Perhitungan Volume Ruko 2 Lantai: No Macam Pekerjaan A Lantai 1

The document appears to be calculating volumes for concrete work on a building project. It includes calculations for various concrete elements of the first floor, including foundations, beams, columns, and floor plates. It lists the types of concrete elements, provides their dimensions, and calculates their volumes. The total volumes are summarized for items like formwork, beams, and floor plates of the first level.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views35 pages

Perhitungan Volume Ruko 2 Lantai: No Macam Pekerjaan A Lantai 1

The document appears to be calculating volumes for concrete work on a building project. It includes calculations for various concrete elements of the first floor, including foundations, beams, columns, and floor plates. It lists the types of concrete elements, provides their dimensions, and calculates their volumes. The total volumes are summarized for items like formwork, beams, and floor plates of the first level.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 35

PERHITUNGAN VOLUME

No Macam Pekerjaan

A LANTAI 1

IV PEKERJAAN BETON
1 Pondasi footplat

pondasi tangga

bekisting balok
BEKISTING KOLOM LT 1

BEKISTING PELAT

T.PLAT 120MM T.PLAT 120MM T.PLAT 120MM

T.PLAT 120MM T.PLAT 120MM T.PLAT 120MM

T.PLAT 120MM

T.PLAT 120MM T.PLAT 120MM

T.PLAT 120MM

T.PLAT 120MM T.PLAT 120MM T.PLAT 120MM


T.PLAT 120MM T.PLAT 120MM T.PLAT 120MM

3 beton tie beam TB 350 X 500

5650
4650 TB 350 X 500 TB 350 X 500

PEMBESIAN TIE BEAM 350/500

TB 350 X 500
TB 350 X 500 TB 350 X 500 TB 350 X 500
TB 350 X 500

TB2 250 X 400

TB 350 X 500 TB 350 X 500 TB 350 X 500

TB 350 X 500 TB 350 X 500 TB 350 X 500


TB 350 X 500
PEMBESIAN TIE BEAM 250/400

VOLUME BETON BALOK L 1 B 350 X 500


B 350 X 500
5650

4650 B 350 X 500 B 350 X 500


350 X 500

350 X 500
B 35
56
4650 B 350 X 500 B 350 X 500

B 350 X 500

B 350 X 500

B 350 X 500
B 350 X 500 B 350 X 500 B 350 X 500

B 350 X 500

B 350 X 500

B 350 X 500
B2 250 X 400

B 350 X 500 B 350 X 500 B 350 X 500

B 350 X 500

B 350 X 500
B 350 X 500 B 350 X 500 B 350 X 500
B 350 X 500

TB 350 X 500
VOLUME BETON PLAT
5650

4650 TB 350 X 500 TB 350 X 500


TB
4650 TB 350 X 500 TB 350 X 500

TB 350 X 500
TB 350 X 500 TB 350 X 500 TB 350 X 500

TB 350 X 500
TB2 250 X 400

TB 350 X 500 TB 350 X 500 TB 350 X 500

TB 350 X 500 TB 350 X 500 TB 350 X 500


TB 350 X 500

PEMBESIAN KOLOM
PEMBESIAN PLAT LANTAI
PERHITUNGAN VOLUME RUKO 2 LANTAI

PERHI
Penampang ket
PANJANG

1.2

kotak 1.1
trapesium 1.4
kolom 0.3

TOTAL PONDASI FOOTPLAT

balok 350/500 tembereng 2 sisi 15.40


2 4.65
120

5.65
24.4
380

TEMBERENG
120
380
TEMBERENG balok 350/500 bodeman 15.35
4.65
5.65
24.35
BODEMAN

balok 250/400 tembereng 2 sisi 4.65


2 2.7

balok 250/400 bodeman 4.65


2.7

TOTAL BEKISTING

TINGGI X LEBAR X 4 SISI


KARENA ADA 16 KOLOM

lantai 1 4.65

2.7

T.PLAT 120MM T.PLAT 120MM T.PLAT 120MM

lantai 3 4.65

T.PLAT 120MM T.PLAT 120MM T.PLAT 120MM

T.PLAT 120MM

T.PLAT 120MM T.PLAT 120MM

T.PLAT 120MM

T.PLAT 120MM T.PLAT 120MM T.PLAT 120MM


T.PLAT 120MM T.PLAT 120MM T.PLAT 120MM

TB 350 X 500 L 1 B1 350/500 15.35


4.65
5.65
24.35
5650

L 1 B1 250/400 4.65
4650 TB 350 X 500 TB 350 X 500
2.7

TOTAL BE

PEMBESIAN TUL UTAMA BEAM TUMPUAN ((P*1/4L)+(40*d)*b


TB 350 X 500

TB 350 X 500 TB 350 X 500 TB 350 X 500


TB 350 X 500

KARENA 2 TUMPUAN 15.36


16.98
TB2 250 X 400
23.22
19.86

TB 350 X 500 TB 350 X 500 TB 350 X 500

SENGKANG KELILING + (2*4D) + (5*0.01)


TB 350 X 500 TB 350 X 500
TB 350 X 500
TB 350 X 500 KELILING SENGKANG
JARAK SENGKANG 10 CM 566.79
TOTAL SENGKANG

PEMBESIAN TUL UTAMA BEAM LAPANGAN ((P*1/2L)+(40*d)*

15.36
16.98
23.218
19.855
SENGKANG KELILING + (2*4D) + (5*0.01)

KELILING SENGKANG
JARAK SENGKANG 20 CM 283.40
TOTAL SENGKANG

TOTAL PEMBESIAN BEAM 350/500

PEMBESIAN TUL UTAMA BEAM TUMPUAN ((P*1/4L)+(40*d)*b

KARENA ADA 2 TUMPUAN 5.64

SENGKANG KELILING + (2*4D) + (5*0.01)

KELILING SENGKANG
JARAK SENGKANG 10 CM 11.29
TOTAL SENGKANG

PEMBESIAN TUL UTAMA BEAM LAPANGAN ((P*1/2L)+(40*d)*

6.81

SENGKANG KELILING + (2*4D) + (5*0.01)

KELILING SENGKANG
JARAK SENGKANG 20 CM 6.81
TOTAL SENGKANG

TOTAL PEMBESIAN BEAM 250/400

B 350 X 500 L 1 B1 350/500 15.35


4.65
5.65
B 350 X 500

24.35
5650

4650 B 350 X 500 B 350 X 500 L1 B1 250/400 4.65


350 X 500

350 X 500
B 35
56
4650 B 350 X 500 B 350 X 500

B 350 X 500

B 350 X 500
TOTAL BE

B 350 X 500
B 350 X 500 B 350 X 500 B 350 X 500
B 350 X 500

B 350 X 500

B 350 X 500
B2 250 X 400

L.2 B1 350/500 15.35


B 350 X 500 B 350 X 500 B 350 X 500 4.65
5.65
24.35
B 350 X 500

B 350 X 500

L.2 B1 250/400 4.65


2.7
B 350 X 500 B 350 X 500 B 350 X 500
B 350 X 500
TOTAL BE

L.3B1 350/500 15.35


4.65
5.65
24.35

L.3B1 250/400 4.65

TOTAL BE

TB 350 X 500
PELAT 120MM 4.65
2.7
5650

pelat 120mm lt.3 4.65

4650 TB 350 X 500 TB 350 X 500


TB
4650 TB 350 X 500 TB 350 X 500

TB 350 X 500
TB 350 X 500 TB 350 X 500 TB 350 X 500
TB 350 X 500

TB2 250 X 400

TB 350 X 500 TB 350 X 500 TB 350 X 500

TB 350 X 500 TB 350 X 500 TB 350 X 500


TB 350 X 500

KOLOM 40/40
KOLOM KOLOM
TYPE STRUKTUR PRAKTIS v besi utama = (tbeton + 40d * byk tu)

ADA 20 KOLOM MAKA 54


40 320 40
150

POTONGAN
40

150
400
320
40

UKURAN 400 X 400 150 X 150


JUMLAH TULANGAN 12 D 16 4 D 10 v besi Sengkang = (keliling besi + 2*0.05 + 5*0.01) / jarak seng
SENGKANG D10 - 100 D10 - 100

KELILING SENGKAN
jarak sengkang 10 CM
TOTAL KEBUTUHAN 1KOLOM

ADA 10 KOLOM MAKA


TOTAL PEMBESIAN KOLOM STRUKKT

KOLOM PRAKTIS 15/15

v besi utama = (tbeton + 40d * byk tu)

ADA 26 KOLOM MAKA 7.56

v besi Sengkang = (keliling besi + 2*0.05 + 5*0.01) / jarak seng


v besi Sengkang = (keliling besi + 2*0.05 + 5*0.01) / jarak seng

KELILING SENGKAN
jarak sengkang 10 CM
TOTAL KEBUTUHAN 1KOLOM

ADA 26 KOLOM MAKA

TOTAL PEMBESIAN KOLOM PRATI

4650
4.65
JUMLAH TULANGAN = L/JARAK 2.75

TUL. BAWAH 5.65


TUL. ATAS 5.65

TUL. BAWAH
TUL. ATAS

ADA 11 PLAT'

2.7
JUMLAH TULANGAN = L/JARAK 4.65

TUL. BAWAH 2.7


TUL. ATAS 2.7

TUL. BAWAH
TUL. ATAS

ADA 2 PLAT'

TOTAL PEMBESIAN PLAT


TAI
1.58 0.62
18.94

PERHITUNGAN
VOLUME SATUAN
LEBAR TINGGI BERAT BANYAK

0.298 8 2.86 M3

1.2 0.15 0.20 M3


1.2 0.1 0.17 M3
0.3 5.2 0.47 M3
0.83 M3

AL PONDASI FOOTPLAT 3.69 M3

0.5 2 30.80 M3
0.5 6 27.90 M3
0.5 4 22.60 M3
0.5 2 48.80 M3
130.10 M3

0.35 2 10.75 M3
0.35 6 9.77 M3
0.35 4 7.91 M3
0.35 2 17.05 M3
45.47 M3

0.4 12 44.64 m2
0.4 1 2.16

0.25 12 13.95 m2
0.25 1 0.68

TOTAL BEKISTING 234.16 M2

0.4 5 4 8.00 M3
20 160.00 M3

2.75 0.12 22 33.76 M3


M3
2.15 0.12 1 0.70 M3
34.46

2.75 0.12 24 36.83 M3


0.35 0.5 2 5.37 M3
0.35 0.5 8 6.51 M3
0.35 0.5 11 10.88 M3
0.35 0.5 2 8.52 M3
31.28 M3

0.25 0.4 12 5.58 M3


0.25 0.4 1 0.27 M3
5.85
TOTAL BETON BEAM 37.13 M3

PUAN ((P*1/4L)+(40*d)*bnyk tul)

2 61.42 M
2 67.92 M
2 278.61 M
2 158.84 M
TOTAL 566.79 M
10734.37 KG

.01)

1.67 M
5669 BTG
9467.06 M
5869.58 KG

NGAN ((P*1/2L)+(40*d)*bnyk tul)

30.71 M
33.96 M
139.31 M
79.42 M
283.40 M
TOTAL 5367.18 KG
.01)

1.67 M
1417.98 BTG
2368.02 M
1468.17 KG

EMBESIAN BEAM 350/500 12685.27 m

PUAN ((P*1/4L)+(40*d)*bnyk tul)

2 11.29 M
0.94 BTG
213.73 KG

.01)

1.27 M
113.85 BH
144.59 M
89.65 KG

NGAN ((P*1/2L)+(40*d)*bnyk tul)

6.81 M
128.88 KG

.01)

1.27 M
35.03 BH
44.48 M
27.58 KG

EMBESIAN BEAM 250/400 20.63 m

0.35 0.5 2 5.37 M3 1 KG 0.000486


0.35 0.5 8 6.51 M3
0.35 0.5 11 10.88 M3
0.35 0.5 2 8.52 M3 2 0.000972
31.28 M3
64365 KG

0.25 0.4 1 0.47 M3 3


0.47 M3

TOTAL BETON BALOK 31.75 M3 0.000972 2

0.35 0.5 2 5.37 M3


0.35 0.5 8 6.51 M3
0.35 0.5 11 10.88 M3
0.35 0.5 2 8.52 M3
31.28 M3

0.25 0.4 12 5.58 M3


0.25 0.4 1 0.27 M3
5.85
TOTAL BETON BEAM 31.55 M3

0.35 0.5 2 5.37 M3


0.35 0.5 8 6.51 M3
0.35 0.5 11 10.88 M3
0.35 0.5 2 8.52 M3
31.28 M3

0.25 0.4 1 0.47 M3


0.47 M3

TOTAL BETON BEAM 31.75 M3

2.75 0.12 22 33.76 M3


2.15 0.12 1 0.70 M3
34.46 M3

2.75 0.12 24 36.83 M3


u)

20 1080.00 M
90.00 BTG
20454 KG

.05 + 5*0.01) / jarak sengkang

1.43 M
4.5 46.00 bh
65.78 M
40.78 KG
2 131.56 KG
BESIAN KOLOM STRUKKTUR 1146 m

u)

26 196.56 M
16.38 BTG
121.87 KG

.05 + 5*0.01) / jarak sengkang


.05 + 5*0.01) / jarak sengkang

0.55 M
5 51.00 BH
28.05 M
17.39 KG
26 452.17 KG

EMBESIAN KOLOM PRATIS 224.61 m

23 BH
14 BH

77.69 M
77.69 M

4.65 108.11 M
4.65 108.11 M
TOTAL 371.60 M

22 8175 M

14 BH
23 BH

36.45 M
36.45 M

5.65 131.36 M
5.65 131.36 M
TOTAL 335.63 M

2 671.25 M

TAL PEMBESIAN PLAT 8846.5 M


RENCANA ANGGARAN BIAYA ( RAB )
KANTOR 3 LANTAI

NO MACAM PEKERJAAN SAT VOL. HARGA SAT. JML. HARGA JUMLAH TOTAL (+PPN 10%)

1 PEKERJAAN PERSIAPAN
MOBILITAS/JALAN SEMENTARA m2 75.00 Rp 292,907.14Rp 21,968,035.50 Rp 24,164,839.05
PENGUKURAN & PEMASANGAN BOWPLANK m' 171.00 Rp 210,315.35Rp 35,963,924.85 Rp 39,560,317.34
PEMBERSIHAN LAHAN m2 360.00 Rp 13,059.82Rp 4,701,535.20 Rp 5,171,688.72
PENGGALIAN TANAH m2 360.00 Rp 55,945.43Rp 20,140,354.80 Rp 22,154,390.28
PAGAR PROYEK m' 156.00 Rp 117,010.02Rp 18,253,563.12 Rp 20,078,919.43
GUDANG m2 30.00 Rp 1,615,636.42Rp 48,469,092.60 Rp 53,316,001.86
DIREKSI KEET m2 30.00 Rp 3,911,678.27Rp 117,350,348.10 Rp 129,085,382.91
SALURAN AIR BERSIH & KOTOR unit 2.00 Rp 3,236,341.68Rp 6,472,683.36 Rp 7,119,951.70
DOKUMENTASI, GAMBAR, DLL hr/unit 50.00 Rp 532,500.00Rp 26,625,000.00 Rp 29,287,500.00
Rp - Rp 329,938,991.28
2 PEKERJAAN BETON PONDASI Rp -
PEKERJAAN BETON TIANG PANCANG bh 70.67 Rp 905,060.85 Rp 63,960,650.27 Rp 70,356,715.30
PEKERJAAN BETON PILECAP m3 5.00 Rp 709,427.78 Rp 3,547,138.90 Rp 3,901,852.79
Rp - Rp 74,258,568.09
PEKERJAAN PEMBESIAN Rp -
PEMBESIAN PILECAP m3 400.00 Rp 8,544.17 Rp 3,417,668.00 Rp 3,759,434.80
Rp 3,759,434.80
3 PEKERJAAN BETON LANTAI 1
BEKISTING TIE BEAM m3 234.16 Rp 109,144.33 Rp 25,556,691.37 Rp 28,112,360.51
1 BEKISTING BALOK m3 234.16 Rp 109,144.33 Rp 25,556,691.37 Rp 28,112,360.51
2 BEKISTING KOLOM m3 160.00 Rp 75,833.67 Rp 12,133,386.67 Rp 13,346,725.33
3 BEKISTING PELAT m3 34.46 Rp 341,800.00 Rp 11,776,924.08 Rp 12,954,616.49
4 Beton 1 : 2 : 3, BEAM 35/50 m3 31.28 Rp 709,427.78 Rp 22,191,787.67 Rp 24,410,966.44
5 Beton 1 : 2 : 3, BEAM 25/40 m3 5.85 Rp 709,427.78 Rp 4,150,152.50 Rp 4,565,167.75
6 Beton 1 : 2 : 3, BALOK 35/50 m3 31.28 Rp 709,427.78 Rp 22,191,787.67 Rp 24,410,966.44
7 Beton 1 : 2 : 3, BALOK 25/40 m3 5.85 Rp 709,427.78 Rp 4,150,152.50 Rp 4,565,167.75
8 BETON PELAT 120mm m3 34.46 Rp 1,569,740.00 Rp 54,086,333.54 Rp 59,494,966.90
9 KOLOM STRUKTUR 40X40 m3 80.00 Rp 153,210.61 Rp 12,256,848.58 Rp 13,482,533.44
10
Rp 213,455,831.56

4 PEKERJAAN PEMBESIAN LT 1
1 PEMBESIAN BEAM 350/500 m3 12,685.27 Rp 8,544.17 Rp 108,385,029.05 Rp 119,223,531.96
2 PEMBESIAN BEAM 250/400 m3 20.63 Rp 8,544.17 Rp 176,266.16 Rp 193,892.77
3 PEMBESIAN BALOK 350 X 500 m3 12,685.27 Rp 8,544.17 Rp 108,385,029.05 Rp 119,223,531.96
4 PEMBESIAN BALOK 250 X 400 m3 20.63 Rp 8,544.17 Rp 176,266.16 Rp 193,892.77
5 PEMBESIAN KOLOM STRUKTUR m3 1,145.78 Rp 18,739.70 Rp 21,471,573.47 Rp 23,618,730.81
6 Rp - Rp -
7 PEMBESIAN PLAT LANTAI m3 8,175.20 Rp 8,544.17 Rp 69,850,271.33 Rp 76,835,298.47
Rp 339,288,878.74
5 PEKERJAAN BETON LANTAI 2
1 BEKISTING BALOK m3 234.16 Rp 109,144.33 Rp 25,556,691.37 Rp 28,112,360.51
2 BEKISTING KOLOM m3 160.00 Rp 75,833.67 Rp 12,133,386.67 Rp 13,346,725.33
3 BEKISTING PELAT m3 34.46 Rp 341,800.00 Rp 11,776,924.08 Rp 12,954,616.49
4 Beton 1 : 2 : 3, BALOK 35/50 m3 31.28 Rp 709,427.78 Rp 22,191,787.67 Rp 24,410,966.44
5 Beton 1 : 2 : 3, BALOK 25/40 m3 5.85 Rp 709,427.78 Rp 4,150,152.50 Rp 4,565,167.75
8 BETON PELAT 120mm m3 34.46 Rp 1,569,740.00 Rp 54,086,333.54 Rp 59,494,966.90
6 KOLOM STRUKTUR 40X40 m3 53.76 Rp 153,210.61 Rp 8,236,602.25 Rp 9,060,262.47
7 m3 Rp - Rp - Rp -
Rp 151,945,065.89
6 PEKERJAAN PEMBESIAN LT 2
1 PEMBESIN BALOK 350 X 500 m3 12,685.27 Rp 8,544.17 Rp 108,385,029.05 Rp 119,223,531.96
2 PEMBESIN BALOK 250 X 400 m3 20.63 Rp 8,544.17 Rp 176,266.16 Rp 193,892.77
3 PEMBESIAN KOLOM STRUKTUR m3 1,145.78 Rp 18,739.70 Rp 21,471,573.47 Rp 23,618,730.81
4 m3 Rp - Rp - Rp -
5 PEMBESIAN PLAT LANTAI m3 8,175.20 Rp 8,544.17 Rp 69,850,271.33 Rp 76,835,298.47
Rp 219,871,454.01

7 PEKERJAAN BETON LANTAI 3


1 BEKISTING BALOK m3 234.16 Rp 109,144.33 Rp 25,556,691.37 Rp 28,112,360.51
2 BEKISTING KOLOM m3 160.00 Rp 75,833.67 Rp 12,133,386.67 Rp 13,346,725.33
3 BEKISTING PELAT m3 36.83 Rp 341,800.00 Rp 12,587,810.40 Rp 13,846,591.44
4 Beton 1 : 2 : 3, BALOK 35/50 m3 31.28 Rp 709,427.78 Rp 22,191,787.67 Rp 24,410,966.44
5 Beton 1 : 2 : 3, BALOK 25/40 m3 5.85 Rp 709,427.78 Rp 4,150,152.50 Rp 4,565,167.75
6 BETON PELAT 120mm m3 36.83 Rp 1,569,740.00 Rp 57,810,384.72 Rp 63,591,423.19
7 KOLOM STRUKTUR 40X40 m3 53.76 Rp 153,210.61 Rp 8,236,602.25 Rp 9,060,262.47
8 m3 Rp - Rp - Rp -
Rp 156,933,497.14

8 PEKERJAAN PEMBESIAN LT 3
1 PEMBESIN BALOK 350 X 500 m3 12,685.27 Rp 8,544.17 Rp 108,385,029.05 Rp 119,223,531.96
2 PEMBESIN BALOK 250 X 400 m3 20.63 Rp 8,544.17 Rp 176,266.16 Rp 193,892.77
3 PEMBESIAN KOLOM STRUKTUR m3 1,145.78 Rp 18,739.70 Rp 21,471,573.47 Rp 23,618,730.81
4 m3 0.00 Rp - Rp - Rp -

22
NO MACAM PEKERJAAN SAT VOL. HARGA SAT. JML. HARGA JUMLAH TOTAL (+PPN 10%)

1 PEKERJAAN PERSIAPAN
5 PEMBESIAN PLAT LANTAI m3 8,846.45 Rp 8,544.17 Rp 75,585,543.21 Rp 83,144,097.53
Rp 226,180,253.07

JUMLAH TOTAL (+PPN 10%) Rp 1,637,613,971.70

23
NO MACAM PEKERJAAN JML. HARGA

1 PEKERJAAN PERISAPAN
MOBILITAS/JALAN SEMENTARA Rp 24,164,839.05
PENGUKURAN & PEMASANGAN BOWPLANK Rp 39,560,317.34
PEMBERSIHAN LAHAN Rp 5,171,688.72
PENGGALIAN TANAH Rp 22,154,390.28
PAGAR PROYEK Rp 20,078,919.43
GUDANG Rp 53,316,001.86
DIREKSI KEET Rp 129,085,382.91
SALURAN AIR BERSIH & KOTOR Rp 7,119,951.70
DOKUMENTASI, GAMBAR, DLL Rp 29,287,500.00

PEKERJAAN BETON PONDASI


Pekerjan Driving pile Rp 2,048,957
Bobok Kepala Pile Rp 13,060
Lantai Kerja Rp 864,378
Pembesian Pilecap Rp 101,912
Bekisting Pilecap Rp 307,531
Pengecoran Pilecap Rp 1,119,392
urugan tanah kembali Rp 55,945
urugan pasir Rp 285,022

PEKERJAAN BETON TIANG PANCANG Rp 70,356,715.30


PEKERJAAN BETON PILECAP Rp 3,901,852.79

PEKERJAAN PEMBESIAN
PEKERJAAN PILECAP Rp 3,759,434.80

3 PEKERJAAN BETON LANTAI 1


BEKISTING TIE BEAM Rp 28,112,360.51
1 BEKISTING BALOK Rp 28,112,360.51
2 BEKISTING KOLOM Rp 13,346,725.33
3 BEKISTING PELAT Rp 12,954,616.49
4 Beton 1 : 2 : 3,TIE BEAM 35/50 Rp 24,410,966.44
5 Beton 1 : 2 : 3,TIE BEAM 25/40 Rp 4,565,167.75
6 Beton 1 : 2 : 3, BALOK 35/50 Rp 24,410,966.44
7 Beton 1 : 2 : 3, BALOK 25/40 Rp 4,565,167.75
8 BETON PELAT 120mm Rp 59,494,966.90
9 KOLOM STRUKTUR 40X40 Rp 13,482,533.44
10
4 PEKERJAAN PEMBESIAN LT 1
1 PEMBESIAN TIE BEAM 350/500 Rp 119,223,531.96
2 PEMBESIAN TIE BEAM 250/400 Rp 193,892.77
3 PEMBESIAN BALOK 350 X 500 Rp 119,223,531.96
4 PEMBESIAN BALOK 250 X 400 Rp 193,892.77
5 PEMBESIAN KOLOM STRUKTUR Rp 23,618,730.81
7 PEMBESIAN PLAT LANTAI Rp 76,835,298.47

5 PEKERJAAN BETON LANTAI 2


1 BEKISTING BALOK Rp 28,112,360.51
2 BEKISTING KOLOM Rp 13,346,725.33
3 BEKISTING PELAT Rp 12,954,616.49
4 Beton 1 : 2 : 3, BALOK 35/50 Rp 24,410,966.44
5 Beton 1 : 2 : 3, BALOK 25/40 Rp 4,565,167.75
8 BETON PELAT 120mm Rp 59,494,966.90
6 KOLOM STRUKTUR 40X40 Rp 9,060,262.47
7

6 PEKERJAAN PEMBESIAN LT 2
1 PEMBESIAN BALOK 350 X 500 Rp 119,223,531.96
2 PEMBESIAN BALOK 250 X 400 Rp 193,892.77
3 PEMBESIAN KOLOM STRUKTUR Rp 23,618,730.81
5 PEMBESIAN PLAT LANTAI Rp 76,835,298.47

7 PEKERJAAN BETON LANTAI 3


1 BEKISTING BALOK Rp 28,112,360.51
2 BEKISTING KOLOM Rp 13,346,725.33
3 BEKISTING PELAT Rp 13,846,591.44
4 Beton 1 : 2 : 3, BALOK 35/50 Rp 24,410,966.44
5 Beton 1 : 2 : 3, BALOK 25/40 Rp 4,565,167.75
6 BETON PELAT 120mm Rp 63,591,423.19
7 KOLOM STRUKTUR 40X40 Rp 9,060,262.47
8 Rp -
Rp -
Rp -
8 PEKERJAAN PEMBESIAN LT 3 Rp -
1 PEMBESIAN BALOK 350 X 500 Rp 119,223,531.96
2 PEMBESIAN BALOK 250 X 400 Rp 193,892.77
3 PEMBESIAN KOLOM STRUKTUR Rp 23,618,730.81
5 PEMBESIAN PLAT LANTAI Rp 83,144,097.53

JUMLAH TOTAL Rp 1,720,428,171.05


RENCANA FISIK PER-MINGGU
RENCANA FISIK KUMULATIF
BOBOT PEKERJAAN (%) DURASI BULAN 1
1 2 3

1.405 10 0.983 0.421


2.299 3 2.299
0.301 3 0.301
1.288 3 1.288
1.167 2 1.167
3.099 5 2.479 0.620
7.503 6 5.002 2.50103211
0.414 3 0.414
1.702 90 0.993 0.993 0.993

4.089 6 4.089
0.227 6 0.227

0.219 3 0.073 0.146

1.634 3
1.634 3
0.776 3
0.753 3
1.419 7
0.265 7
1.419 7
0.265 7
3.458 7
0.784 7
-
-
-
-
6.930 2
0.011 2
6.930 2
0.011 2
1.373 2
4.466 3
-
-
1.634 3
0.776 3
0.753 3
1.419 7
0.265 7
3.458 7
0.527 7
-
-
-
6.930 2
0.011 2
1.373 2
4.466 2
-
-
-
1.634 3
0.776 3
0.805 3
1.419 7
0.265 7
3.696 7
0.527 7
-
-
-
-
6.930 2
0.011 2
1.373 2
4.833 2

100
14.926 4.608 5.455
14.926 19.534 24.989
WAKTU PELAKSANAAN
N1 BULAN 2 BULAN 3
4 1 2 3 4 1 2 3

0.993 0.993 0.993 0.993 0.993 0.993 0.993 0.993

1.634
1.634
0.517 0.259
0.753
1.216 0.203
0.227 0.038
0.203 1.216
0.038 0.227
0.494 2.964
0.672 0.112
0.981 5.949
0.011
6.930
0.011
1.373
1.807 2.659

0.545 1.089
0.277 0.499
0.251 0.502
1.419
0.265
3.458
0.527

4.780 2.15
0.011
1.373
1.616 2.85

1.195 0.439
0.776
0.805
0.81079373
0.15162896
2.11214608
0.30093049

6.207 0.723
0.011
0.638 0.735
4.280 0.553

5.509 9.316 13.215 9.132 10.863 11.662 14.129 7.594


30.499 39.814 53.030 62.162 73.026 84.688 98.816 106.411
N3 BULAN 4
4 1 2 3 4

0.993
0.60809529
0.11372172
1.58410956
0.22569786

3.525 - - - -
109.935