Other Innovative Projects CENRO 2017 2017 Conducted other related programs Gen. Fund
Page 106
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
905 Welding Machine - Green Urban Center CENRO 2018 2018 Unit purchased Gen Fund
Page 107
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Procurement of Equipment:
a) Long Arm Pruner = P15,000
b) Grass Cutter with blade =
909 P105,000 CENRO 2019 2022 Equipment purchased Gen. Fund
c) Biogas digester = P50,000
d) A Ladder = P15,000
e) Scaffolding = 25,000
Purchase of Transportation
910 CENRO 2019 2022 Transportation equipment procured Gen. Fund
Equipment
Other machinery & equipment
911 Other Machinery and Equipment CENRO 2019 2022 Gen. Fund
purchased
912 Establishment of City Waste to Energy Plan CENRO/ENG'G 2019 2022 City Waste to Energy established Gen Fund
City Sewage Treatment Plant
913 CENRO/ENG'G 2019 2022 Gen Fund
Establishment of City Wastewater Treatmen established
Established City Waste Museum
914 CENRO/ENG'G 2019 2020 Gen Fund
Establishment of City Waste Museum established
Walkway/Sampaguita Lane
915 CENRO/ENG'G 2020 2022 Gen Fund
San Isidro River Walkway/Sampaguita Lane constructed
Sub-Total
GARBAGE COLLECTION - 6522
916 Environment/Sanitary Services OM/CENRO 2017 2022 Garbage regularly collected Gen Fund
Sub-Total
ILLUMINATION/STREETLIGHTING - 6531
917 Electricity Expenses OM 2017 2022 Electric consumption paid Gen Fund
Sub-Total
OTHER SERVICES
Page 108
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 109
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 110
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 111
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 112
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 113
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 114
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 115
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 116
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 117
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 118
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 119
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Relief:
Relief and Relocation Center known to
* Relief/Food Commodities
the people with or without calamity is
* Medicines/other Relief Support
fully equipped;
938 services CDRRMO 2017 2022 GF/CDRRMF
Effective and fast response to any
* Communication services
disaster;
* Emergency Transportation services
Effective accommodation of evacuees
Recovery:
a) Housing
b) Materials
c) Seeds and other Farm Inputs Effective and fast rehabilitation and
939 CDRRMO 2017 2022 GF/CDRRMF
d) Monitoring and Evaluation recovery to any damages
e) Repair and Construction
f) Other Works and Services for
recovery
940 Lot Acquisition for CDRRMO Cluster Lots CDRRMO/ENG'G 2020 2020 CDRRM 4 Cluster area lots procured GF/CDRRMF
Page 120
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 121
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
947 Purchase of Pruning Equipment CDRRMO/CENRO 2019 2019 Pruning equipment purchased GF/CDRRMF
948 Construction of Retaining Walls CDRRMO/ENG'G 2019 2022 Retraining Walls constructed GF/CDRRMF
Heavy equipment and disaster
Purchase of Additional Disaster Vehicles vehicles of CDRRMC completed, in
949 and CDRRMO 2019 2022 order to accommodate DRRM GF/CDRRMF
Heavy Equipment activities and immediately respond to
emergency situations
Page 122
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 123
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 124
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Sub-Total
964 BMRR for every building owned GSO 2018 2022 BMRR maintained Gen Fund
or funded by
the city government
Enhancement training for
accountable
965 GSO 2018 2022 Training & Seminar attended Gen Fund
officers tasked to implement the
BMRR
Memorandum order to Day Care
Workers tasking them to report to the
966 Repair and Maintenance of Building GSO 2018 2022 Gen Fund
building maintenance team any
concern issued
Page 125
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Janitorial Section:
Assignment of specific tasks,
duties and
responsibilities of the
overseer, which include
reporting of any damage: Janitorial services effectively and
969 a) City Hall/Old Municipal GSO/ENG'G 2017 2022 efficiently provided; Gen Fund
Hall No. of janitors per shift assigned
b) JLAEH/GALIC
c) SPTC
d) Bulwagang Magsaysay
e) Evacuation Center
f) Pacita Astrodome
Page 126
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Security Section & Motorpool
Section:
Licensed Security Agency to Security services for City Hall and
970 GSO 2018 2022 Gen Fund
safeguard Motorpool rendered
and improve security
measures
Capital Outlay
Landscaping Section: Property Management Software and
a) Archiving System Software Archiving System Software using
971 GSO 2018 2022 Gen Fund
b) Property Management System available technology and applying
scientific method
972 Procurement of Motor Vehicle GSO 2019 2022 Vehicle for official use purchased Gen Fund
973 Acquisition of Office Equipment GSO 2019 2022 Office equipment procured Gen Fund
Installation of CCTV in the Security close monitoring and
974 GSO 2019 2019 Gen Fund
Motorpool supervision provided
977 Land Titling of all Government Properties GSO 2019 2022 All Government properties titled Gen Fund
Sub-Total
INFRAS TOTAL
TRUCTU
RE
ARCHITECTURAL AND PUBLIC INFRASTRUCTURE SERVICES
Page 127
SECTOR
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
983 Procurement of other Supplies and Materials ENG'G. 2019 2022 Other supplies & materials provided Gen Fund
984 Other MOOE: Installation of Rocket Pump ENG'G. 2019 2022 Rocket pump installed Gen Fund
Ensured efficient and effective
985 Procurement of Electrical/Carpentry Supplies ENG'G. 2017 2022 Gen. Fund
services
Ensured efficient and effective
986 Maintenance of Roads, Bridges & Buildings ENG'G. 2017 2022 Gen. Fund
services
Repair and Maintenance of Infrastructure Ensured efficient and effective
987 ENG'G. 2018 2022 Gen. Fund
Assets services
Ensured efficient and effective
988 Repair and Maintenance of Other PPE ENG'G. 2018 2022 Gen. Fund
services
Sub - Total
Capital Outlay
989 Procurement of other Equipment ENG'G. 2019 2022 Other needed equipment procured Gen Fund
990 Procurement of Service Vehicle ENG'G. 2019 2019 Service vehicle procured Gen Fund
Page 128
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 129
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
1001 Installation of Diesel Generator at new City Hall ENG'G. 2019 2019 Genset procured Gen Fund
Construction of Pantry at Sto. Niño Señor Citizen, Sto. Niño Señor Citizen Pantry in
1003 - 2019 2019 Gen Fund
Barangay Pacita 1 Pacita 1 constructed
1004 Development of open space at Phase 6 in Pacita 1 ENG'G 2019 2019 Park developed in open space area Gen Fund
Page 130
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 131
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Patching and asphalt overlay along Narra and Provided assistance to develop the
1016 ENG'G. 2019 2019 Gen Fund
Agoho Sts., Barangay Calendola barangay project
Rehabilitation of Drainage in Brgy. Pacita Complex Provided assistance to develop the
1017 ENG'G. 2019 2019 20% Fund
1 barangay project
Provided assistance to develop the
1018 Concrete road rehabilitation in 18th St., Pacita 1 ENG'G. 2019 2019 20% Fund
barangay projects
Road concreting in Bayan Bayanan near Provided assistance to develop the
1019 ENG'G. 2019 2019 Gen Fund
Hanging Bridge barangay project
Patching and asphalt overlay in VillaOlympia Ave., Provided assistance to develop the
1021 ENG'G. 2019 2019 20% Fund
Barangay Maharlika barangay project
Page 132
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Patching and asphalt overlay in Pacita Avenue, Provided assistance to develop the
1022 ENG'G. 2020 2020 Gen Fund
Barangay Pacita 1 barangay project
Patching and Asphalt Overlay in Valejo St., Provided assistance to develop the
1028 ENG'G. 2019 2019 20% Fund
Felipe St., & Carluen St., Barangay Chrysanthemum barangay project
Riprapping of San Isidro River of Buwaya Creek, Provided assistance to develop the
1029 ENG'G. 2019 2019 Gen Fund
Barangay Calendola barangay project
Page 133
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 134
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
1046 Installation of 50 Sets Solar Lights, Barangay Narra ENG'G. 2019 2019 Solar lighting installed 20% Fund
Page 135
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Slope Protection in Adelina 1 and Holiday Homes Provided assistance to develop the
1053 ENG'G. 2019 2019 CDRRM Fund
Ph 2, Barangay San Antonio barangay project
Page 136
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 137
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Finishing of existing unfinished HOA office PEA 2A, Provided assistance to develop the
1064 ENG'G. 2019 2019 20% Fund
Barangay Langgam barangay project
Renovation and Extension of Day Care Center in Brgy. Rosario Day Care Center
1066 ENG'G 2019 2019 GAD
Brgy. Rosario renovated
1068 Other Infrastructure Assets ENG'G. 2018 2022 Established other Infrastructure Assets Gen. Fund
1070 Installation of Diesel Generator at old City Hall ENG'G. 2019 2019 Genset procured Gen Fund
1071 Installation of Diesel Generator at GALIC ENG'G. 2019 2019 Generator Set installed Gen Fund
1073 Upgrading of Electrical System at GALIC ENG'G. 2019 2019 Electrical System upgraded Gen Fund
Page 138
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Construction on Pacita 2 School Bldg. - 8 Bldgs., 3 Pacita 2 School Bldg. (Medalla Lot)
1078 ENG'G 2020 2022 GF/LSB
Storey (Medalla Lot) constructed
Construction on Pacita 2 School Bldg. - 20 Bldgs., 3 Pacita 2 School Bldg. (Back of Villa
1079 ENG'G 2020 2022 GF/LSB
Storey, 15 Classrooms (back of Villa Castillo Lot) Castillo Lot) constructed
Page 139
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Page 140
Schedule of
Implementing
Program/ Project Activity Description Implementation
Project Office/ Expected Outputs Source of Funds
Number Agency Start Date
Completion
Date
Road Asphalt in HBC, Barangay Nueva to Barangay Provided assistance to develop the
1089 ENG'G. 2019 2019 20% Fund
San Vicente barangay project
1093 Renovation/Extension Building of Hall of Justice OM/ENG'G. 2,019 2,019 Project implemented Gen Fund
1096 Construction of City Hall Annex Bldg. (Phase 1) OM/ENG'G. 2019 2019 Project implemented Loan Proceeds
1105 Drainage Diversion Plan/Establishment of Spillway OM/ENG'G. 2019 2022 Project implemented Gen Fund
1106 Laguna Lake Development/Reclamation OM/ENG'G. 2020 2022 Project implemented GF/NGA
1107 PNR Commuter Train Stations OM/ENG'G. 2020 2022 Project implemented NGA
Sub-total
TOTAL
GRAND TOTAL
Page 142
EVELOPMENT INVESTMENT PROGRAM
GRAM/PROJECT/ACTIVITY BY SECTOR
2017 - 2022
Page 143
Amount of Climate Change
Amount
Expenditure
Page 144
Amount of Climate Change
Amount
Expenditure
- - - -
- - - -
Page 145
Amount of Climate Change
Amount
Expenditure
- - -
400,000
1,101,790 - - -
1,260,600 1,000,000 1,050,000 1,102,500 1,157,625
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
Page 146
Amount of Climate Change
Amount
Expenditure
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
6,000,000
1,500,000
1,500,000
1,500,000
Page 147
Amount of Climate Change
Amount
Expenditure
1,500,000
1,500,000
1,500,000
55,000,000
Page 148
Amount of Climate Change
Amount
Expenditure
- - -
1,700,000
24,592,751
Page 149
Amount of Climate Change
Amount
Expenditure
100,000 - - -
Page 150
Amount of Climate Change
Amount
Expenditure
24,000 - - -
200,000
200,000 - - -
- - -
350,000
500,000 500,000
Page 151
Amount of Climate Change
Amount
Expenditure
- - -
50,000
150,000 - - -
Page 152
Amount of Climate Change
Amount
Expenditure
100,000
- - -
1,000,000
2,640,000
15,000,000
1,500,000
Page 153
Amount of Climate Change
Amount
Expenditure
- - -
724,000
200,000 - - -
Page 154
Amount of Climate Change
Amount
Expenditure
- - -
5,430,000
600,000
200,000
- - -
5,000,000
Page 155
Amount of Climate Change
Amount
Expenditure
900,000
300,000
15,000,000
6,000,000
2,000,000
60,000
500,000 500,000
Page 156
Amount of Climate Change
Amount
Expenditure
50,000
1,150,000
1,750,000
450,000
- - 3,400,000 - - -
Page 157
Amount of Climate Change
Amount
Expenditure
Page 158
Amount of Climate Change
Amount
Expenditure
Page 159
Amount of Climate Change
Amount
Expenditure
5,400,000 - - -
- - -
- - -
5,500,000
250,000 705,957
455,957 - - -
Page 160
Amount of Climate Change
Amount
Expenditure
100,000 - - -
- - -
2,000,000
1,350,000
Page 161
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
- - -
- - -
Page 162
Amount of Climate Change
Amount
Expenditure
- - -
- - -
150,000 200,000 200,000 220,000 242,000 266,200
900,000 900,000 948,000 1,042,800 1,147,080 1,261,788
200,000 200,000 250,000 275,000 302,500 332,750
75,000 75,000
Page 163
Amount of Climate Change
Amount
Expenditure
- - -
Page 164
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
Page 165
Amount of Climate Change
Amount
Expenditure
- - - -
Page 166
Amount of Climate Change
Amount
Expenditure
Page 167
Amount of Climate Change
Amount
Expenditure
3,000,000 - - - -
Page 168
Amount of Climate Change
Amount
Expenditure
- - - -
- - - -
- - - -
- - -
400,000 3,000,000
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Page 170
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
- - -
- - -
200,000 100,000 100,000
- - -
- - -
Page 171
Amount of Climate Change
Amount
Expenditure
700,000 965,850 - - -
340,000 400,000 - - -
- - -
- - -
- - -
- - -
2,000,000
- - - -
13,282,567 14,527,219 30,747,755 28,522,531 31,354,784 34,470,262
Page 172
Amount of Climate Change
Amount
Expenditure
180,000
- - -
- - -
- - -
230,000
493,000
Page 173
Amount of Climate Change
Amount
Expenditure
- - -
- - -
Page 175
Amount of Climate Change
Amount
Expenditure
50,000 - - -
68,000 - - -
Page 176
Amount of Climate Change
Amount
Expenditure
Page 177
Amount of Climate Change
Amount
Expenditure
330,000 - - -
6,000 20,000 - - -
520,000 520,000 - - -
65,000 65,000 - - -
115,000 - - -
Page 178
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Page 179
Amount of Climate Change
Amount
Expenditure
- - -
96,000 96,000 - - -
Page 180
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
- - -
- - -
- - -
- - -
150,000 50,000 50,000 50,000
2,961,429 3,190,543 3,851,816 4,264,997 4,686,497 5,150,146
Page 181
Amount of Climate Change
Amount
Expenditure
600,000 600,000 - - -
- - -
500,000 500,000 - - -
- - -
- - -
2,250,000 1,400,000 - - -
- - -
30,000 - - -
- - -
Page 182
Amount of Climate Change
Amount
Expenditure
375,000
- 900,000
- 100,000
-
1,446,207 1,561,030 1,717,132 1,888,846 2,077,730 2,285,503
- - -
- - -
Page 183
Amount of Climate Change
Amount
Expenditure
48,000 48,000 - - -
- - -
Page 184
Amount of Climate Change
Amount
Expenditure
- - - -
- - -
120,000
70,000 70,000 - - -
- - -
100,000 650,000 - -
3,123,207 3,818,030 7,376,232 8,576,856 8,719,541 9,591,495
-
- - -
Page 185
Amount of Climate Change
Amount
Expenditure
- - - -
Page 186
Amount of Climate Change
Amount
Expenditure
- - - -
Page 187
Amount of Climate Change
Amount
Expenditure
260,000 - - - -
- - - -
1,000,000 600,000 - - -
Page 188
Amount of Climate Change
Amount
Expenditure
100,000 - - - -
- - - -
Page 189
Amount of Climate Change
Amount
Expenditure
5,650,000
- - -
13,000,000
5,000,000
10,000,000
3,000,000
Page 190
Amount of Climate Change
Amount
Expenditure
2,000,000 10,000,000
920,000
Page 191
Amount of Climate Change
Amount
Expenditure
- - -
- - -
850,000
350,000 - -
Page 192
Amount of Climate Change
Amount
Expenditure
200,000 200,000 - - - -
200,000 200,000 - - - -
300,000 300,000 - - - -
Page 193
Amount of Climate Change
Amount
Expenditure
55,000 - - -
55,000 - - - -
55,000 - - - -
55,000 - - - -
55,000 - - - -
55,000 - - - -
1,000,000 1,000,000 - - - -
1,000,000 1,000,000 - - - -
Page 194
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
40,000
60,000
Page 195
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
- - -
Page 196
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
- - -
50,000 55,000 60,500 66,550
1,035,000
- 500,000 - -
- - -
- - -
Page 197
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
Page 198
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
- - -
- - -
- - -
44,000 - - - -
- - -
- - -
- - -
Page 199
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
23,000,000
33,502,000
Page 200
Amount of Climate Change
Amount
Expenditure
21,000,000
1,200,000
- - -
Page 201
Amount of Climate Change
Amount
Expenditure
Page 202
Amount of Climate Change
Amount
Expenditure
- - -
22,000,000
500,000 - - -
500,000 - -
- - -
Page 203
Amount of Climate Change
Amount
Expenditure
- - -
300,000 500,000 - - -
- - -
- - -
- - -
1,500,000
1,060,000
Page 204
Amount of Climate Change
Amount
Expenditure
- - -
954,000
- - -
- - -
- - -
- - -
Page 205
Amount of Climate Change
Amount
Expenditure
- - -
500,000 300,000 - - -
Page 206
Amount of Climate Change
Amount
Expenditure
700,000 770,000
15,000,000 - - -
10,000,000 - - -
3,000,000 3,300,000 3,630,000 3,993,000
1,000,000 - - -
- - -
- - -
- - -
- - -
Page 207
Amount of Climate Change
Amount
Expenditure
200,000 220,000
252,000 277,200
1,500,000 - - -
360,000 - - -
Page 208
Amount of Climate Change
Amount
Expenditure
1,000,000 - - - -
- - -
400,000 - -
Page 209
Amount of Climate Change
Amount
Expenditure
20,000
900,000 - -
8,518,180 - -
2,500,000 3,700,000
3,000,000
620,000
950,000
100,000
-
35,000,000
Page 210
Amount of Climate Change
Amount
Expenditure
2,081,000
1,050,000
850,000
1,760,000
200,000
500,000
200,000
300,000
50,000
50,000
50,000
50,000
50,000
50,000
Page 211
Amount of Climate Change
Amount
Expenditure
95,000
60,000
150,000
- - -
32,000,000 58,000,000 58,000,000 58,000,000
1,000,000 - -
3,522,914
300,000 - 300,000 -
300,000
500,000 - -
1,000,000
716,000
Page 212
Amount of Climate Change
Amount
Expenditure
985,000
- - -
300,000 - - -
1,000,000 1,000,000 - - - -
3,000,000 3,000,000 - - - -
2,000,000 1,800,000 - - - -
2,500,000 1,700,000 - - - -
8,500,000 7,500,000 9,200,000 10,120,000 11,132,000 12,245,200
Page 213
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
22,000,000
100,000
100,000 1,000,000
100,000 1,000,000
Page 214
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
- - -
- - -
200,000 200,000 200,000
400,000 400,000 400,000
Page 215
Amount of Climate Change
Amount
Expenditure
- - -
- - -
Page 216
Amount of Climate Change
Amount
Expenditure
Page 217
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
Page 218
Amount of Climate Change
Amount
Expenditure
- - -
- - -
1,350,000
Page 219
Amount of Climate Change
Amount
Expenditure
- - -
500,000 500,000 - - -
100,000
50,000
1,000,000
Page 220
Amount of Climate Change
Amount
Expenditure
600,000
1,000,000 1,000,000 - - -
100,420
- - -
- - -
- - -
- - -
- - -
321,700
300,000 500,000 200,000 200,000
365,000
50,000
86,400 86,400 86,400
85,050 85,050 85,050
Page 221
Amount of Climate Change
Amount
Expenditure
500,000
500,000
10,000,000
1,500,000
2,000,000
300,000 500,000
1,500,000
1,000,000
36,631,968 38,497,580 70,934,693 60,082,090 64,170,299 70,237,329
-
Page 222
Amount of Climate Change
Amount
Expenditure
640,000 - - -
200,000 - - -
- - -
- - -
- - -
- - -
- - -
600,000
Page 223
Amount of Climate Change
Amount
Expenditure
500,000
500,000
- - -
Page 224
Amount of Climate Change
Amount
Expenditure
2,373,600 - - -
- - -
Page 225
Amount of Climate Change
Amount
Expenditure
- - -
20,000,000
1,200,000
Page 226
Amount of Climate Change
Amount
Expenditure
- - -
- - -
Page 227
Amount of Climate Change
Amount
Expenditure
73,950,000
Page 228
Amount of Climate Change
Amount
Expenditure
1,500,000 5,146,700 - -
1,350,000
1,131,379 1,000,000 - -
25,000
160,000 160,000 - -
- - -
Page 229
Amount of Climate Change
Amount
Expenditure
- - -
- - - -
Page 230
Amount of Climate Change
Amount
Expenditure
- - -
- - -
15,000,000
500,000 - -
3,000,000
3,000,000
500,000
2,000,000
1,000,000 1,100,000
3,000,000
- - -
23,534,774 30,053,748 59,147,819 33,708,100 35,958,910 39,534,802
269,973,694.32 301,079,942.31 706,542,495.37 1,877,093,832.72 1,765,855,429.40 1,813,159,305.74
Page 231
Amount of Climate Change
Amount
Expenditure
- - - -
- - - -
- - - -
200,000 200,000 - - - -
Page 232
Amount of Climate Change
Amount
Expenditure
200,000 - - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 10,000,000
- 30,000,000
- - -
Page 233
Amount of Climate Change
Amount
Expenditure
- - - -
- - -
Page 234
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
- - -
10,000,000
30,000,000
600,000
2,000,000
5,000,000
35,000
1,000,000
Page 235
Amount of Climate Change
Amount
Expenditure
- - -
- - -
222,200 - - - -
- - - -
- - -
2,800,000
50,000,000
Page 236
Amount of Climate Change
Amount
Expenditure
300,000
200,000
- - - -
Page 237
Amount of Climate Change
Amount
Expenditure
- - - -
- - - -
- - - -
- - - -
- - - -
Page 238
Amount of Climate Change
Amount
Expenditure
1,000,000
500,000
- - -
2,000,000 - -
Page 239
Amount of Climate Change
Amount
Expenditure
500,000 - - -
- - -
Page 240
Amount of Climate Change
Amount
Expenditure
30,000 - -
- - -
500,000 - - -
Page 241
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
- - -
600,000
Page 242
Amount of Climate Change
Amount
Expenditure
250,000
- - -
- - -
40,000 - - - -
Page 243
Amount of Climate Change
Amount
Expenditure
800,000 - - -
- - -
- - -
- - -
350,000 385,000 423,500 465,850
- - -
Page 244
Amount of Climate Change
Amount
Expenditure
- - -
5,000,000 - -
- - -
155,000
38,000
66,680
5,308,800
- - -
Page 245
Amount of Climate Change
Amount
Expenditure
- - - -
- - - -
Page 246
Amount of Climate Change
Amount
Expenditure
500,000 300,000 - - - -
Page 247
Amount of Climate Change
Amount
Expenditure
- - - -
200,000 - - - -
- - -
Page 248
Amount of Climate Change
Amount
Expenditure
50,000
3,000,000
10,000,000 10,000,000
270,000 -
Page 249
Amount of Climate Change
Amount
Expenditure
600,000
240,000
35,000,000 30,000,000
30,000,000 20,000,000
500,000
- 20,000,000 30,000,000
Page 250
Amount of Climate Change
Amount
Expenditure
- - -
480,000 480,000 912,000 957,600 1,005,480 1,055,754
- - -
- - -
Page 251
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
Page 252
Amount of Climate Change
Amount
Expenditure
Page 253
Amount of Climate Change
Amount
Expenditure
Page 254
Amount of Climate Change
Amount
Expenditure
Page 255
Amount of Climate Change
Amount
Expenditure
Page 256
Amount of Climate Change
Amount
Expenditure
Page 257
Amount of Climate Change
Amount
Expenditure
Page 258
Amount of Climate Change
Amount
Expenditure
Page 259
Amount of Climate Change
Amount
Expenditure
Page 260
Amount of Climate Change
Amount
Expenditure
Page 261
Amount of Climate Change
Amount
Expenditure
- - -
40,000,000
Page 262
Amount of Climate Change
Amount
Expenditure
- - -
- - -
Page 263
Amount of Climate Change
Amount
Expenditure
500,000
- - -
Page 264
Amount of Climate Change
Amount
Expenditure
Page 265
Amount of Climate Change
Amount
Expenditure
- - -
- - -
Page 266
Amount of Climate Change
Amount
Expenditure
- - -
- - -
- - -
Page 267
Amount of Climate Change
Amount
Expenditure
Page 268
Amount of Climate Change
Amount
Expenditure
- - -
1,500,000
900,000 - 945,000
235,000 246,750 259,088 272,042
- - -
- - -
- - -
Page 269
Amount of Climate Change
Amount
Expenditure
- - -
350,000
550,000
5,000,000
2,200,000 2,500,000
Page 270
Amount of Climate Change
Amount
Expenditure
1,500,000
12,587,978
10,000,000
1,500,000
Page 271
Amount of Climate Change
Amount
Expenditure
2,500,000
1,500,000
28,200,000
Page 272
Amount of Climate Change
Amount
Expenditure
2,000,000
2,000,000
2,000,000
2,000,000
10,000,000
10,000,000
10,000,000
Page 273
Amount of Climate Change
Amount
Expenditure
10,000,000
10,000,000
1,838,870
1,838,870
9,444,771
5,000,000
10,000,000
17,550,000
9,338,620
Page 274
Amount of Climate Change
Amount
Expenditure
22,000,000
18,000,000
23,661,380
2,368,025
1,346,960
1,781,725
4,594,689
2,000,000
Page 275
Amount of Climate Change
Amount
Expenditure
3,000,000
1,000,000
3,000,000
1,000,000
1,500,000
5,000,000
1,500,000
6,000,000
1,000,000
1,000,000
Page 276
Amount of Climate Change
Amount
Expenditure
2,000,000
1,424,125
1,500,000
2,000,000
2,000,000
4,000,000
1,000,000
Page 277
Amount of Climate Change
Amount
Expenditure
3,000,000
1,500,000
3,000,000
7,500,000
4,038,108
2,698,637
3,960,694
9,176,675
839,139
Page 278
Amount of Climate Change
Amount
Expenditure
6,200,000
1,000,000
1,500,000
1,200,000
1,215,000
500,000
1,500,000
1,424,125
Page 279
Amount of Climate Change
Amount
Expenditure
450,000
1,500,000
1,600,000
1,500,000
10,000,000 - - -
Page 280
Amount of Climate Change
Amount
Expenditure
15,000,000
6,000,000
Page 281
Amount of Climate Change
Amount
Expenditure
6,000,000
6,000,000
6,000,000
6,000,000
6,000,000
6,000,000
6,000,000
Page 282
Amount of Climate Change
Amount
Expenditure
2,206,652
1,198,446
13,650,000
Attested by:
Page 284
CC
Typology
Code
Page 285
CC
Typology
Code
Page 286
CC
Typology
Code
Page 287
CC
Typology
Code
Page 288
CC
Typology
Code
Page 289
CC
Typology
Code
Page 290
CC
Typology
Code
Page 291
CC
Typology
Code
Page 292
CC
Typology
Code
Page 293
CC
Typology
Code
Page 294
CC
Typology
Code
Page 295
CC
Typology
Code
Page 296
CC
Typology
Code
Page 297
CC
Typology
Code
Page 298
CC
Typology
Code
Page 299
CC
Typology
Code
Page 300
CC
Typology
Code
Page 301
CC
Typology
Code
Page 302
CC
Typology
Code
Page 303
CC
Typology
Code
Page 304
CC
Typology
Code
Page 305
CC
Typology
Code
Page 306
CC
Typology
Code
Page 307
CC
Typology
Code
Page 308
CC
Typology
Code
Page 309
CC
Typology
Code
Page 310
CC
Typology
Code
Page 311
CC
Typology
Code
Page 312
CC
Typology
Code
Page 313
CC
Typology
Code
Page 314
CC
Typology
Code
Page 315
CC
Typology
Code
Page 316
CC
Typology
Code
Page 317
CC
Typology
Code
Page 318
CC
Typology
Code
Page 319
CC
Typology
Code
Page 320
CC
Typology
Code
Page 321
CC
Typology
Code
Page 322
CC
Typology
Code
Page 323
CC
Typology
Code
Page 324
CC
Typology
Code
Page 325
CC
Typology
Code
Page 326
CC
Typology
Code
Page 327
CC
Typology
Code
Page 328
CC
Typology
Code
Page 329
CC
Typology
Code
Page 330
CC
Typology
Code
Page 331
CC
Typology
Code
Page 332
CC
Typology
Code
Page 333
CC
Typology
Code
Page 334
CC
Typology
Code
Page 335
CC
Typology
Code
Page 336
CC
Typology
Code
Page 337
CC
Typology
Code
Page 338
CC
Typology
Code
Page 339
CC
Typology
Code
Page 340
CC
Typology
Code
A424-13
Page 341
CC
Typology
Code
Page 342
CC
Typology
Code
Page 343
CC
Typology
Code
Page 344
CC
Typology
Code
Page 345
CC
Typology
Code
Page 346
CC
Typology
Code
Page 347
CC
Typology
Code
Page 348
CC
Typology
Code
Page 349
CC
Typology
Code
Page 350
CC
Typology
Code
Page 351
CC
Typology
Code
Page 352
CC
Typology
Code
Page 353
CC
Typology
Code
Page 354
CC
Typology
Code
Page 355
CC
Typology
Code
Page 356
CC
Typology
Code
Page 357
CC
Typology
Code
Page 358
CC
Typology
Code
Page 359
CC
Typology
Code
Page 360
CC
Typology
Code
Page 361
CC
Typology
Code
Page 362
CC
Typology
Code
Page 363
CC
Typology
Code
Page 364
CC
Typology
Code
Page 365
CC
Typology
Code
Page 366
CC
Typology
Code
Page 367
CC
Typology
Code
Page 368
CC
Typology
Code
Page 369
CC
Typology
Code
Page 370
CC
Typology
Code
Page 371
CC
Typology
Code
Page 372
CC
Typology
Code
A114-12
M114-10
M114-09
Page 373
CC
Typology
Code
Page 374
CC
Typology
Code
Page 375
CC
Typology
Code
A414-02
A413-01
A414-03
Page 376
CC
Typology
Code
Page 377
CC
Typology
Code
Page 378
CC
Typology
Code
Page 379
CC
Typology
Code
Page 380
CC
Typology
Code
Page 381
CC
Typology
Code
Page 382
CC
Typology
Code
Page 383
CC
Typology
Code
Page 384
CC
Typology
Code
Page 385
CC
Typology
Code
Page 386
CC
Typology
Code
A314-01
M323-01
M324-02
M324-01
A224-03
Page 387
CC
Typology
Code
A713-06
M312-01
M314-05
A314-06
A314-06
A314-09
Page 388
CC
Typology
Code
M214-05
Page 389
CC
Typology
Code
M314-08
Page 390
CC
Typology
Code
M314-04
Page 391
CC
Typology
Code
A713-01
Page 392
CC
Typology
Code
A113-01
A713-01
Page 393
CC
Typology
Code
Page 394
CC
Typology
Code
Page 395
CC
Typology
Code
Page 396
CC
Typology
Code
Page 397
CC
Typology
Code
Page 398
CC
Typology
Code
A222-03
Page 399
CC
Typology
Code
Page 400
CC
Typology
Code
Page 401
CC
Typology
Code
Page 402
CC
Typology
Code
A424-06
Page 403
CC
Typology
Code
Page 404
CC
Typology
Code
A113-04
Page 405
CC
Typology
Code
A222-01
Page 406
CC
Typology
Code
Page 407
CC
Typology
Code
Page 408
CC
Typology
Code
Page 409
CC
Typology
Code
Page 410
CC
Typology
Code
Page 411
CC
Typology
Code
Page 412
CC
Typology
Code
M624-06
m611-03
A224-01
Page 413
CC
Typology
Code
A224-01
A224-01
A224-01
A224-01
A224-01
A224-01
A224-01
Page 414
CC
Typology
Code
A224-01
A634-06
A634-06
A224-01
A634-06
A634-06
A634-06
Page 415
CC
Typology
Code
A634-06
Page 416
CC
Typology
Code
A224-01
A224-01
M324-02
Page 417
CC
Typology
Code
A624-03
Page 418
CC
Typology
Code
A224-01
A224-01
A224-01
A224-01
Page 419
CC
Typology
Code
A224-01
Page 420
CC
Typology
Code
A224-01
Page 421
CC
Typology
Code
Page 422
CC
Typology
Code
Page 423
CC
Typology
Code
Page 424
CC
Typology
Code
Page 425
Schedule of Implementation
Implementing
Project Program/ Project Activity Description Expected Outputs
Office/ Agency Start Date
Number
Completion
Date
SOCIAL SECTOR
Labor Education for Graduating Students PESO 2017 2022 No. of sessions conducted per year
Career Coaching for 3rd and 4th year students PESO 2017 2022 Coaching to 2000 students conducted
Special Program for the Employment of Students
PESO 2017 2022
Candidates for SPES deployed
Subsidy (SPES Counterpart-salary)
Government Internship Program (GIP)
PESO 2019 2022 No. of fresh Graduates employed
Tulong Panghanapbuhay sa Ating Disadvantaged/ No. of displaced Workers
PESO 2019 2022
Displaced Workers (TUPAD) Program employed/Livelihood subsidy
Search for Outstanding Employer/Employee of No. of recognition/awarding
PESO 2017 2022
the year ceremony conducted
Human Resource Managers' Meeting PESO 2017 2022 HR Managers' meeting conducted
Pre-Employment Orientation Seminar PESO 2017 2022 No. of seminars conducted
Work Orientation Program (WOP) Seminar PESO 2017 2022 No. of monthly seminars conducted
OFW Help Desk Seminar PESO 2017 2022 OFW Help Desk established
GAD Programs/Projects/Activities
Psycho-social Programs for men, women and Seminars and activities to persons in
CSWDO/CHO 2017 2022
children difficult circumstances conducted
SAGIP Kalinga for Street Children/Sagip Neneng sa Rescue operation to street children
CSWD/POSO/PNP 2017 2022
Lansangan conducted
Forums and seminars for the
Solo Parent Program CSWDO 2017 2022 empowerment of Solo Parents
conducted
Sustainable Livelihood Program Provincial Meeting CSWDO 2019 2022 SLP Provincial Meeting participated
Skills training graduation of
Skills training Graduation of Participants CSWDO 2019 2022
participants conducted
Capital Outlay
Rehabilitation Center to cater to drug
Construction of Rehabilitation Center CSWDO/ENG'G 2019 2022 dependents from the locality
established
Establishment of the Shelter for CICL CSWDO/DYSD/ENG'G 2019 2022 Provided shelter for CICL
Establishment of Center for the Abandoned and Center for abandoned elderly and
CSWDO/OM/ENG'G 2020 2022
Neglected Elderly/Children neglected children constructed
Office Equipment (TV), Portable
Office and Communication Equipment CSWDO 2018 2022 Speaker w/ lapel, 2-way radio
procured
Computerization of FA, Medical,
Computerization of CSWD Records (Software) CSWDO 2017 2022 Burial, Balik Probinsya extended to
constituents
Day Care Center rehabilitated and
Construction of Day Care Buildings CSWDO/ENG'G 2017 2022
maintained
Daycare School Equipment CSWDO 2018 2022 Daycare school equipment procured
Sub-total
SOCIALIZATION OF SENIOR CITIZENS
Maintenance and Other Operating Expenses
Telephone Expenses, Repair &
MOOE CSWDO/SC 2017 2022 Maintenance of Motor Vehicle,
Gasoline & Oil
Procurement of Supplies and Materials CSWDO/SC 2019 2022 Supplies and materials purchased
Seminars, trainings and meetings
Seminars, Trainings and Meetings CSWDO/SC 2017 2022
participated
Procurement of Printed Forms CSWDO/SC 2017 2022 Printed forms procured
Medical Assistance CSWDO/SC 2017 2022 Medicines provided
Representation Expenses CSWDO/SC 2017 2022 Representation expenses
Donations CSWDO/SC 2017 2022 Donations given
Financial and burial assistance
Financial & Burial Assistance CSWDO/SC 2017 2022
provided
Senior Citizens vaccinated with Anti-
Free Anti-Pneumonia Vaccine CSWDO/SC 2017 2022
Pneumonia vaccine
Distributed medicines and
Distribution of Free Geriatric Medicines and other
CSWDO/SC 2017 2022 supplementary vitamins according to
Supplemental Vitamins
the senior citizen's needs
Elected Elderly assumes position for a
Elderly Filipino Week celebration and awarding of
CSWDO/SC 2017 2022 week: Centenarians recognized and
Centenarians
awarded with cash
Annual Senior Citizens Convention and Election of Senior Citizens Convention conducted
CSWDO/SC 2017 2022
Senior City Officials yearly
Showcased different Senior Citizen
Annual Senior Cultural Night/Socialization of SC CSWDO/SC 2017 2022 talents; Socialization & Christmas gift
giving program
Promoted camaraderie among 63
Teambuilding of Senior Citizens CSWDO/SC 2017 2022
Chapter organizations
Capital Outlay
Office Equipment CSWDO/SC 2019 2022 Office equipment acquired
Legal Clinic for PWDs (RA 7277) CSWDO/PWD 2017 2022 Free Legal assistance provided
Medical/financial assistance to
Financial Assistance CSWDO/PWD 2017 2022
indigent PWD conducted
Smart Parenting- PWD Health Care and Seminars and trainings in taking care
CSWDO/PWD 2019 2022
Wellness Program of special children conducted
Legal Programs for PWD CSWDO/PWD 2019 2022 Legal Programs for PWD provided
Symposium on the Rights of PWD CSWDO/PWD 2019 2022 Symposium for PWDs conducted
Capital Outlay
Machinery and Equipment CSWDO/PWD 2019 2022 Machinery & equipment acquired
Community Mortgage Program and Mobilization CUDHO/ OM/SHFC 2019 2022 CMP projects handled
Community association
Organizing community associations CUDHO 2019 2022
organized
Homeowners' livelihood/
Conduct of Livelihood Trainings and Seminars CUDHO/SPLOTC 2019 2022 additional income for the family
provided
Effective and well-trained
Special Leadership Training for CAs & Barangays CUDHO 2019 2022
CAs and Barangays officials
Database update on the list of IFS CUDHO/CASTF 2017 2022 Updated database
CUDHO/CASTF/
Conduct assembly/ meetings 2019 2022 Well informed illegal settlers
CSWDO/Legal
CUDHO/CASTF/
Clearing Operations 2019 2022 Area cleared
CSWDO/ENG'G
Information Campaign CUDHO/CASTF 2017 2022 Informal settlers informed
Installation of tarpaulin signages CUDHO/CASTF 2017 2022 Secured government spaces
CUDHO/CASTF/
Conduct HUDCC seminars regarding
2019 2022 Schedule of seminar
professional squatters and squatting syndicates
HUDCC
Financial or material assistance to ISF to be
CUDHO/CSWDO 2019 2022 Informal settler families assisted
demolished
CUDHO/CASTF/
Demolition of Illegal Informal Settlers 2019 2022 Illegal settlers demolished
CSWD/ENG'G
Demolition of Informal Settlers structures
CUDHO/ENG'G ISF structures demolished
2019 2022
vulnerable to disaster
Demolition, desilting & dredging
Demolition/Relocation & Desilting/Dredging CUDHO/CASTF/ENG'G
2018 2022 implemented
Concepts, guidelines and
Coordination with National Agencies/Social
CUDHO/OM 2019 2022 procedures regarding Medium-rise
Housing Finance Corp.
housing
Financial management training for
Financial Management Training for Women CUDHO
2019 2022 women conducted
GAD planning and budgeting
GAD Planning and Budgeting Training CUDHO
2019 2022 training participated
Capital Outlay
Lot acquisition for the relocation of Informal Relocation site for IFS from
CUDHO/OM 2019 2019
Settler Families (Brgy. Bagong Silang=1.6 Ha.) danger areas
CUDHO/OM
Site Development/Building construction 2019 2022 Site development (fencing, road);
ARCHT/ENG'G
located in Brgy. Bagong Silang Resettlement housing constructed
Site Development Project/Building Construction CUDHO/OM Relocation site for IFS from
2022 2022
located in Bayan-Bayanan ARCHT/ENG'G danger areas
Site Development Project/Building Construction CUDHO/ Relocation site for IFS from
2022 2022
located in Landayan ARCHT/ENG'G danger areas
Lot acquisition for the relocation of Informal Relocation site for IFS from
CUDHO/OM 2020 2020
Settler Families (Langgam Prado) danger areas
Site Development Project/Building Construction CUDHO/OM Relocation site for IFS from
2020 2022
located in Langgam Prado ARCHT/ENG'G danger areas
Lot acquisition for the relocation of Informal Relocation site for IFS from
CUDHO/OM 2021 2021
Settler Families (Langgam Almariega) danger areas
Site Development Project/Building Construction CUDHO/OM Relocation site for IFS from
2021 2022
located in Langgam Almariega ARCHT/ENG'G danger areas
Permits and Licenses CUDHO/OM 2019 2019 Permits & Licenses secured
Office Equipment CUDHO/CASTF 2019 2022 Office Equipment procured
Equipment and service vehicle
Procurement of Service Vehicle CUDHO 2019 2022
purchased
Sub-total
Sub-total
CIVIL REGISTRATION SERVICES
Other Operational Services SPTI 2019 2022 Other operational services paid
Repair and Maintenance of School Building SPTI/ENG'G 2018 2022 Safe environment provided
Construction of new SPTI building SPTI 2019 2019 New SPTI building constructed
Subsidy to PNP and NUP Personnel PNP/OM/SP 2017 2022 Assistance to PNP provided
Special Weapons And Tactics (SWAT) Team Training PNP/OM/SP 2018 2022 SWAT organized and trained
Provision of Motor Vehicles (Patrol Cars and 2 Patrol Cars and 5 Motorcycles
PNP/OM/SP 2018 2019
Motorcycles) provided
Communication equipment
Communication Equipment PNP/OM/SP 2019 2019
provided
Furnitures and Fixtures PNP/OM/SP 2019 2019 Furnitures & fixtures procured
Police Equipment (long firearms) PNP 2020 2022 Long firearms procured
Repair and Maintenance of Building Facility BJMP/OM 2019 2022 BJMP Bldg., repaired/maintained
Greyhound Operation (Oplan Linis) BJMP/OM 2019 2022 Greyhound Operation conducted
BJMP Extension at Brgy. Poblacion, SPL (proposed) BJMP/OM/ENG'G 2019 2019 BJMP extension constructed
Provision of School and Office Supplies SPPC/OM 2019 2022 School & office supplies provided
Capital Outlay
Purchase of Office Equipment SPPC/OM 2019 2022 Office equipment procured
Visual Inspection Using Acetic Acid (VIA) CHO 2017 2022 Early detection of cancer
Seminar/Training program on
Capability Building/Seminar & Training CHO 2017 2022 Advance Cardiac Life Support &
Basic Life support participated
Nutrition Program CHO/Nutrition 2017 2022 Feeding Program implemented
Repair and Maintenance of Equipment SPJLAEH 2018 2022 Generator, Emmission Testing
Rehabilitation of Ramp/
Construction of Hospital Annex Building & Other
SPJLAEH 2019 2022 Retrofitting of Beams &
Structures
Construction of Annex Bldg.
Magna Carta provided to Health
Magna Carta for Health Workers SPJLAEH 2019 2022
Workers
Medical Equipment:
CT Scan = Php42 Million
Digital Mammogram = Php20 million
Breast Ultrasound = Php6 million
Emergency Unit = Php1 million
ECG Unit = Php70 thousand
Laboratory Unit = Php2 million SPJLAEH 2019 2019 Medical equipment purchased
Operating Unit/OR Surgical
Instruments= Php1 million
Acu Wellness = Php750 thousand
Physical Rehab = Php100 thousand
Central Supply/ER Room = Php1 million
Isolation Room = Php30 thousand
Medical/Laboratory Equipment:
Hematology Analyzer Nutrition & Dietetics, Isolation
Sterilizer/Steroid Room, Dialysis Unit, ACU Wellness,
Phaco Machine SPJLAEH 2018 2022 PRU, Specialty Clinics- Heart,
Nupon Air Cleaner with Filter Ophtha, OR, Laboratory, Central
Bedside Tables and Furniture & Fixtures Supply
2D Echo, Treadmill Stress Test
Office Equipment:
Central Supply Room
CSR, Pharmacy, ECG Unit, Heart
Pharmacy Unit
SPJLAEH 2019 2019 Station, Specialty Clinic- Supplies
ECG Unit
and Equipment procured
Heart Station
Specialty Clinic
Chemical & Filtering Supplies GALIC 2017 2022 Oxygen refill provided
Capability Building for GALIC personnel GALIC 2019 2022 Trainings & Serminars participated
Capital Outlay
Furnitures & fixtures and office
Furnitures & Fixtures GALIC 2018 2022
equipment procured
Hospital Equipment, X-ray
Medical Equipment GALIC 2017 2022
Equipment, Oxygen Tank
Lot acquired for LED and X-ray
Construction of GALIC Building GALIC 2019 Continuing
Room
Hospital Laboratory and X-Ray
Establishment of GALIC Laboratory and X-Ray GALIC 2019 2022
established
Renovation of 3rd Flr., GALIC Hospital Bldg., with
GALIC 2019 2019 GALIC facility renovated
Electricals
Diesel Generator for GALIC GALIC/ENG'G 2019 2019 Diesel generator provided
Upgrade Electrical System of GALIC GALIC/ENG'G 2019 2019 Electrical System upgraded
-
Gen Fund 1,446,207 1,561,030 1,717,132 1,888,846 2,077,730 2,285,503
- - -
Gen Fund - - -
Gen Fund - - - -
Gen Fund - - -
120,000
- - -
Gen. Fund 500,000 988,000 1,760,000 1,936,000 2,129,600 2,342,560
GF/LCPC - - - -
NGA - - - -
GAD 250,000 250,000 260,000 286,000 314,600 346,060
GAD - - - -
GF/GAD - - - -
- - -
GF/POPS 5,000,000
- - -
Gen Fund - - -
SC Fund 350,000 - -
PWD Fund - - -
PWD Fund - - -
PWD Fund - - -
PWD Fund - - -
PWD Fund 200,000 220,000 242,000 266,200
PWD Fund - - -
PWD Fund - - -
PWD Fund - - -
PWD Fund - - -
PWD Fund - - -
- - -
- - -
Gen. Fund - - -
Gen. Fund - - -
Gen Fund - - -
Gen. Fund - - -
Gen Fund - - -
Gen Fund - - -
Gen. Fund/HOA - - -
Gen. Fund - - -
Gen Fund - - -
Gen Fund - - -
Gen. Fund - - -
Gen. Fund - - -
Gen. Fund - - -
Gen. Fund - - -
Gen. Fund - - -
Gen. Fund - - -
Gen. Fund - - -
Gen Fund - - -
Gen Fund - - -
Gen. Fund - - -
GF/GAD - - -
GF/GAD - - -
- - -
- - -
- - -
Gen. Fund - - -
Gen Fund - - -
Gen. Fund - - -
- - -
Gen Fund
Gen Fund - - -
Gen Fund - - -
Gen Fund - - -
Gen Fund - - -
- - -
Gen Fund - - -
GF/POPS 1,000,000 - - -
- - -
- - -
- - -
- - -
- - -
Gen Fund -
Gen Fund - - -
- - -
Gen Fund - - -
GAD - - -
- - -
Gen Fund
Gen Fund
Gen Fund
Gen Fund
Gen Fund
Gen Fund - - -
Gen Fund - - -
Gen Fund - - -
- - -
- - -
GF/GAD - - -
GF/GAD 300,000 330,000 363,000 399,300
GF/GAD - - -
GF/GAD - - -
GF/GAD - - -
GF/GAD - - -
GF/GAD - - -
GF/POPS 100,000
GAD - - -
Gen Fund - - -
Gen Fund - - -
Gen Fund - - -
- - -
Gen Fund 321,700
Gen Fund 300,000 500,000 200,000 200,000
Gen Fund 365,000
Gen Fund 50,000
Gen Fund 86,400 86,400 86,400
Gen Fund 85,050 85,050 85,050
Gen Fund
Gen Fund
Gen Fund
Gen Fund - - -
Gen Fund - - -
Gen Fund - - -
Gen Fund - - -
- - -
- - -
- - -
Gen Fund - - -
Gen Fund - - -
Gen Fund 73,950,000
Gen Fund - - -
- - -
Gen Fund - - - -
Gen Fund - - -
- - -
GF/Continuing 15,000,000
Climate CC
Change Typology
Mitigatio Code
n
- A424-13
Local Development Investment Progr
By Program/Project/Activity by S
2017 - 2022
City of San Pedro
Province of Laguna
Project Program/ Project Activity Description Implementing Office/ Schedule of Expected Outputs
Number Agency Implementation
Start Date
Completion
Date
ECONOMIC SECTOR
AGRICULTURAL SERVICES
Plantilla personnel
Personal Services Agriculture 2017 2022
compensated
Maintenance and Other Operating Expenses
Travelling expenses,
Seminars, Trainings and
MOOE Agriculture 2017 2022
Meetings participated; Other
MOOE
Demonstration area on edible
langscaping, containerized
Urban Farming Demonstration Area Project Agriculture 2019 2022 gardening and mushroom
production technology
created
Seedlings of forest and fruit
bearing trees in the nursery
produced and propagated
Preparation/Production of forest and fruit
Agriculture 2019 2022 thru purchase of bags, pots,
bearing trees in Demo Farm/Nursery
garden soil, carbonized rice
hull, organic fertilizer, nets and
bamboo poles
Agricultural supplies
Agricultural Supplies Agriculture 2017 2022
purchased
Hydroponics in demo
SNAP Hydroponics in Demo Farm Agriculture 2017 2022
farm/nursery implemented
10 trainings on organic
Farmers training on organic farming (BAFC & BNS) Agriculture 2018 2022
farming attended every year
Female pigs dispersed to
Pig Dispersal Program Agriculture 2018 2022
backyard animal growers
Female goats dispersed to
Goat Dispersal Program Agriculture 2018 2022
backyard animal growers
Fish cage project in coastal
Fish Cage project for 3 coastal barangays Agriculture 2019 2022
barangays established
Fisherfolks registration to
BoatR registration in 3 coastal barangays Agriculture 2019 2022
BoatR conducted
Capital Outlay
Land Acquisition for the establishment of the CSP Urban Farming Technology
Agriculture 2019 2019
Urban Farming Training Center Center established
Sub-total
VETERINARY SERVICES
Salaries & Wages and other
Personnel Benefits
Personal Services Veterinary 2018 2022
compensated for the Plantilla
personnel
Maintenance and Other Operating Expenses
Seminars/trainings, Annual
Convention of
PCMVLP( Provincial,City &
Capability Building on Animal Health Muncipal Veterinary League of
Vetinerary 2018 2022
Management the Philippines) and PVMA
(Philippine Veterinary
Medicine Association of the
Philippines attended
Other Professional Services OM/Veterinary 2019 2022 Media Relation expenses paid
Other Equipment - Autoclave Portable Sterilizer Vetinerary 2019 2022 Other equipment procured
Regular monitoring of
Acquisition of Service Vehicle (L-300) Veterinary 2019 2019 livestock even in remote areas
with unpleasant condition
Sub-total
ECONOMIC ENTERPRISE & MANAGEMENT SERVICES
Trainings/Seminars
Capacity Development SPTC 2018 2022
participated
Capital Outlay
Infrastructure development of
Renovation of San Pedro Town Center (Ground
SPTC/OM 2019 2019 SPTC with site improvement
floor and Second floor)
and parking garage
Toilet/lavatory provided to
Construction of new toilets/lavatory near the
SPTC/OM 2019 2019 tricycle/jeepney drivers and
terminal area
customers of SPTC
Capital Outlay
Procurement of Office Equipment OM/TCA 2019 2019 Office equipment purchased
Cultural Projects:
1) Purchase of land for Sampaguita Plantation
Different Cultural Projects
2) Lease, purchase of Heritage house to serve TCA 2019 2019
conducted
as Restaurant and Museum
3) Sampaguita products/promotional efforts
Sub-total
CULTURAL PROJECTS
Maintenance and Other Operating Expenses
Other cultural events fund
Other MOOE OM/TCA 2017 2022
provided
Sub-total
PERMITS & LICENSE OFFICE
Plantilla Personnel
Personal Services BPLO 2019 2019
compensated
Maintenance and Other Operating Expenses
Travel expenses, Fuel, Oil and
Lubricants, Repair and paid for
MOOE BPLO 2017 2022
the maintenance of motor
vehicles
Project Business One Stop Shop (BOSS)- Fast, easy and convenient
a) Giveaway for early Tax Payers processing of Mayor's permit
b) T-shirts for BOSS Employees BPLO 2019 2022 granted;
c) Snacks (coffee & biscuits for Taxpayers) Supplies/materials, Business
d) Overtime Pay plates/Printed forms provided
Business establishments'
Permits and Licenses
Tax Campaign through massive inspection drive of inspected and validated.
BPLO 2019 2019
all Business establishments - Hiring of Tax Mappers Issues, concerns and problems
of Business owners identified
and addressed
Forum in 27 Barangays
Barangay Business Forum BPLO 2019 2019
conucted
Maintenance of new BPLS Software BPLO 2019 2019 BPLS Software well maintained
Senior Citizens, Pregnant Women and Persons with Convenience to SC, Pregnant
BPLO 2019 2022
Disability (PWD) waiting area women and PWDs provided
Capital Outlay
Plantilla personnel
Personal Services CCLO 2017 2022
Compensated
Successful Beneficiaries
Quarterly Beneficiaries' General Assembly CCLO 2019 2022
recognized every quarter
BUB Livelihood Enhancement CCLO 2019 2019 BUB Livelihood enhanced
Technical Review Board
Technical Review Committee/Board CCLO 2019 2019
established
Sustainable livelihood to
Sustainable Livelihood Projects for the
CCLO 2017 2022 marginalized group and drug
Marginalized group and Drug surrenderees
surrenderers granted
Capital Outlay
Mobile Service Van for Community-based Training CCLO 2019 2022 Mobile service van provided
Amount
Climate
Change
2017 2018 2021
2020 2022 Adaptation
2019
- -
Gen Fund - - - -
Gen. Fund - - - -
Gen Fund - - - -
- - - -
Gen. Fund - - - -
Gen. Fund - - - -
Gen Fund - - - -
- - - -
Gen Fund - 10,000,000
- - -
Gen. Fund - - - -
Gen. Fund - - -
Gen Fund
Gen. Fund - - -
Gen. Fund - - -
Gen. Fund - - -
- - -
DBM/NMIS 30,000,000
- - -
- - -
GAD - - - -
- - -
- - -
Gen Fund 500,000 500,000 1,080,832 1,188,915 1,307,807 1,438,588
Gen Fund -
Gen Fund - - - -
Gen Fund - - - -
Gen Fund - - - -
Gen Fund - - - -
Gen Fund - - - -
Gen Fund - - - -
- -
Gen Fund 70,000
Gen Fund - - -
- - -
Gen. Fund - - -
Gen Fund
Gen Fund
GAD 30,000 - -
Gen Fund
Gen Fund
Gen. Fund - - -
Gen Fund - - -
Gen Fund - - -
- - -
GAD 250,000
Gen Fund - - -
3,930,000 2,943,100 33,176,818 12,437,376 13,556,114 14,841,725
- - -
Gen Fund -
GAD - - -
GF/GAD - - -
- - -
Gen Fund - - -
Gen Fund - - -
GAD 5,000,000 - -
Climate CC
Change Typology
Mitigation Code
A114-12
M114-10
M114-09
A414-02
A413-01
A414-03
Local Development Investment Program
By Program/Project/Activity by Sec
2017 - 2022
City of San Pedro
Province of Laguna
Schedule of Implementation
Implementing
Project Program/ Project Activity Description Office/ Expected Outputs
Start Date
Number Agency
Completion
Date
CENRO
Plantilla personel and RC
Personal Services CENRO 2017 2022
employees Compensated
Maintenance and other Operating Expenses
Travelling expenses,
Maintenance of vehicle,
MOOE CENRO 2017 2022
Gasoline & oil, Annual fees
and Office supplies
Environment-Friendly Day
Environment Friendly Day/Earth Hour Program CENRO 2018 2022
activities/IEC conducted
CENRO,Brgys, NGOs
City flood management
De-clogging of drainage, rivers and creeks and other Civic 2019 2022
improved/maintained
Organizations
CENRO,Brgys, NGOs
Dredging and desilting of rivers/creeks and City flood management
and other Civic 2019 2022
waterways improved/maintained
Organizations
Regular Synchronized
CENRO, All Brgys.,
Barangay Clean-up
Synchronized Barangay Clean-up NGO's, Civic Org. and 2019 2022
Conducted every 1st Saturday
Schools
of the month
Natural Resources
Conservation of Natural Resources CENRO 2017 2022 conservation-related activities
conducted
Segregated collection of
Full implementation of Segregated Collection CENRO 2019 2022 solid wastes fully
implemented
Capital Outlay
Disaster Response Materials and Equipment:
Mini Dump Truck
Mini Back Hoe
Long Arm Pruner
Portable Manlifter
Car Service Vehicle/Pick-up 4x4
Smoke Belching Level Meter
CENRO 2019 2019 Various equipment procured
Noise Level Meter
Grass Cutter with Blade
Tri-wheel
Biogas Digester
Scafolding/A-Ladder
Welding Machine - Green Urban Center CENRO 2018 2018 Unit purchased
Procurement of Equipment:
a) Long Arm Pruner = P15,000
b) Grass Cutter with blade = P105,000
CENRO 2019 2022 Equipment purchased
c) Biogas digester = P50,000
d) A Ladder = P15,000
e) Scaffolding = 25,000
Transportation equipment
Purchase of Transportation Equipment CENRO 2019 2022
procured
Establishment of City Waste to Energy Plant CENRO/ENG'G 2019 2022 City Waste to Energy
established
City Sewage Treatment Plant
CENRO/ENG'G 2019 2022
Establishment of City Wastewater Treatment Plant established
Established City Waste
CENRO/ENG'G 2019 2020
Establishment of City Waste Museum Museum established
Walkway/Sampaguita Lane
CENRO/ENG'G 2020 2022
San Isidro River Walkway/Sampaguita Lane constructed
Sub-Total
GARBAGE COLLECTION - 6522
Sub-Total
ILLUMINATION/STREETLIGHTING - 6531
Electricity Expenses OM 2017 2022 Electric consumption paid
Sub-Total
OTHER SERVICES
DISASTER RISK REDUCTION AND MANAGEMENT SERVICES
Salaries & wages and other
personnel benefits for the
Personal Services CDRRMO 2017 2022
plantilla personnel
compensated
Maintenance and other Operating Expenses
MOOE CDRRMO 2017 2022 Gasoline & Oil expenses
DISASTER RISK REDUCTION AND MANAGEMENT FUND (5% OF ESTIMATED INCOME)
CDRRMC/O, BDRRMC/Os,
CSOs, NGOs and other
Capacity Building through trainings, meetings
CDRRMO 2017 2022 volunteer organizations
and seminars, exercises and drills
strengthened with 100%
efficiency
DRRM on Climate Change Adaptation - Climate change-resilient
CDRRMO/ENG'G 2017 2022
Prevention and Mitigation Projects: community enhanced
a) Conduct Climate Change Study Tours
Lesser risk and impact when
& CDRRMO/ENG'G 2017 2022
disaster strikes ensured
Researches and Seminar
b) Cleaning & Dredging of rivers; De-
silting
of rivers and waterways; Cleaning & De-
Alternative means of
CDRRMO 2017 2022 transportation for the relief
clogging of canals and waterways:
and rescue teams provided
1) Man-made Canals
2) San Isidro River
3) San Pedro Tunasan
Alternative means of
c) Riprap of Rivers & Slopes/Slope
CDRRMO/ENG'G 2017 2022 transportation for the relief
Protection
and rescue teams provided
Recovery:
a) Housing
b) Materials Effective and fast
c) Seeds and other Farm Inputs CDRRMO 2017 2022 rehabilitation and recovery to
d) Monitoring and Evaluation any damages
e) Repair and Construction
f) Other Works and Services for recovery
Capital Outlay
Pruning equipment
Purchase of Pruning Equipment CDRRMO/CENRO 2019 2019
purchased
Database consisting of
Deploy Enumerators to collect and update information on the profile
CDRRMO 2019 2022
the necessary data for Climate Disaster Risk and distribution of residents
in all hazard zones created
Sub-Total
GENERAL SERVICES OFFICE
Plantilla Personnel
Personal Services GSO 2017 2022
compensated
Maintenance and other Operating Expenses
Travelling, Telephone,
Gasoline & Oil,
MOOE GSO 2018 2022
Transportation, Repair &
Maintenance of Vehicle
Trainings & seminars
Capability Building for GSO personnel GSO 2018 2022
participated
Janitorial Section:
Assignment of specific tasks, duties and
responsibilities of the overseer, which
include
Janitorial services effectively
reporting of any damage:
and efficiently provided;
a) City Hall/Old Municipal Hall GSO/ENG'G 2017 2022
No. of janitors per shift
b) JLAEH/GALIC
assigned
c) SPTC
d) Bulwagang Magsaysay
e) Evacuation Center
f) Pacita Astrodome
Capital Outlay
Property Management
Landscaping Section:
Software and Archiving
a) Archiving System Software
GSO 2018 2022 System Software using
b) Property Management System
available technology and
applying scientific method
Vehicle for official use
Procurement of Motor Vehicle GSO 2019 2022
purchased
City Architect to include in the Soup Kitchen Storage area for purified
GSO 2018 2022
Design a Storage area for purified water water containers provided
containers
- - -
GAD 155,000
GAD - - -
Gen Fund 1,010,000 250,000 400,000 420,000 441,000 463,050
Gen Fund - - - -
Gen. Fund -
Gen. Fund - - - -
Gen Fund,
200,000 210,000 220,500 231,525
USAID
Gen. Fund - - - -
Gen. Fund 200,000 - - - -
- - -
-
Gen Fund 3,609,474 3,818,869 7,688,458 8,457,304 9,303,035 10,233,338
- - -
Gen Fund 480,000 480,000 912,000 957,600 1,005,480 1,055,754
GF/CDRRMF - - -
GF/CDRRMF - - -
GF/CDRRMF - - -
GF/CDRRMF - - -
GF/CDRRMF - - -
GF/CDRRMF
GF/CDRRMF
GF/CDRRMF - - -
GF/CDRRMF 40,000,000
GF/CDRRMF 5,000,000 15,000,000 25,000,000 20,000,000
GF/CDRRMF - - -
GF/CDRRMF - - -
GF/CDRRMF 500,000
GF/CDRRMF - - -
GF/CDRRMF - - -
GF/CDRRMF - - -
- - -
Gen Fund 288,000 1,137,000 3,513,000 3,688,650 3,873,083 4,066,737
Gen Fund - - -
Gen Fund - - -
Gen Fund - - -
Gen Fund 5,080,000 5,540,000 2,380,000 2,499,000 2,623,950 2,755,148
- - -
Gen Fund - - -
Gen Fund
Gen Fund - - -
Gen Fund - - -
Climate CC
Change Typology
Mitigation Code
A314-01
M323-01
M324-02
M324-01
A224-03
A713-06
M312-01
M314-05
A314-06
A314-06
A314-09
M214-05
M314-08
M314-04
A713-01
A113-01
A713-01
#REF!
A222-03
A424-06
A113-04
A222-01
Local Development Investment Pro
By Program/Project/Activity by
2017 - 2022
City of San Pedro
Province of Laguna
Schedule of
Implementing Implementation
Project Expected Outputs
Program/ Project Activity Description Office/Agency Start Date
Number Completion
Date
INFRASTRUCTURE SECTOR
ARCHITECTURAL AND PUBLIC INFRASTRUCTURE SERVICES
CITY ARCHITECT AND ENGINEERING OFFICE(S)
Plantilla Personnel and RC
Personal Services ARCH. 2017 2022
compensated
Plantilla Personnel and RC
Personal Services ENG'G. 2017 2022
compensated
Maintenance and Other Operating Expenses
Travelling, Gasoline & Oil;
MOOE ARCH. 2017 2022 Repair & Maintenance of
vehicle paid
Participation in Training and Seminar ENG'G. 2019 2022 Training & seminar attended
Other supplies & materials
Procurement of other Supplies and Materials ENG'G. 2019 2022
provided
Other MOOE: Installation of Rocket Pump ENG'G. 2019 2022 Rocket pump installed
Ensured efficient and effective
Procurement of Electrical/Carpentry Supplies ENG'G. 2017 2022
services
Ensured efficient and effective
Maintenance of Roads, Bridges & Buildings ENG'G. 2017 2022
services
Repair and Maintenance of Infrastructure Ensured efficient and effective
ENG'G. 2018 2022
Assets services
Ensured efficient and effective
Repair and Maintenance of Other PPE ENG'G. 2018 2022
services
Sub - Total
Capital Outlay
Other needed equipment
Procurement of other Equipment ENG'G. 2019 2022
procured
Procurement of Service Vehicle ENG'G. 2019 2019 Service vehicle procured
20% Development Projects
Rehabilitation/replacement of concrete pipes in
Provided assistance to develop
Balagtas St., Juan Luna, Amorsolo and Hernandez St., ENG'G. 2019 2019
the barangay project
Barangay Chrysanthemum
Installation of Solar Lighting of the Public cemetery ENG'G 2019 2019 Solar lighting installed
Installation of Diesel Generator at new City Hall ENG'G. 2019 2019 Genset procured
Upgrading of Electrical System at Pacita Astrodome ENG'G. 2019 2019 Electrical System upgraded
Construction of Pantry at Sto. Niño Señor Citizen, Sto. Niño Señor Citizen Pantry
SPJLAEH/ENG'G. 2019 2019
Barangay Pacita 1 in Pacita 1 constructed
Patching and asphalt overlay along Narra and Provided assistance to develop
ENG'G. 2019 2019
Agoho Sts., Barangay Calendola the barangay project
Installation of 50 Sets Solar Lights, Barangay Narra ENG'G. 2019 2019 Solar lighting installed
Construction of Public toilet and office at San Pedro Provided assistance to develop
ENG'G. 2019 2019
Public Cemetery, Barangay San Antonio the barangay project
Construction of Sidewalk with open canal from Blk Sidewalk with open canal
ENG'G Jan. 2019 Dec. 2019
79 & Blk 70 up to the boundary between Barangays constructed
Laram and Langgam
Finishing of existing unfinished HOA office PEA 2A, Provided assistance to develop
ENG'G. 2019 2019
Barangay Langgam the barangay project
Construction of Drainage Canal in Chico St., (Left and Provided assistance to develop
ENG'G 2019 2019
Right), Barangay UBL the barangay project
Renovation and Extension of Day Care Center in Brgy. Rosario Day Care Center
ENG'G 2019 2019
Brgy. Rosario renovated
Other Structures
Established other Infrastructure
Other Infrastructure Assets ENG'G. 2018 2022
Assets
Lighting installed at the
Installation of new Lighting at Gateway Park ENG'G. 2019 2019
Entrance Gateway Park
Installation of Diesel Generator at old City Hall ENG'G. 2019 2019 Genset procured
Installation of Diesel Generator at GALIC ENG'G. 2019 2019 Generator Set installed
Upgrading of Electrical System at old Municipal
ENG'G. 2019 2019 Electrical System upgraded
Hall
Upgrading of Electrical System at GALIC ENG'G. 2019 2019 Electrical System upgraded
Building Construction
Construction of Walkable Pathway Park along San Vicente Road and San
Isidro River, fronting PLDT until SLEX bridge pier ENG'G. 2019 2019 Project implemented
Renovation of the City of San Pedro Plaza OM/ENG'G. 2019 2019 Project implemented
Construction of City Hall Annex Bldg. (Phase 1) OM/ENG'G. 2019 2019 Project implemented
Redevelopment of Benedicto-Austria Gateway Park OM/ENG'G./CPDCO 2019 2019 Project implemented
San Vicente River Walk Development CENRO/ENG'G. 2019 2022 Project implemented
Pedestrian Overpass and Retail Spaces OM/ENG'G. 2019 2020 Project implemented
Commuter Rail in Maligaya, Brgy. San Vicente-NEDA OM/ENG'G. 2020 2022 Project implemented
GRAND TOTAL
Amount of Climate
Amount
Change Expenditure
Source of
Funds Climate
2017 2018 2021 Change
2020 2022 Adaptation
2019
- - -
GAD 1,600,000
GAD 1,500,000
GF/LSB 15,000,000
Attested by:
HON. LOURDES S. CATAQUIZ
City Mayor
nt of Climate
e Expenditure
Climate CC
Change Typology
Mitigation Code
M624-06
m611-03
A224-01
A224-01
A224-01
A224-01
A224-01
A224-01
A224-01
A224-01
A224-01
A634-06
A634-06
A224-01
A634-06
A634-06
A634-06
A634-06
A224-01
A224-01
M324-02
A624-03
A224-01
A224-01
A224-01
A224-01
A224-01
A224-01