closing. Quality control, working schedule, control management system and risk
management.
I. Preliminaries
This comprises the initiating processes such as the nature and scope of the
project which includes the planning, feasibility study, basis of design stage, and
A. Planning Stage
The planning stage will include the identification of the phases, activities,
and tasks needed to refine crude oil into more useful products. All key project
allocated for the construction and operation and the project commission.
describes the technical approach planned for the project as well to design
parameters that will be used. Basis of design stage ensures that the project
90
C. Design Layout Stage
Specification of the product, operating factors, material and energy balance are
going to be considered.
having civil works, mechanical works, electrical works and making a site
development.
This stage includes the final piece of the actual construction. Contractors
and subcontractor plans are final, working schedule is done, materials and tools
are at their designated place, and instructions are given to all of the personnel of
the plant. All matters needed in the execution of the plant are all considered and
This stage includes the result of the final project. It is at this stage that the
project becomes actual on the area planned and visible to the public. The
Equipment and materials that will be use during the construction will all be
monitored so that the site will be ready as soon as possible and no time being
wasted for unnecessary mistake. The expected time for the construction to be
91
III. Quality Assurance and Control
Products made from crude oil are vastly used in our daily living and plays
an important role to give the community its daily necessities. In order to do so, in
Quality Assurance and control program has no other goal than to return
(PD1686), Clean Air Act (Ra 8749), Clean Water Act (RA 9275), Ecological Solid
Waste Management Act (RA 9003) and Toxic, Hazardous and Nuclear Waste
Act (RA 6969), the consumers (include the residential area), are assured that no
Quality Assurance
92
whose sole function is to manage and improve the process. The Quality Manager
is responsible for development of the facility quality manual which defines roles
Quality Control
confirm that laboratory analyses are reliable, and verify that the reported results
are suitable to support decisions, and measure and document of any uncertainty
Assurance Plan while each laboratory should have a written Quality Control Plan.
procedures, process and product specification and planned details for process
assessment. The Quality Control plan should detail the process for generating
1. Certificate of Analysis
3. Batch Description
4. Shipment Information
93
A. Commissioning and Dry-run Stage
B. Operation Stage
V. Risk Management
Action Plan
Summary of Findings
follows:
1. The proposed Oil Refinery plant will be located at Sumira, Camarines Sur in
Bicol Region. It is expected that the demand for diesel, gasoline, LPG and other
petroleum by-products such as naphtha, kerosene and related jet aircraft fuels,
fuel oils, lubricating oil, paraffin wax, asphalt and tar, petroleum coke, sulfur,
olefins, plastics, will continue to keep up with the country’s growing polymer
industry.
Conclusions
mentioned above.
target customers and target location is important since these will be used as
95
2. Technical aspects such as mass balance and energy balance and equipment
cost and specifications, are needed to evaluate the plant overall efficiency since
investment, operating expenditure, payback period and rate of return are needed
generated during construction and operation of the plant and the mitigation
measures needed to minimize the impact of the waste generated by the Oil
Refinery plant.
5. Design, which uses a 1:1 ratio of ethylene and benzene as feedstock, shows
that its process is highly efficient, economically viable and has low impact in
the environment. This design option will have the highest potential among the
Recommendations
1. The Oil Refinery plant should always consider a strategic target location to
maximize its resources. Easier access to raw materials and target customers
should always be preferred to lessen costs. The plant should also meet the
96
2. The equipment should be set to function with optimal efficiency since it will