Section 1 - Management Responsibility & Quality Planning
To ensure readily available expertise, there shall
be a dedicated and qualified heat treat person on
site. This individual shall be a full-time employee Mr.Karuppaiya having 7+ years
and the position shall be reflected in the combination of metallurgical education
organization chart. A job description shall exist and heat treatment experience.
Is there a dedicated and
identifying the qualifications for the position Mr.Sanjay having 9+ years experience in
1.1 qualified heat treat person on- x
including metallurgical and heat treat knowledge. heat treatment process.
site?
The qualifications shall include a minimum of 5 Doc.No : LVH-F/SKM/02
years experience in heat treat operations or a Org. chart to be updated for Mr.
combination of a minimum of 5 years of formal Karruppaiya.
metallurgical education and heat treat
experience.
1
Special Process: Heat Treat System Assessment
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
Questio Needs
Not LVH
n Question Requirements and Guidance Objective Evidence N/A Satisfactory Immediate Responsible Due Date
Satisfactory Actions
Number Action
Section 1 - Management Responsibility & Quality Planning
The organization shall incorporate the use of a
documented Control Plan procedure and ensure
the Control Plans are updated to reflect current
controls.
The Control Plans shall be written for each part or
part family or they may be process-specific and
written for each process. In any case, they shall
address all process steps from part receipt to part
shipment and identify all equipment used and all
key heat treat process parameters as defined by
the organization.
Are heat treat process control
A cross-functional team, including a production Updated CP is available in AIAG format
1.4 plans up to date and x
operator, shall be used in the development of MSR/CP/SPRL/01(Model-3222)
reflecting current processing?
Control Plans, which shall be consistent with all
associated documentation such as work
instructions, shop travelers, and FMEA's. All
special characteristics, as defined by the
organization and its customers, shall be
identified, defined, and addressed in the Control
Plans. Sample sizes and frequencies for
evaluation of process and product characteristics
shall also be addressed consistent with the
minimum requirements listed in the Process
Tables, Sections 3.0 and 4.0.
2
Special Process: Heat Treat System Assessment
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
Questio Needs
Not LVH
n Question Requirements and Guidance Objective Evidence N/A Satisfactory Immediate Responsible Due Date
Satisfactory Actions
Number Action
Section 1 - Management Responsibility & Quality Planning
The heat treater shall have written process
specifications for all active processes and identify
all steps of the process including relevant
operating parameters. Examples of operating
parameters include process temperatures, cycle
times, load rates, atmosphere or gas flow
Process Specifications Sheet having
settings, belt speeds, quench agitation speeds,
Is there a written process process parameters mentioned are
etc. Such parameters shall not only be defined,
1.6 specification for all active available and displayed. WI also x
they shall have operating tolerances as defined
processes? available.
by the organization in order to maintain process
LVH-F/QA-PPS-VHF-03
control.
All active processes should have a written
process specification.
These process specifications may take the form
of work instructions, job card, computer-based
recipes, or other similar documents.
3
Special Process: Heat Treat System Assessment
Assessment
Questio CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Needs
Not LVH
n Question Requirements and Guidance Objective Evidence N/A Satisfactory Immediate Responsible Due Date
Satisfactory Actions
Number Action
Section 1 - Management Responsibility & Quality Planning
Management shall review the furnace monitoring
systems at intervals not to exceed 24 hours. The
heat treat monitoring system includes but is not
limited to temperature strip charts, atmosphere
Is management reviewing the Daily auditing is in Practice for heat
strip charts, computer data logs, furnace and
heat treat monitoring system treatment. Process Details are verified &
1.9 operator logs, etc. x
every 24 hours? recorded daily by CQI-09 champion.(L-VH-
The management review shall include efforts to
F/DA).
detect out-of-control conditions or alarm
conditions. The process of reviewing the furnace
data shall be documented and this requirement
also applies to computerized data.
Assessment
Questio Needs
Not LVH
n Question Requirements and Guidance Objective Evidence N/A Satisfactory Immediate Responsible Due Date
Satisfactory Actions
Number Action
Section 1 - Management Responsibility & material
Yes, Qurantine Quality Planning
disposition
Does the Quality Manager or
The Quality Manager is responsible for decisions are taken by Quality manager.
designee authorize the
1.14 authorizing and documenting appropriate WI also displayed.Register also x
disposition of material from
personnel to disposition quarantine material. mainatained.
quarantine status?
LVH-P/WI-QMH.
5
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
Questio Needs
Not LVH
n Question Requirements and Guidance Objective Evidence N/A Satisfactory Immediate Responsible Due Date
Satisfactory Actions
Number Action
Section 1 - Management Responsibility & Quality Planning
The organization shall maintain a responsibility
matrix identifying all key management and
Is there a responsibility matrix
supervisory functions and the qualified personnel
to ensure that all key
who may perform such functions. It shall identify Skill matrix chart avaialble(LVHF/SKM-
1.17 management and supervisory x
both primary and secondary (backup) personnel 02).Skill matrix not updated after Aug.
functions are performed by
for the key functions (as defined by the 2017.
qualified personnel?
organization). This matrix shall be readily
available to management at all times.
6
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
Questio Needs
Not LVH
n Question Requirements and Guidance Objective Evidence N/A Satisfactory Immediate Responsible Due Date
Satisfactory Actions
Number Action
Has the Heat Treater Section 1 - Management Responsibility & Quality Planning
The heat treater shall develop and maintain a
developed a critical spare Updated Critical spare parts list is
critical spare parts list and shall ensure the
1.19 part list and are the parts available for VHF-03.(LVHF/MTN- x
availability of such parts to minimize production
available to minimize SL)Updated on 11.07.2018.
disruptions.
production disruptions?
Is material from different steel Different steel mill heats or metals which require
mill heats or metals which different heat treat parameters, such as but not
Only Ford Engine valves are processed
may preclude achieving the limited to, austentizing, quenching, or tempering
1.20 with all the provided specifications as per x
specified metallurgical times and/or temperatures shall be processed
customer.
properties prevented from separately in order to achieve specified
being processed together? metallurgical properties.
7
Special Process: Heat Treat System Assessment
Assessment
Questio Needs
CQI-9Special Not System LVH
n Question Requirements and Guidance Objective Evidence N/A SatisfactoryProcess: Heat Treat
Immediate Assessment Version 3,
Responsible DueIssue 10/11
Date
Satisfactory Actions
Number Action
Section 1 -2Management
Section Responsibility
- Floor and Material & Quality
Handling Planning
Responsibility
It is critical that all customer requirements and lot
identification be adequately transferred to internal
heat treat documents. The facility shall ensure
that the data entered in the receiving system
match the information on the customer's shipping
documents. Documented processes and
Does the facility ensure that evidence of compliance shall exist, e.g., shop
Data Route card entered is same of
the data entered in the travelers, work orders, etc. Sometimes the
Dispatch and verified by Test Certificate
2.1 receiving system matches the material received does not precisely correspond x
to internal records such as incoming
information on the customer's to customer shipping documents. The facility
register, invoice etc. and found OK.
shipping documents? shall have a detailed process in place to resolve
receiving discrepancies.
The requirements stated above also apply to
captive heat treat departments. This process
refers to receiving and shipping the parts in and
out of the heat treat department.
9
Special Process: Heat Treat System Assessment
Assessment
Questio Needs
CQI-9Special Not System LVH
n Question Requirements and Guidance Objective Evidence N/A SatisfactoryProcess: Heat Treat
Immediate Assessment Version 3,
Responsible DueIssue 10/11
Date
Satisfactory Actions
Number Action
Section 1 - Management Responsibility & Quality Planning
Many heat-treated parts are subjected to surface
finish or appearance operations such as plating
or coating after heat treatment. Parts shall be
free from contaminants that are detrimental to
subsequent processes or the product. Pre-wash
(if applicable) and post-wash parameters shall be
monitored and documented. Oils and other
contaminants or residues can be difficult to
Are parts free from
remove once subjected to the heat treatment
contaminants that would be Proper handling is taken for
2.11 process. Review the chemical supplier’s x
detrimental to the heat materials.(MSR/CP/SPRL/01)
recommendation for cleaning the system. Parts
treatment of the product?
shall be free of rust, burrs, chips, detrimental
amounts of drawing compound, cutting fluids, rust
preventing oils, lubricants, etc., prior to heat treat.
Note: Refer to the appropriate heat treater's
requirements and specifications to determine
acceptability. Refer to Process Table, Section
5.0, for frequency of checking washer solutions.
Are In-Process / Final Test In-Process / Final Test Frequencies shall be Frequency of sampling is mentioned in
2.15 Frequencies performed as performed as specified in Process Tables. Refer CP,WI and are same mentioned in Test x
specified in Process Tables? to Process Tables, Section 4.0. Certificate(LVH/F/TC). 10
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
Questio Needs
Not LVH
n Question Requirements and Guidance Objective Evidence N/A Satisfactory Immediate Responsible Due Date
Satisfactory Actions
Number Action
Section
Product test 1 -shall
equipment Management
be verified. TestResponsibility & Quality Planning
equipment shall be verified/calibrated per
applicable customer-specific standard or per an Daily Hardness checklist on Hardness
applicable consensus standard such as those Tester(LVH/QA/F-03) for hardness is
Is product test equipment
2.16 published by ASTM, DIN, EN, ISO, JIS, NIST, available on site with standard test block x
verified?
SAE etc. Verification/calibration results shall be (NABL) and calibration is done
internally reviewed, approved, and documented. periodically.
Refer to Process Tables, Section 1.0, for
frequency of checks.
11
Special Process: Heat Treat System Assessment
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Assessment
Questio Needs
Not LVH
n Question Requirements and Guidance Objective Evidence N/A Satisfactory Immediate Responsible Due Date
Satisfactory Actions
Number Action
Section 1 - Management
SectionResponsibility
3 - Equipment& Quality Planning
The heat-treat equipment including furnaces,
generators, and quench systems shall have
proper process controls and related equipment. Furnace is equipped with temperature
Do furnaces, generators, and
Examples include temperature, carbon controller,over temperature controller
3.1 quench systems have proper x
potential/dew point, gas flows, quench monitoring vacuum gauges, pressure gauges, PLC
process control equipment?
system including agitation, temperature control, etc.
etc. as listed in the applicable Process Tables,
Section 1.0.
The calibration and certification of the process All calibrated certificates are available on
Are process equipment equipment shall be checked at regular specified site.Verified for Temp. controller(ID No.-
3.2 calibrations and/or verification intervals. Refer to the applicable Process Tables, IN13714-001-046-04) and found x
certified, posted, and current? Sections 1.0 and 2.0, for equipment calibration or calibrated done on 17.06.2018 due on
certification time tables. 16.12.2018 for VHF-03.
12
Special Process: Heat Treat System Assessment
13
Special Process: Heat Treat System Assessment
Assessment
CQI-9Special Process: Heat Treat System Assessment Version 3, Issue 10/11
Questio Needs
Not LVH
n Question Requirements and Guidance Objective Evidence N/A Satisfactory Immediate Responsible Due Date
Satisfactory Actions
Number Action
Section
One of these fail-safe1methods
- Management
shall be used Responsibility
to & Quality Planning
prevent ammonia to leak into the furnace:
• A quick disconnect or physical separation of the
lines
• Three-valve ammonia "fail-safe" vent system is
Are all ammonia lines permitted. See the definition “Three Valve Fail-
equipped with a fail-safe Safe Vent” and diagram in the glossary.
3.9 Not applicable x
method to prevent ammonia • 1 manual and 2 electrical magnetic valves in
leaks into the furnace? series
Assessment
Questio Needs
Not LVH
n Question Requirements and Guidance Objective Evidence N/A Satisfactory Immediate Responsible Due Date
Satisfactory Actions
Number Action
15