PROJECT: NASUKOB CIP

LOCATION : BULALACAO, OR. MINDORO


STATION: 0+000 - 0+962 MC # 2

Wf = 1.79 m.
b = 1.30 m.
Lchb = 0.88 m.
tf = 0.17 m.
tb = 0.10 m.
Wb = 0.15 m.
f = 0.10 m.
L = 926 m.
tw = 0.30 m.

Achb = 1620.5 sq.m.

Vflooring = 327.16 cu.m.

; L/4 = 232 pcs


Vt&b = 35.90 cu.m.

STRUCTURE EXCAVATION = cu.m.

STRUCTURE BACKFILL = cu.m.


PROJECT: NASUKOB CIP
LOCATION : BULALACAO, OR. MINDORO
STATION: 0+000 - 0+962 MC # 2

Wf = 0.94 m.
b = 0.60 m.
Lchb = 0.43 m.
tf = 0.10 m.
tb = 0.10 m.
Wb = 0.12 m.
f = 0.05 m.
L = 480 m.
tw = 0.30 m.

Achb = 408 sq.m.

Vflooring = 53.28 cu.m.

; L/4 = 120 pcs


Vt&b = 13.68 cu.m.

STRUCTURE EXCAVATION = cu.m.

STRUCTURE BACKFILL = cu.m.


PROJECT: NASUKOB CIP
LOCATION : BULALACAO, OR. MINDORO
STATION: 0+000 - 0+962 MC # 2

Wf = 1.79 m.
b = 1.30 m.
Lchb = 0.88 m.
tf = 0.17 m.
tb = 0.10 m.
Wb = 0.15 m.
f = 0.10 m.
L = 926 m.
tw = 0.30 m.

Achb = 1620.5 sq.m.

Vflooring = 327.16 cu.m.

; L/4 = 232 pcs


Vt&b = 35.90 cu.m.

STRUCTURE EXCAVATION = cu.m.


STRUCTURE BACKFILL = cu.m.
PROJECT: NASUKOB CIP
(CHB LINING)
STATION EXCAVATION BACKFILL
FROM TO AREA 1 AREA 2 VOLUME AREA 1 AREA 2 VOLUME
0+000 MC 0+020 MC 0.28 0.56 8.40 2.52 1.02 35.40
0+020 MC 0+040 MC 0.56 0.54 11.00 1.02 1.02 20.40
0+040 MC 0+060 MC 0.54 1.13 16.70 1.02 1.02 20.40
36.10 76.20
0+060 MC 0+080 MC 1.13 1.04 21.70 1.02 0.66 16.80
0+080 MC 0+100 MC 1.04 1.04 20.80 0.66 0.66 13.20
0+100 MC 0+120 MC 1.04 1.04 20.80 0.66 0.66 13.20
0+120 MC 0+140 MC 1.04 1.96 30.00 0.66 0.66 13.20
0+140 MC 0+160 MC 1.96 0.90 28.60 0.66 0.66 13.20
0+160 MC 0+180 MC 0.90 0.81 17.10 0.66 0.66 13.20
0+180 MC 0+200 MC 0.81 0.81 16.20 0.66 0.66 13.20
0+200 MC 0+220 MC 0.81 0.81 16.20 0.66 0.66 13.20
0+220 MC 0+240 MC 0.81 0.81 16.20 0.66 0.66 13.20
0+240 MC 0+300 MC 0.18 0.18 10.80 1.18 1.18 70.65
0+300 MC 0+490 MC 0.00 0.00 0.00 1.18 1.18 129.53
198.40 322.58
0+000 MFD 0+020 MFD 0.29 0.81 11.00 0.54 0.50 10.40
0+020 MFD 0+040 MFD 0.81 0.81 16.20 0.50 0.50 10.00
0+040 MFD 0+060 MFD 0.81 0.81 16.20 0.50 0.50 10.00
0+060 MFD 0+080 MFD 0.81 0.92 17.30 0.50 0.50 10.00
0+080 MFD 0+100 MFD 0.92 0.92 18.40 0.50 0.50 10.00
0+100 MFD 0+120 MFD 0.92 0.92 18.40 0.50 0.50 10.00
0+120 MFD 0+140 MFD 0.92 0.92 18.40 0.50 0.50 10.00
0+140 MFD 0+160 MFD 0.92 0.92 18.40 0.50 0.50 10.00
0+160 MFD 0+180 MFD 0.92 0.92 18.40 0.50 0.50 10.00
0+180 MFD 0+200 MFD 0.92 0.92 18.40 0.50 0.50 10.00
0+200 MFD 0+220 MFD 0.92 0.92 18.40 0.50 0.50 10.00
0+220 MFD 0+240 MFD 0.92 0.92 18.40 0.50 0.50 10.00
0+240 MFD 0+363 MFD 0.24 0.24 55.44 1.04 1.04 127.92
263.34 248.32
TOTAL 497.84 647.10
PROJECT: NASUKOB CIP
LOCATION : BULALACAO, OR. MINDORO

SUMMARY:

AREA of CHB VOL of FLOORING VOL of T&B EXCAVATION BACKFILL


STATION
(sq.m.) (cu.m.) (cu.m.) (cu.m.) (cu.m.)
PROP 5" CHB LINING STA. 0+000 - 0+060 MC # 1 0.00 35.90 0.00 36.10 76.20
PROP 4" CHB LINING STA. 0+060 - 0+0490 MC # 1 Err:509 Err:509 Err:509 198.40 322.58
PROP 4" CHB LINING STA. 0+060 = 0+000 - 0+363 MFD # 1 Err:509 Err:509 Err:509 263.34 248.32
TOTAL Err:509 Err:509 Err:509 497.84 647.10