Baseco, MacTube
Baseco, MacTube
Baseco, MacTube
Problem
The location of reclamation of land was proposed near Pasig
River in Manila Bay for future housing development especially for
poor people living in the area.
The foundation consist of soft soil and the height of the embank-
ment is proposed to be 2m from the foundation level. The struc-
ture must also withstand the wave attack from Manila bay. Since
the perimeter of the proposed reclamation to big, an economical
and reliable structure is required .
Solution
Geotextile tube was proposed for this project because they are
commonly used for river bank/shoreline slope protection
against erosion due to its superior mechanical and physical
characteristic to perform filtration and drainage functions. The
installation of MacTube is cheaper and easier compared to
conventional method because in most cases the existing soil Excavation Date: April 2008
from the site can be used to fill the tube. MacTube are also
designed as river training and break water structures because
of its ability to absorb high incoming energy
Client name:
PHILIPPINE RECLAIMATION AUTHORITY
MacTex Installation Date: April 2008
Contractor name:
F.F CRUZ,. INC.
Consultant:
PHILIPPINE RECLAIMATION AUTHORITY
Product used:
MACTUBE MT15S - 1200 linear meter
MACTEX WR 12S - 16400m2
MACTEX MXC 90 - 7800m2
MACTEX MXC 110 - 3400m2
GABION - 950 numbers
Construction info
Construction Date : APRIL 2008
Completion Date : ON GOING MacTube Installation Date: April 2008
During Construction Date: April 2008
Completed Tube
Maccaferri Asia
Unit 511, Block G, Phileo Damansara 1, 46350 Petaling Jaya, Selangor, Malaysia
Tel : ( + 60 ) 3 7957 8330—Fax ( + 60 ) 3 7957 9080
E-mail: [email protected] - Web site: www.maccaferri.com