Civil BOQ For STP
Civil BOQ For STP
Civil BOQ For STP
The tender rates should include supply of all materials unless mentioned
otherwise including the cost of transportation, loading, unloading, stacking and
storing and all types of taxes etc. required for execution of work.
The tender rates shall hold good for all heights and at all levels including
multiple staging if required and nothing extra shall be paid on this account. All
the shop drawings & materials should be approved by client before
procurement & start of works.
Contractor to include in his rates provision of providing and fixing curtains of
polythene sheets or Hessian cloth to prevent movement of dust as directed.
Contractor shall dispose / remove all rubbish etc. from the working site and
from the hotel, including loading into truck, cleaning well the site in all respect.
Contractor shall also stack all the serviceable materials from the dismantling
items at suitable place as directed etc all complete & as directed by the
Engineer at site. All the rates are inclusive of works to be done at all heights,
leads, lifts, including scaffolding, curing etc. No extra money shall be paid
beyond these rates.
2.0 Supplying and filling in plinth with murrum under floors including, watering,
ramming consolidating and dressing complete. CUM 20 1,012.00
SQM 256
6.0 SHUTTERING
6 Unless and otherwise specified Providing and removing formworks with 12mm
thick plywood with necessary wooden frame work, bolts, nuts,etc with
necessary supports including, chemical releasing agent to avoid sticking of
cement on the plywood to have form finish which does not require any further
finishing work to be carried out at all heights,levels to cast the member of any
shape,size and thickness including, propping,scaffolding etc.complete and
removal of form ,for:
6.1 Providing and removing shuttering for Foundations, Footings,raft and machine
foundations with ms sheet / wooden planks and wooden runners with
necessary bolts, nuts and sides props etc. SQM 72
6.2 RCC WALL SQM 1000
6.3 Slab/Beam SQM 125
KG 28000 92.20
BOQ for proposed Sewage Treatment Plant (STP, 250 KLD) at "Hotel The Lalit Srinagar
Notes 1. Rates have been worked out/analysed viz a viz to prevailing market rates and inclusive of 14.05%
GST & 15% contractors profit
2. All arrangements for allowing the material to carry to site of work from district administration shall
be the responsibility of clint
nagar
AMOUNT
97,240.00
18,640.00
20,240.00
153,387.50
nagar
AMOUNT
869,443.20
1,937,880.00
230,053.50
-
-
-
2,581,600.00
nagar
AMOUNT
69,918.75
38,837.50
138,924.00
239,031.00
291,996.25
750,847.50
92,100.00
22,050.00
-
-
17,761.50
nagar
AMOUNT
495,000.00
13,500.00