Design Phases
1. Schematic Design Phase
2. Detailed Design Phase
3. For Construction (Required)
4. As-Builts (Required)
V. What do we look for in the plans submitted to
us/to be submitted to the OBO?
3. Sign and Seal of Internet Café's Electronics Plan (maximum of 10units) 1500100/unit
4. Consultancy project cost 10% to 15%
Minimum Acceptance Fee 5000
Per visit charge 1500
1. Voice, Facsimile, Cable TV, Analog CCTV, Pipe in Music 1 to 10 nodes 2500 30
Data (PC, IP-CAM, Wire Routers, Wireless Routers)
2. Fire Alarm System 1 to 10 smoke 2500 30
3. Queuing Machine / Electronics Signage per display 1500 1000
4. ATM Machines 1 to 10 2500 250
B. Broadcast and Telecommunications Facility
1. Preparation, Sign and Seal of Network Diagram / Lay-out for Radio Base stations
and other related Wireless Stations per layout 1800
2. Preparation, Sign and Seal of Technical Plan per location 4000
3. NTC permit that needs PECE signature per permit 3000
IX. PROPOSED FEES (continued…)
X. Ethics in Practrice