Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
158 views
12 pages
Hydrology Questions Sheet - Rinchtar Classes
gfdcxhv
Uploaded by
Tarun
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save Hydrology Questions Sheet_rinchtar Classes For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
158 views
12 pages
Hydrology Questions Sheet - Rinchtar Classes
gfdcxhv
Uploaded by
Tarun
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save Hydrology Questions Sheet_rinchtar Classes For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save Hydrology Questions Sheet_rinchtar Classes For Later
You are on page 1
/ 12
Search
Fullscreen
y) 2) 3) 4) 5) 6) ” 8) What is the chemical symbol for ICE as per UNESCO terminology a) HiOs ©) HeOs b) 0 4) HO What is hydrological cycle a) Process involved in the transfer of moisture from sea to land b) Process involved in the transfer of moisture from sea back to sea again ©) Process involved in the transfer of water from snowmelt in mountains to sea d) Process involved in the transfer of moisture from sea to land and back to sea again Humidity is measured by a) Hygrometer ©) Hydrometer b) Hyetometer d) Pyrheliometer A precipitation in the form of water droplets of size less than 0.5 mm and intensity less than 1 mm/h is known as a) Rain ©) Small rain b) sleet d) drizzle When the density of snowfall is not known it is usual to assume that water equivalent to snowfall as a) 10% b) 30% ©) 50% d) 90% ‘The average annual rainfall over the whole of India is estimated as a) 86 cm b) 119 em ©) 203 em d) 160 cm ‘The monthly rainfall at a place M during August, 1985 was noted as 65 mm below normal. Here the term normal means a) Rainfall in the same month August in the previous year b) The average monthly rainfall of august computed from a specific 30 years of past record ©) The average monthly rainfall computed from the previous 12 months of records d) The rainfall that is normally expected, based ‘on the data from the beginning of that water year A metrological division in India is said to experience severe drought, if the seasonal rainfall deficiency from the normal rainfall is 9) The normal annual rainfall at station A, B and C are 170.6, 180.3 and 165.3 cm respectively. In 1985, station 8 was inoperative and station A ‘and C recorded annual precipitation of 153.0 and 4145.1 cm respectively. The annual rainfall at in that year could be estimated as a) 160 cm b) 180 em ©) 108.7 cm 4) 149.1 cm 10) According to India, metrological department, a year is considered a drought year in case the total area affected by metrological drought in the ‘country is more than a) 20 % of the total area of the country b) 50 % of the total area of the country c)_ 75% of the total area of the country d) 10 % of the total area of the country 11)An area Is classified as a drought prone area, if the probability P of occurrence of a drought is a) 04
25 % value is 10 %. ©) > 75% d) > 90 % a) 2 bya ) 6 as AIHYDROLOGY LeveL o RINCHTAR CLASSES M: +91787755448816) Which of the following statements are incorrect 1. Records of tipping bucket raingauge give intensity of rainfall 2. Records of weighing bucket type raingauge give mass curve 3. Records of natural siphon type give mass a) tonly b) 2 only ©) 3only d) none of the above 17) Which of the following were not matched correctly ‘) Double mass curve ~ consistency method b) Moving average method - trend ©) DAD curve - average depth of rainfall d) Non recording gauge - symon's gauge 18) In the hydrological cycle, the average residence time of water in the global a) Atmospheric moisture is larger than that in the global rivers b) Oceans is smaller than that of the global groundwater ©) Rivers is larger than that of the global groundwater d) Oceans is larger than that of the global groundwater 19)The monthly rainfall at a place A during September 1982 was recorded as 55 mm above normal here, the term normal means a) The rainfall in the same month in the previous year b) The rainfall normally expected based on previous year ©). The average rainfall computed from past 12 months record d) The average monthly rainfall for September computed from a specific 30 years of past record 20) The % standard error of precipitation average is, often expressed functionally or graphically in terms of (i) precipitating gauge network density expressed as area per gauge and (ii) total area of the catchment. The % standard error a) Increases with area per gauge as well as total area b) Decreases with area per gauge as well as total area ©) Increases with area per gauge but decreases with total area d) Decreases with area per gauge but increases with total area 2IHYOROLOGY_LEV 21)Match list 1 (hydrology terms) with list 2 (relationship/nature of curve) List 1 List 2 P. theissen | 1. average depth of polygon rainfall over an area Q. mass curve | 2. relationship of rainfall intensity and time BR hyetograph 3. relationship of accumulated rainfall & time S.DAD curve | 4. relationship of river runoff & time 5. always a falling curve 22) The rainfall hyetograph data is given below Duration | 30 60 30 (min) Rainfall | 2 4 6 intensity mm/hr Total amount of rainfall represented by hyetograph Is a) 12mm by 8mm <) 5mm 4) 6mm 23) How is the average velocity along the vertical in a wide stream obtained ? 8) By averaging the velocities at 0.2 and 0.8 depth from surface b) By measuring the velocities at 0.6 depth below the surface )_ By measuring velocities at half the depth d) By measuring velocities at 0.1 times the depth from surface 24) Mean precipitation over an area is best obtained 25)The moving average of annual precipi from gauged amounts by a) Arithmetic mean method b) Theisen method c)_Linearly interpolation isohyetal method 4) Orographically weighed isoheytal method tion. record Is carried out to determine a) Trend b) Annual mean ) Extreme annual variation d) Extreme seasonal variation o RINCHTAR CLASSES M: +9178775S44e826) Which one of the following defines the aridity index a) a=" x 100 b) a=" x100 ©) = x10 d) Al x 100 27) For which of the following purposes is the double mass curve is used? a) Checking the consistency of precipitation data b) Prediction of annual Precipitation ©) Defining which period of storm should be analysed to obtain the maximum useful Information from storm rainfall d) For estimating the capacity of a reservoir 28)Which one of the following is a method of extending the length of record for a frequency curve at a station? a) Double mass curve method b) The station year method ©) Thiessen method d) Ischyetal method 29) Consider the following with respect to ‘double ~ mass ~ curve’: 1. Plot of accumulated rainfall with respect to two chronological orders 2. Plot for estimating multiple missing rainfall data 3. Plot for checking the consistency of the rainfall data 4. Plot for accumulated annual rainfall of a station v/s accumulated rainfall of a group of. stations Which of these statements are correct? a) 183 by283 o) 384 d)184 30) Consider the following statements 1. Over the oceans there is more evaporation than precipitation 2. On land it is more precipitation than evapo- transpiration. Which of these statements are correct a) Both i and 2 b) neither 1 nor 2 ©) tonly 4) 2 only 31) A hyetograph is a graph representing a) Rainfall volume with time b) Rainfall intensity with time ©) Rainfall volume with duration 4d) Rainfall intensity over an area a|HYDROLOGY_LE\ 32)In the case of large rivers, a number of ‘equidistance vertical sections of the total width of flow are identified, for the purpose of finding by numerical integration, the total discharge on any day. On each section, the mean velocity is taken as the arithmetic average of two typical depths on that section, Then the mean velocity is worked out for that section. Usually, the mean velocity of any section, corresponding to which oO RINCHTAR CLASSES Mi +9 one of the following a) Sua eat tu by Hose You ) fase Pose 33) Which of the following are the pertinent to the realization of hydrological cycle? 1. Latitude difference in solar heating of the earth surface 2. Inclination of the earth's axis 3. Uneven distribution of land & water 4. Coriolis effect a) 1,2.&3 only b) 1, 2&4 only ©) 2,384 only 4) 1, 2,3 & 4 only 34) ind the missing rainfall data [ mm] Raingauge | Normal (mm) | Actual (mm) A 645 945 B ais 762 c 981 915 x 830 2 35)The intensity of rainfall and time interval of the typical storm are: Time intervals | Intensity of rainfall (minutes) (mm/min) 0-10 07 10-20 at 20-30 2.2 30-40 15 40-50 1.2 50-60 28 60-70 1.9 70-80 0.4 The maximum minutes duration of the storm mm/min. 36) The following rainfall data refers to station A and B which are equidistance from station X. Find P. intensity of rainfall for 20 L mm) Station | Station | Station A x B Tong term normal annual |240 | 250 | 260 rainfall (in mm) Annual rainfall in mm for year |230 | P 190 1940 7877554488
You might also like
Share EXCEL SHEET FOR CBR TEST
PDF
100% (1)
Share EXCEL SHEET FOR CBR TEST
1 page
Homework No 7 - Solution
PDF
No ratings yet
Homework No 7 - Solution
8 pages
Bharat Nirman: Cost Estimate For The Construction of Retaining Wall (3mtr. HT.) For10mtr Length
PDF
100% (1)
Bharat Nirman: Cost Estimate For The Construction of Retaining Wall (3mtr. HT.) For10mtr Length
27 pages
Proforma - C Pradhan Mantri Gram Sadak Yojana (PMGSY) Check List For P.I.U. & S.T.A (For Individual Road Works)
PDF
100% (1)
Proforma - C Pradhan Mantri Gram Sadak Yojana (PMGSY) Check List For P.I.U. & S.T.A (For Individual Road Works)
62 pages
Hydrology Questions-Set 1 (With Answers)
PDF
100% (1)
Hydrology Questions-Set 1 (With Answers)
12 pages
Applied Hydrology Assignment II Solution Prepared by Lemita Beriha Urto
PDF
No ratings yet
Applied Hydrology Assignment II Solution Prepared by Lemita Beriha Urto
16 pages
QUIZ
PDF
No ratings yet
QUIZ
7 pages
Assignment - One-On Introduction To Hydrology&Hydrometry
PDF
No ratings yet
Assignment - One-On Introduction To Hydrology&Hydrometry
4 pages
Objective Questions (31 To 45) : Environmental Engineering
PDF
No ratings yet
Objective Questions (31 To 45) : Environmental Engineering
34 pages
Presentation On Determination of Water Potential of The Legedadi Catchment
PDF
No ratings yet
Presentation On Determination of Water Potential of The Legedadi Catchment
25 pages
CH 3 2
PDF
No ratings yet
CH 3 2
30 pages
Temam Mohammed HS 2
PDF
No ratings yet
Temam Mohammed HS 2
16 pages
ASSIGNMENT
PDF
No ratings yet
ASSIGNMENT
6 pages
Chapter Five: Flood Routing
PDF
No ratings yet
Chapter Five: Flood Routing
46 pages
Ch4 Streamflow Measurement
PDF
No ratings yet
Ch4 Streamflow Measurement
22 pages
Design Procedure For Sanitary Sewers: Sewerage and Urban Drainage System
PDF
No ratings yet
Design Procedure For Sanitary Sewers: Sewerage and Urban Drainage System
5 pages
Multiple Choice & Fill in The Blancks
PDF
No ratings yet
Multiple Choice & Fill in The Blancks
7 pages
Estimation of Missing Data
PDF
No ratings yet
Estimation of Missing Data
12 pages
2014 Open Channel Final Exam
PDF
No ratings yet
2014 Open Channel Final Exam
2 pages
Wollo University: Department of Civil Engineering
PDF
No ratings yet
Wollo University: Department of Civil Engineering
20 pages
Asgn Water Budget
PDF
No ratings yet
Asgn Water Budget
1 page
Design of A Looped Network Using Watercad/Watergems Individual Assignment For Jigjiga Students
PDF
No ratings yet
Design of A Looped Network Using Watercad/Watergems Individual Assignment For Jigjiga Students
2 pages
Final Exam
PDF
No ratings yet
Final Exam
2 pages
Mekelle Uninversity Ethiopian Instituite of Techonology - Mekelle School of Civil Enginering
PDF
No ratings yet
Mekelle Uninversity Ethiopian Instituite of Techonology - Mekelle School of Civil Enginering
39 pages
Haramaya Institute of Technology: School of Water Resource and Environmental Engineering
PDF
No ratings yet
Haramaya Institute of Technology: School of Water Resource and Environmental Engineering
94 pages
Design Examples of RC Beam For Shear
PDF
No ratings yet
Design Examples of RC Beam For Shear
15 pages
Assignment1-ESM 2024
PDF
No ratings yet
Assignment1-ESM 2024
1 page
Slab 1: Two - Way Slab (Case 2 - Four Edges Continuous)
PDF
No ratings yet
Slab 1: Two - Way Slab (Case 2 - Four Edges Continuous)
58 pages
Water Treatment Assignment
PDF
100% (1)
Water Treatment Assignment
3 pages
Ws Assignment 1
PDF
100% (3)
Ws Assignment 1
2 pages
Ceng 3601-Mid Exam
PDF
100% (3)
Ceng 3601-Mid Exam
2 pages
Lesson 1 Hydrology Introduction 2 2010
PDF
No ratings yet
Lesson 1 Hydrology Introduction 2 2010
25 pages
Spec Sample Exam
PDF
No ratings yet
Spec Sample Exam
10 pages
Ge - 1 MCQ
PDF
No ratings yet
Ge - 1 MCQ
20 pages
Chapter-4 Sewarage System
PDF
No ratings yet
Chapter-4 Sewarage System
65 pages
WRPM 1
PDF
No ratings yet
WRPM 1
30 pages
Chapter 2
PDF
No ratings yet
Chapter 2
35 pages
University of Gondar Institute of Technology Sewage Treatment and Disposal Assignment For 3 Year Cotm Max. of 5 Students Per Group
PDF
100% (1)
University of Gondar Institute of Technology Sewage Treatment and Disposal Assignment For 3 Year Cotm Max. of 5 Students Per Group
2 pages
Eng Cabdi Xusen
PDF
No ratings yet
Eng Cabdi Xusen
39 pages
Geotechnical Engineering
PDF
No ratings yet
Geotechnical Engineering
66 pages
Water Balance Presentation
PDF
No ratings yet
Water Balance Presentation
64 pages
Example On Seepage Analysis by Khola's Metod#t4
PDF
100% (1)
Example On Seepage Analysis by Khola's Metod#t4
5 pages
CE 410 Final Exam (Hydrology) PDF
PDF
0% (1)
CE 410 Final Exam (Hydrology) PDF
2 pages
Lecturenote - 1219301080chapter 2 Embankment Dam-1
PDF
No ratings yet
Lecturenote - 1219301080chapter 2 Embankment Dam-1
36 pages
Gilgel Gibe II HP
PDF
No ratings yet
Gilgel Gibe II HP
117 pages
Abe 211
PDF
No ratings yet
Abe 211
10 pages
Water Resources Engineer, Hydraulic Engineer, Civil Engineer
PDF
No ratings yet
Water Resources Engineer, Hydraulic Engineer, Civil Engineer
2 pages
Suggestion - CE (PC) 505 - Environental Engineering - 2023
PDF
No ratings yet
Suggestion - CE (PC) 505 - Environental Engineering - 2023
5 pages
Chapter 6
PDF
No ratings yet
Chapter 6
26 pages
Methods of Base-Flow Separation
PDF
No ratings yet
Methods of Base-Flow Separation
30 pages
Summarizing Data - Statistical Hydrology
PDF
100% (1)
Summarizing Data - Statistical Hydrology
6 pages
Hydraulics Lab Objective Question
PDF
0% (1)
Hydraulics Lab Objective Question
2 pages
Course Outline: CHAPTER ONE (0.5 Week)
PDF
No ratings yet
Course Outline: CHAPTER ONE (0.5 Week)
4 pages
Chap 3 - 1 Irrigation Distribution Network
PDF
No ratings yet
Chap 3 - 1 Irrigation Distribution Network
48 pages
Cve172008 Hydrology
PDF
No ratings yet
Cve172008 Hydrology
75 pages
P N Modi Irrigation
PDF
No ratings yet
P N Modi Irrigation
24 pages
Republic of The Philippines Batangas State University: Hydrology
PDF
100% (1)
Republic of The Philippines Batangas State University: Hydrology
2 pages
10CV65 - Hydraulic Structures and Irrigation Design - Drawing Question Bank
PDF
No ratings yet
10CV65 - Hydraulic Structures and Irrigation Design - Drawing Question Bank
6 pages
1 Precipitation
PDF
No ratings yet
1 Precipitation
10 pages
Wa0001.
PDF
No ratings yet
Wa0001.
26 pages
Hydrology Test
PDF
No ratings yet
Hydrology Test
5 pages
Passenger Car Units (PCU) Analysis: Name of Road: Length: 6.5 KM
PDF
No ratings yet
Passenger Car Units (PCU) Analysis: Name of Road: Length: 6.5 KM
3 pages
Surveying by Tarun SiR @CivilPur
PDF
No ratings yet
Surveying by Tarun SiR @CivilPur
68 pages
DPR Word Varikhad
PDF
No ratings yet
DPR Word Varikhad
62 pages
Fluid Mechanics: Mass 4 P D 2 P D 8 P D 4 Cos H WD
PDF
No ratings yet
Fluid Mechanics: Mass 4 P D 2 P D 8 P D 4 Cos H WD
16 pages
Design of Flexible Pavement: (I.e AADT in The Year of Opening)
PDF
No ratings yet
Design of Flexible Pavement: (I.e AADT in The Year of Opening)
2 pages
Economics: AS ON 15-11-2010
PDF
No ratings yet
Economics: AS ON 15-11-2010
52 pages
Dual Carriageway Roads 4 Lane Carriageway: Click On The Type of Pavement
PDF
No ratings yet
Dual Carriageway Roads 4 Lane Carriageway: Click On The Type of Pavement
18 pages
Estimation by Long Wall Short Wall Method PDF
PDF
100% (1)
Estimation by Long Wall Short Wall Method PDF
2 pages
Soil ESE Notej
PDF
80% (5)
Soil ESE Notej
34 pages
Specification Forvv
PDF
No ratings yet
Specification Forvv
3 pages
Superelevation Complete Final3
PDF
No ratings yet
Superelevation Complete Final3
1 page
Estimation of Residential Building PDF
PDF
No ratings yet
Estimation of Residential Building PDF
2 pages
Format F-9A Pradhan Mantri Gram Sadak Yojana (Pmgsy) Certificate of Ground Verification From Executive Engineer/Head Piu
PDF
No ratings yet
Format F-9A Pradhan Mantri Gram Sadak Yojana (Pmgsy) Certificate of Ground Verification From Executive Engineer/Head Piu
1 page
Earthwork Chart For Preparation of Road From Kalna To Flail KM - 1St RD 0 - 1000
PDF
No ratings yet
Earthwork Chart For Preparation of Road From Kalna To Flail KM - 1St RD 0 - 1000
2 pages
Earthwork in Filling & Cutting: RD Sectional Area Total Area Mean Area L (M)
PDF
No ratings yet
Earthwork in Filling & Cutting: RD Sectional Area Total Area Mean Area L (M)
28 pages
R Classe
PDF
No ratings yet
R Classe
19 pages
Pradhan Mantri Gram Sadak Yojana (Pmgsy) Summary Sheet: Annexure-7.1 Format F-1 (See para 7.2
PDF
No ratings yet
Pradhan Mantri Gram Sadak Yojana (Pmgsy) Summary Sheet: Annexure-7.1 Format F-1 (See para 7.2
10 pages
Sl. No. KM Chainage Type of Protective Works Comments LHS RHS
PDF
No ratings yet
Sl. No. KM Chainage Type of Protective Works Comments LHS RHS
6 pages
Estimates SARNA TO MOHARGARH
PDF
100% (1)
Estimates SARNA TO MOHARGARH
40 pages
Jogwan Nelli Nallah Bridge
PDF
No ratings yet
Jogwan Nelli Nallah Bridge
3 pages
Kathen Excel
PDF
No ratings yet
Kathen Excel
10 pages
Kathen Excel
PDF
No ratings yet
Kathen Excel
10 pages