Perhitungan Volume Ruko 2 Lantai: No Macam Pekerjaan A Lantai 1
Perhitungan Volume Ruko 2 Lantai: No Macam Pekerjaan A Lantai 1
No Macam Pekerjaan
A LANTAI 1
IV PEKERJAAN BETON
1 Pondasi footplat
pondasi tangga
bekisting balok
BEKISTING KOLOM LT 1
BEKISTING PELAT
T.PLAT 120MM
T.PLAT 120MM
5650
4650 TB 350 X 500 TB 350 X 500
TB 350 X 500
TB 350 X 500 TB 350 X 500 TB 350 X 500
TB 350 X 500
350 X 500
B 35
56
4650 B 350 X 500 B 350 X 500
B 350 X 500
B 350 X 500
B 350 X 500
B 350 X 500 B 350 X 500 B 350 X 500
B 350 X 500
B 350 X 500
B 350 X 500
B2 250 X 400
B 350 X 500
B 350 X 500
B 350 X 500 B 350 X 500 B 350 X 500
B 350 X 500
TB 350 X 500
VOLUME BETON PLAT
5650
TB 350 X 500
TB 350 X 500 TB 350 X 500 TB 350 X 500
TB 350 X 500
TB2 250 X 400
PEMBESIAN KOLOM
PEMBESIAN PLAT LANTAI
PERHITUNGAN VOLUME RUKO 2 LANTAI
PERHI
Penampang ket
PANJANG
1.2
kotak 1.1
trapesium 1.4
kolom 0.3
5.65
24.4
380
TEMBERENG
120
380
TEMBERENG balok 350/500 bodeman 15.35
4.65
5.65
24.35
BODEMAN
TOTAL BEKISTING
lantai 1 4.65
2.7
lantai 3 4.65
T.PLAT 120MM
T.PLAT 120MM
L 1 B1 250/400 4.65
4650 TB 350 X 500 TB 350 X 500
2.7
TOTAL BE
15.36
16.98
23.218
19.855
SENGKANG KELILING + (2*4D) + (5*0.01)
KELILING SENGKANG
JARAK SENGKANG 20 CM 283.40
TOTAL SENGKANG
KELILING SENGKANG
JARAK SENGKANG 10 CM 11.29
TOTAL SENGKANG
6.81
KELILING SENGKANG
JARAK SENGKANG 20 CM 6.81
TOTAL SENGKANG
24.35
5650
350 X 500
B 35
56
4650 B 350 X 500 B 350 X 500
B 350 X 500
B 350 X 500
TOTAL BE
B 350 X 500
B 350 X 500 B 350 X 500 B 350 X 500
B 350 X 500
B 350 X 500
B 350 X 500
B2 250 X 400
B 350 X 500
TOTAL BE
TB 350 X 500
PELAT 120MM 4.65
2.7
5650
TB 350 X 500
TB 350 X 500 TB 350 X 500 TB 350 X 500
TB 350 X 500
KOLOM 40/40
KOLOM KOLOM
TYPE STRUKTUR PRAKTIS v besi utama = (tbeton + 40d * byk tu)
POTONGAN
40
150
400
320
40
KELILING SENGKAN
jarak sengkang 10 CM
TOTAL KEBUTUHAN 1KOLOM
KELILING SENGKAN
jarak sengkang 10 CM
TOTAL KEBUTUHAN 1KOLOM
4650
4.65
JUMLAH TULANGAN = L/JARAK 2.75
TUL. BAWAH
TUL. ATAS
ADA 11 PLAT'
2.7
JUMLAH TULANGAN = L/JARAK 4.65
TUL. BAWAH
TUL. ATAS
ADA 2 PLAT'
PERHITUNGAN
VOLUME SATUAN
LEBAR TINGGI BERAT BANYAK
0.298 8 2.86 M3
0.5 2 30.80 M3
0.5 6 27.90 M3
0.5 4 22.60 M3
0.5 2 48.80 M3
130.10 M3
0.35 2 10.75 M3
0.35 6 9.77 M3
0.35 4 7.91 M3
0.35 2 17.05 M3
45.47 M3
0.4 12 44.64 m2
0.4 1 2.16
0.25 12 13.95 m2
0.25 1 0.68
0.4 5 4 8.00 M3
20 160.00 M3
2 61.42 M
2 67.92 M
2 278.61 M
2 158.84 M
TOTAL 566.79 M
10734.37 KG
.01)
1.67 M
5669 BTG
9467.06 M
5869.58 KG
30.71 M
33.96 M
139.31 M
79.42 M
283.40 M
TOTAL 5367.18 KG
.01)
1.67 M
1417.98 BTG
2368.02 M
1468.17 KG
2 11.29 M
0.94 BTG
213.73 KG
.01)
1.27 M
113.85 BH
144.59 M
89.65 KG
6.81 M
128.88 KG
.01)
1.27 M
35.03 BH
44.48 M
27.58 KG
20 1080.00 M
90.00 BTG
20454 KG
1.43 M
4.5 46.00 bh
65.78 M
40.78 KG
2 131.56 KG
BESIAN KOLOM STRUKKTUR 1146 m
u)
26 196.56 M
16.38 BTG
121.87 KG
0.55 M
5 51.00 BH
28.05 M
17.39 KG
26 452.17 KG
23 BH
14 BH
77.69 M
77.69 M
4.65 108.11 M
4.65 108.11 M
TOTAL 371.60 M
22 8175 M
14 BH
23 BH
36.45 M
36.45 M
5.65 131.36 M
5.65 131.36 M
TOTAL 335.63 M
2 671.25 M
NO MACAM PEKERJAAN SAT VOL. HARGA SAT. JML. HARGA JUMLAH TOTAL (+PPN 10%)
1 PEKERJAAN PERSIAPAN
MOBILITAS/JALAN SEMENTARA m2 75.00 Rp 292,907.14Rp 21,968,035.50 Rp 24,164,839.05
PENGUKURAN & PEMASANGAN BOWPLANK m' 171.00 Rp 210,315.35Rp 35,963,924.85 Rp 39,560,317.34
PEMBERSIHAN LAHAN m2 360.00 Rp 13,059.82Rp 4,701,535.20 Rp 5,171,688.72
PENGGALIAN TANAH m2 360.00 Rp 55,945.43Rp 20,140,354.80 Rp 22,154,390.28
PAGAR PROYEK m' 156.00 Rp 117,010.02Rp 18,253,563.12 Rp 20,078,919.43
GUDANG m2 30.00 Rp 1,615,636.42Rp 48,469,092.60 Rp 53,316,001.86
DIREKSI KEET m2 30.00 Rp 3,911,678.27Rp 117,350,348.10 Rp 129,085,382.91
SALURAN AIR BERSIH & KOTOR unit 2.00 Rp 3,236,341.68Rp 6,472,683.36 Rp 7,119,951.70
DOKUMENTASI, GAMBAR, DLL hr/unit 50.00 Rp 532,500.00Rp 26,625,000.00 Rp 29,287,500.00
Rp - Rp 329,938,991.28
2 PEKERJAAN BETON PONDASI Rp -
PEKERJAAN BETON TIANG PANCANG bh 70.67 Rp 905,060.85 Rp 63,960,650.27 Rp 70,356,715.30
PEKERJAAN BETON PILECAP m3 5.00 Rp 709,427.78 Rp 3,547,138.90 Rp 3,901,852.79
Rp - Rp 74,258,568.09
PEKERJAAN PEMBESIAN Rp -
PEMBESIAN PILECAP m3 400.00 Rp 8,544.17 Rp 3,417,668.00 Rp 3,759,434.80
Rp 3,759,434.80
3 PEKERJAAN BETON LANTAI 1
BEKISTING TIE BEAM m3 234.16 Rp 109,144.33 Rp 25,556,691.37 Rp 28,112,360.51
1 BEKISTING BALOK m3 234.16 Rp 109,144.33 Rp 25,556,691.37 Rp 28,112,360.51
2 BEKISTING KOLOM m3 160.00 Rp 75,833.67 Rp 12,133,386.67 Rp 13,346,725.33
3 BEKISTING PELAT m3 34.46 Rp 341,800.00 Rp 11,776,924.08 Rp 12,954,616.49
4 Beton 1 : 2 : 3, BEAM 35/50 m3 31.28 Rp 709,427.78 Rp 22,191,787.67 Rp 24,410,966.44
5 Beton 1 : 2 : 3, BEAM 25/40 m3 5.85 Rp 709,427.78 Rp 4,150,152.50 Rp 4,565,167.75
6 Beton 1 : 2 : 3, BALOK 35/50 m3 31.28 Rp 709,427.78 Rp 22,191,787.67 Rp 24,410,966.44
7 Beton 1 : 2 : 3, BALOK 25/40 m3 5.85 Rp 709,427.78 Rp 4,150,152.50 Rp 4,565,167.75
8 BETON PELAT 120mm m3 34.46 Rp 1,569,740.00 Rp 54,086,333.54 Rp 59,494,966.90
9 KOLOM STRUKTUR 40X40 m3 80.00 Rp 153,210.61 Rp 12,256,848.58 Rp 13,482,533.44
10
Rp 213,455,831.56
4 PEKERJAAN PEMBESIAN LT 1
1 PEMBESIAN BEAM 350/500 m3 12,685.27 Rp 8,544.17 Rp 108,385,029.05 Rp 119,223,531.96
2 PEMBESIAN BEAM 250/400 m3 20.63 Rp 8,544.17 Rp 176,266.16 Rp 193,892.77
3 PEMBESIAN BALOK 350 X 500 m3 12,685.27 Rp 8,544.17 Rp 108,385,029.05 Rp 119,223,531.96
4 PEMBESIAN BALOK 250 X 400 m3 20.63 Rp 8,544.17 Rp 176,266.16 Rp 193,892.77
5 PEMBESIAN KOLOM STRUKTUR m3 1,145.78 Rp 18,739.70 Rp 21,471,573.47 Rp 23,618,730.81
6 Rp - Rp -
7 PEMBESIAN PLAT LANTAI m3 8,175.20 Rp 8,544.17 Rp 69,850,271.33 Rp 76,835,298.47
Rp 339,288,878.74
5 PEKERJAAN BETON LANTAI 2
1 BEKISTING BALOK m3 234.16 Rp 109,144.33 Rp 25,556,691.37 Rp 28,112,360.51
2 BEKISTING KOLOM m3 160.00 Rp 75,833.67 Rp 12,133,386.67 Rp 13,346,725.33
3 BEKISTING PELAT m3 34.46 Rp 341,800.00 Rp 11,776,924.08 Rp 12,954,616.49
4 Beton 1 : 2 : 3, BALOK 35/50 m3 31.28 Rp 709,427.78 Rp 22,191,787.67 Rp 24,410,966.44
5 Beton 1 : 2 : 3, BALOK 25/40 m3 5.85 Rp 709,427.78 Rp 4,150,152.50 Rp 4,565,167.75
8 BETON PELAT 120mm m3 34.46 Rp 1,569,740.00 Rp 54,086,333.54 Rp 59,494,966.90
6 KOLOM STRUKTUR 40X40 m3 53.76 Rp 153,210.61 Rp 8,236,602.25 Rp 9,060,262.47
7 m3 Rp - Rp - Rp -
Rp 151,945,065.89
6 PEKERJAAN PEMBESIAN LT 2
1 PEMBESIN BALOK 350 X 500 m3 12,685.27 Rp 8,544.17 Rp 108,385,029.05 Rp 119,223,531.96
2 PEMBESIN BALOK 250 X 400 m3 20.63 Rp 8,544.17 Rp 176,266.16 Rp 193,892.77
3 PEMBESIAN KOLOM STRUKTUR m3 1,145.78 Rp 18,739.70 Rp 21,471,573.47 Rp 23,618,730.81
4 m3 Rp - Rp - Rp -
5 PEMBESIAN PLAT LANTAI m3 8,175.20 Rp 8,544.17 Rp 69,850,271.33 Rp 76,835,298.47
Rp 219,871,454.01
8 PEKERJAAN PEMBESIAN LT 3
1 PEMBESIN BALOK 350 X 500 m3 12,685.27 Rp 8,544.17 Rp 108,385,029.05 Rp 119,223,531.96
2 PEMBESIN BALOK 250 X 400 m3 20.63 Rp 8,544.17 Rp 176,266.16 Rp 193,892.77
3 PEMBESIAN KOLOM STRUKTUR m3 1,145.78 Rp 18,739.70 Rp 21,471,573.47 Rp 23,618,730.81
4 m3 0.00 Rp - Rp - Rp -
22
NO MACAM PEKERJAAN SAT VOL. HARGA SAT. JML. HARGA JUMLAH TOTAL (+PPN 10%)
1 PEKERJAAN PERSIAPAN
5 PEMBESIAN PLAT LANTAI m3 8,846.45 Rp 8,544.17 Rp 75,585,543.21 Rp 83,144,097.53
Rp 226,180,253.07
23
NO MACAM PEKERJAAN JML. HARGA
1 PEKERJAAN PERISAPAN
MOBILITAS/JALAN SEMENTARA Rp 24,164,839.05
PENGUKURAN & PEMASANGAN BOWPLANK Rp 39,560,317.34
PEMBERSIHAN LAHAN Rp 5,171,688.72
PENGGALIAN TANAH Rp 22,154,390.28
PAGAR PROYEK Rp 20,078,919.43
GUDANG Rp 53,316,001.86
DIREKSI KEET Rp 129,085,382.91
SALURAN AIR BERSIH & KOTOR Rp 7,119,951.70
DOKUMENTASI, GAMBAR, DLL Rp 29,287,500.00
PEKERJAAN PEMBESIAN
PEKERJAAN PILECAP Rp 3,759,434.80
6 PEKERJAAN PEMBESIAN LT 2
1 PEMBESIAN BALOK 350 X 500 Rp 119,223,531.96
2 PEMBESIAN BALOK 250 X 400 Rp 193,892.77
3 PEMBESIAN KOLOM STRUKTUR Rp 23,618,730.81
5 PEMBESIAN PLAT LANTAI Rp 76,835,298.47
4.089 6 4.089
0.227 6 0.227
1.634 3
1.634 3
0.776 3
0.753 3
1.419 7
0.265 7
1.419 7
0.265 7
3.458 7
0.784 7
-
-
-
-
6.930 2
0.011 2
6.930 2
0.011 2
1.373 2
4.466 3
-
-
1.634 3
0.776 3
0.753 3
1.419 7
0.265 7
3.458 7
0.527 7
-
-
-
6.930 2
0.011 2
1.373 2
4.466 2
-
-
-
1.634 3
0.776 3
0.805 3
1.419 7
0.265 7
3.696 7
0.527 7
-
-
-
-
6.930 2
0.011 2
1.373 2
4.833 2
100
14.926 4.608 5.455
14.926 19.534 24.989
WAKTU PELAKSANAAN
N1 BULAN 2 BULAN 3
4 1 2 3 4 1 2 3
1.634
1.634
0.517 0.259
0.753
1.216 0.203
0.227 0.038
0.203 1.216
0.038 0.227
0.494 2.964
0.672 0.112
0.981 5.949
0.011
6.930
0.011
1.373
1.807 2.659
0.545 1.089
0.277 0.499
0.251 0.502
1.419
0.265
3.458
0.527
4.780 2.15
0.011
1.373
1.616 2.85
1.195 0.439
0.776
0.805
0.81079373
0.15162896
2.11214608
0.30093049
6.207 0.723
0.011
0.638 0.735
4.280 0.553
0.993
0.60809529
0.11372172
1.58410956
0.22569786
3.525 - - - -
109.935