This document summarizes the specifications for a vacuum heater with three sections: radiation, convection, and superheater. It outlines the process conditions including fluid types, temperatures, pressures, and flow rates. It also details the mechanical design conditions such as material grades, test pressures, and inspection requirements. The combustion design conditions including excess air, heat release values, and flue gas parameters are provided. Notes indicate the manufacturer shall submit a suitable design for approval.
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
111 views
Heater: Cabine Box 6 Million
This document summarizes the specifications for a vacuum heater with three sections: radiation, convection, and superheater. It outlines the process conditions including fluid types, temperatures, pressures, and flow rates. It also details the mechanical design conditions such as material grades, test pressures, and inspection requirements. The combustion design conditions including excess air, heat release values, and flue gas parameters are provided. Notes indicate the manufacturer shall submit a suitable design for approval.
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2
HEATER
Service: VACUUM Heater Item N°: F0
01 1 Type Cabine Box Number Required Operating 1 Manufactured by 1) 2 Total Heat Duty 6 million Normal Design MM kcal/hr 3 PROCESS CONDITIONS 4 Heater section RADIATION CONVECTION SUPERHEATER 5 Design Case crude oil 1) 1) 6 Heat Absorption MM kcal/hr 37.529 0.436 7 Fluid RECIDUE crude oil Steam 1)2) 1) 8 Flow Rate kg/hr 20000 5 900 9 Pressure Drop (allowable) kg/cm2 12 0.5 10 Pressure Drop (calculated) kg/cm2 11 Average Flux Density (allowable) kcal/hr.m2 12 Average Flux Density (calculated) kcal/hr.m2 o 13 Max. Allowable Inside Film Temperature C 2 14 Fouling Factor hr.m C/kcal 15 Corrosive and Erosive Characteristic 16 Velocity Limitation m/s 4) 17 Inlet Conditions o 18 Temperature C 220 200 19 Pressure kg/cm2 g ≈3 ≈ 3.5 20 Liquid Flow Rate kg/hr 384 261 21 Vapor Flow Rate kg/hr 8 819 5 900 22 Liquid Density at O.T. kg/m3 658 23 Vapor Molecular Weight kg/kmol 73.4 18 24 Liquid Viscosity at O.T. cP 0.27 4) 25 Outlet Conditions o 26 Temperature C 360 3 360 27 Pressure kg/cm2 g ≈ 2.2 3 ≈3 28 Liquid Flow Rate kg/hr 177 325 3 29 Vapor Flow Rate kg/hr 215 755 3 5 900 30 Liquid Density at O.T. kg/m3 686 3 31 Vapor Molecular Weight kg/kmol 136 3 18 32 Liquid Viscosity at O.T. cP 0.30 3 33 FUEL CHARACTERISTIC 34 Type of Fuel Fuel Gas/N. Gas Type of Fuel Fuel Oil 35 Heating Value (LHV) kcal/kg Heating Value (LHV) kcal/kg 36 Fuel Molecular Weight Fuel Molecular Weight 37 Density kg/Nm3 Density kg/Nm3 o 38 Temperature at Burner oC Temperature at Burner C 95-105 39 Fuel Pres. (avail. at burners) kg/cm2 g 1 Fuel Pres.(avail. at burners) 2 kg/cm g 6 3) 40 Fuel Composition % mol. Fuel Specification 41 3) Atomizing Steam: 42 Pres.(avail. at burners) kg/cm2 g 8 o 43 Temperature at Burner C 200 44 COMBUSTION DESIGN CONDITIONS 45 Excess Air (Fuel Oil, Gas) % Guaranteed Efficiency min. 81 % Calc. Efficiency % 46 Radiation loss, % of heat release % 47 Calc. Heat Release MM kcal/hr Volumetric heat release kcal/hr.m3 o o 48 Flue Gas Temp. Leaving Radiant Sect. C Flue Gas Temp. Leaving Convection Section C 49 Flue Gas Draft at Radiant Outlet Pa Flue Gas Draft at Convection Section Pa 50 Flue Gas Draft at Burners Pa 51 Flue Gas Flow Rate kg/s 52 Ambient air temperature -8 ~ +55 oC Combustion air design temperature o C 53 54 NOTES: Manufacturer shall be submit the suitable design for approval 55 56 Project BAGHDAD BLOWING ASPHALT UNITS/IRAQ
TOP SKY OIL Page
TOP SKY OIL &PETROLEUM SERVICES LTD. www.topskyoil.com 1/2 0 R. Des. Chd. Ap. Date Description & PETROLEUM SERVICES LTD HEATER Service: VACUUM Heater Item N°: F01 1 MECHANICAL DESIGN CONDITIONS 2 Section RADIATION CONVECTION SUPERHEATER 3 Coil Design o 4 Design Fluid Temperature C 380 380 400 2 5 Design Pressure kg/cm g 20 20 5 6 Corrosive Allowance mm 3 3 3 7 Hydrostatic Test Pressure kg/cm2 g 8 Number of Passes 9 Stress Relieve (YES or NO) yes yes yes 10 Weld Inspection Requirements (X-ray or other) RTG 100% RTG 100% RTG 100% 11 Heater Tube Coils Connection bend bend bend 12 Tubes 13 Vertical or Horizontal Horizontal 14 Material A 335 P9 A 335 P9 SA 213 T22 15 Wall thickness (minimum/average) mm 16 Design basis for tube wall thickness API 530 17 18 Crossovers 19 Type (welded or flanged) welded 20 Location 21 22 Burners 23 Manufacturer and Type Number of Burners 6 24 Location 25 Size and Type of Pilots 26 Heat Release per Burner at Design Excess Air and Draft: Normal Gcal/h Maximum Gcal/h 27 Noise Level: <85 dB (at 1m) 28 Miscellaneous 29 Overall Dimensions of Furnace Length Height Width mm 30 31 Special equipment 32 Soot blowers retractable 33 34 35 Special Requirements, Codes and Standards Maximum main dimensions of the heater is to be eliminated to 2500x10000mm (see enclosure No.3 - 1 page 36 in total). All necessary operating and acces platforms, stairways and ladders are required. 37 All feed inputs/feed outlets on one short side of the heater is to be designed. As an alternative shall be offered: a) two pcs. of forced draft fans (running+stand-by), one with electric drive, the second one with turbine incl. 38 maximum dimensions and weights of each one b) all relevant interconnecting air ducts on suction/discharge side of fans Scope of supply shall include process and mechanical detail design, material procurement and fabrication, 39 inspection and testing, delivery of all refractory lining incl. relevant anchoring etc., painting and supply documentation 40 Codes and Standards, Documents, Mechanical Requirements see enclosure. No.4 (7 pages in total) 41 API 560, API 530 42 43 Notes: 44 1) Required flexibility 60-105% (Heat duty as well as fluid flow rates) 45 2) include 1000 kg/h water 46 3) Composition and conditions for Fuel gas, N.gas, Fuel oil see encloruse No. 1 (3 pages in total). 47 4) nomographs - enthalphic and pressure curves, liquid density curves, vapours mol. weight curves 48 see encloruse No.2, Rev.1 (3 pages in total) 49 50 Project BAGHDAD BLOWING ASPHALT UNITS/IRAQ TOP SKY OIL Page TOP SKY OIL &PETROLEUM SERVICES LTD. www.topskyoil.com 2/2 0 R. & PETROLEUM SERVICES LTD Des. Chd. Ap. Date Description